Article
Publication date: 29 January 2024

Klaudia Jaskula, Dimosthenis Kifokeris, Eleni Papadonikolaki and Dimitrios Rovas

Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is…

Abstract

Purpose

Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is exposing all relevant data as a single source of truth and facilitating continuous collaboration between stakeholders. A multitude of tools can be used as a CDE, however, it is not clear how the tools are used or if they fulfil the users’ needs. Therefore, this paper aims to investigate current practices of using CDEs for information management during the whole built asset’s life cycle, through a state-of-the-art literature review and an empirical study.

Design/methodology/approach

Literature data is collected according to the PRISMA 2020 guideline for reporting systematic reviews. This paper includes 46 documents in the review and conduct a bibliometric and thematic analysis to identify the main challenges of digital information management. To understand the current practice and the views of the stakeholders using CDEs in their work, this paper used an empirical approach including semi-structured interviews with 15 BIM experts.

Findings

The results indicate that one of the major challenges of CDE adoption is project complexity and using multiple CDEs simultaneously leading to data accountability, transparency and reliability issues. To tackle those challenges, the use of novel technologies in CDE development such as blockchain could be further investigated.

Originality/value

The research explores the major challenges in the practical implementation of CDEs for information management. To the best of the authors’ knowledge, this is the first study on this topic combining a systematic literature review and fieldwork.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 7 December 2022

Dubem Isaac Ikediashi, Otoabasi Asuquo Ansa, Anthony Okwogume Ujene and Sani Reuben Akoh

Building information modelling (BIM) has been established in the literature as a successful platform that creates an intelligent virtual model for processing data from conceptual…

Abstract

Purpose

Building information modelling (BIM) has been established in the literature as a successful platform that creates an intelligent virtual model for processing data from conceptual design through construction to operational stage of a facility. However, its adoption for facilities management (FM) provision in Nigeria has been slow due to inherent barriers. The aim of this paper is to (1) assess and categorise using factor analysis BIM for FM barriers and (2) model the barriers using stakeholders' personal/professional attributes.

Design/methodology/approach

Anchored on quantitative research design, 205 copies of structured questionnaire were distributed to key stakeholders and facilities managers in Nigeria's three strategic cities while 135 valid responses were received giving a response rate of 65.8%. Data collected were analysed using descriptive statistics while multiple regression analysis was used to model the barriers. Kruskal Wallis test was used to test the only hypothesis postulated for the study.

Findings

The study established lack of awareness of BIM for FM, poor supporting infrastructure for Internet services, and lack of education and training as the top three rated barriers militating against adoption of BIM for FM in Nigeria while corruption, widespread mistakes and errors and cultural issues were established as the three least rated barriers. Besides, findings also established eight underlying factors that explained 23 barrier factors used for the study which were subsequently used to develop eight regression models. In effect, gender, professional affiliation, organisation, experience, education, expertise, BIM for FM project type, and location were found to statistically predict the 8 extracted factors driving perceived barriers of BIM for FM adoption in Nigeria.

Practical implications

The study has provided a framework of barrier factors to help stakeholders identify specific barriers for which appropriate measures can be taken to ameliorate consequences of the perceived barriers. Meanwhile, an improved and rejuvenated advocacy on inherent benefits of BIM for facilities management by frontline stakeholders could potentially steer up interests and increased participation of stakeholders on BIM for FM.

Originality/value

The unique study developed the first ever regression model that links BIM for FM barriers to professional attributes of facilities management stakeholders in Nigeria.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 15 June 2023

Amna Salman and Wasiq Ahmad

The Operations and Maintenance (O&M) cost of a facility is typically 60–85% of the total life cycle cost of a building whereas its design and construction cost accounts for only…

Abstract

Purpose

The Operations and Maintenance (O&M) cost of a facility is typically 60–85% of the total life cycle cost of a building whereas its design and construction cost accounts for only 5–10%. Therefore, enhancing and optimizing the O&M of a facility is a crucial issue. In addition, with the increasing complexities in a building's operating systems, more technologically advanced solutions are required for proactively maintaining a facility. Thereby, a tool is needed which can optimize and reduce the cost of facility maintenance. One of the solutions is Augmented or Mixed Reality (AR/MR) technologies which can reduce repair time, training time and streamline inspections. Therefore, the purpose of this study is to establish contextual knowledge of AR/MR application in facilities operation and maintenance and present an implementation framework through the analysis and classification of articles published between 2015 and 2022.

Design/methodology/approach

To effectively understand all AR/MR applications in facilities management (FM), a systematic literature review is performed. The Preferred Reporting Items for Systematic Reviews and Meta-Analysis (PRISMA) protocol was followed for searching and describing the search strategies. Keywords were identified through the concept mapping technique. The Scopus database and Google Scholar were employed to find relevant articles, books and conference papers. A thorough bibliometric analysis was conducted using VOS Viewer and subsequently, a thematic analysis was performed for the selected publications.

Findings

The use of AR/MR within facilities O&M could be categorized into five different application areas: (1) visualization; (2) maintenance; (3) indoor localization and positioning; (4) information management and (5) indoor environment. After a thematic analysis of the literature, it was found that maintenance and indoor localization were the most frequently used research application domains. The chronological evolution of AR/MR in FM is also presented along with the origin of publications, which showed that the technology is out of its infancy stage and is ready for implementation. However, literature showed many challenges hindering this goal, that is (1) reluctance of the organizational leadership to bear the cost of hardware and trainings for the employees, (2) Lack of BIM use in FM and (3) system lagging, crashing and unable to register the real environment. A preliminary framework is presented to overcome these challenges.

Originality/value

This study accommodates a variety of application domains within facilities O&M. The publications were systematically selected from the existing literature and then reviewed to exhibit various AR/MR applications to support FM. There have been no literature reviews that focus on AR and/or MR in the FM and this paper fills the gap by not only presenting its applications but also developing an implementation framework.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 9 October 2023

Mohammad A. Hassanain, Mahmoud A. Zourob and Ahmed M. Ibrahim

This study aims to analyze the facilities managers’ involvement over the project life cycle phases (PLP), based on theoretical knowledge, consensus from empirical assessment of…

Abstract

Purpose

This study aims to analyze the facilities managers’ involvement over the project life cycle phases (PLP), based on theoretical knowledge, consensus from empirical assessment of facilities managers and consultants’ practices.

Design/methodology/approach

A literature review was undertaken to determine the different tasks that facilities managers typically handle, identify project phases and their underlying activities in which facilities managers would be involved. This was followed by targeting a group of consultants to build a consensus, upon the identified involvement of facilities managers, over the PLP, while measuring the level of involvement from a representative group of facilities managers in Saudi Arabia. A matching between the perceptions and practice has been performed to serve as recommendations for future research on improving the practice in Saudi Arabia.

Findings

The involvement of facilities managers in the PLP is relatively low, according to the consultants’ perceptions. Consultants perceive that facilities managers should be involved in more professional activities, which would ultimately improve projects’ delivery to clients.

Practical implications

The involvement of facilities managers over the PLP ensures effective delivery of projects and reduces the multiplicity of challenges at the operation and maintenance phase. The viewing of facility managers’ involvement adds to the effectiveness of their role within the building industry.

Originality/value

This paper investigates the consultants’ perception of the involvement venues for facility managers to perform activities which are evaluated to be “mandatory,” “advantageous” or “not necessary.” The study reflects the state of facilities management practice, and the consensus of consultants toward the role of the facility managers through the PLP.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 6 May 2024

Janet Chang and Ajith Parlikad

Global building failures, such as the Grenfell Tower fire in London, UK, emphasised the need for trustworthy building handover information for safety. However, a notable gap…

Abstract

Purpose

Global building failures, such as the Grenfell Tower fire in London, UK, emphasised the need for trustworthy building handover information for safety. However, a notable gap remains in understanding how reliable handover information can ensure the safety of occupants. This study aims to investigate the use and essential quality of handover information to understand the effects of the quality of information on the management of commercial buildings.

Design/methodology/approach

Ninety-four participants from nine organisations who regularly use handover information to manage multiple commercial buildings participated in the semi-structured interviews. Qualitative thematic coding using interview transcripts was performed to identify the utilisation of handover information and its quality requirements.

Findings

This study reveals that as-built drawings and product information are predominately used to fulfil statutory obligations, comply with the organisation’s internal policies, evaluate asset valuation and make informed decisions about capital investment and operating expenses. The quality dimensions of “accuracy”, “timeliness”, and “completeness” are preferred in combination to achieve desired outcomes.

Research limitations/implications

This study focused on using handover information in the management of commercial buildings. However, its results can offer valuable perspectives for improving its application across various sectors in the built environment.

Practical implications

The findings affirm the need for quality handover information for safety, compliance and efficient management in commercial buildings.

Originality/value

This research significantly contributes to the current knowledge of handover information in the building sector. Given the study findings, building owners are equipped to define specific handover information requirements and quality requisites.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 8 June 2023

Sobah Abbas Petersen, Tor Åsmund Evjen and John Krogstie

The main aim of this paper is to describe the potential benefits of enterprise building information models (EBIMs) for health-care institutions. The main research question…

Abstract

Purpose

The main aim of this paper is to describe the potential benefits of enterprise building information models (EBIMs) for health-care institutions. The main research question addressed is how data from EBIM could be leveraged to create value for hospitals beyond design, construction and traditional facility management.

Design/methodology/approach

Three different prototypes, which use different technologies in combination with EBIM, are described to illustrate different uses of EBIM within the context of a hospital and health-care operations. The case study approach has been used to present the prototypes.

Findings

EBIM data, in combination with other data sources, increases the potential benefits of the data with respect to many health-care-related processes, during the operation of a health-care institution. The benefits of EBIM span beyond the design and construction life cycle phases of a hospital and provide value to a variety of stakeholders in multiple health-care-related processes.

Research limitations/implications

The main limitation of this work is the limited sources of data and information such as the specific methods that were used in the design and development of each of the prototypes and a deeper insight into the design rationale and decisions. Another limitation of this paper is that the findings have not been validated.

Practical implications

This study demonstrates the value of convergence of a number of technologies such as EBIM, data and different types of technologies, throughout the life cycle of a building. This study also highlights the value of building information models (BIMs) data for supporting the design of novel educational and other types of application areas. The practical implications include the value for multiple stakeholders, such as resources planning, fleet and equipment management and contract negotiation. Benefits identified for resource planning can have strategic and financial implications at the management level. For patients, visitors and health-care personnel, there may be reduced infections, cleaner and pleasant facilities as well as a reduction of time to find relevant resources.

Social implications

Social implications" could be replaced by "For patients, visitors and health-care personnel, there may be cleaner and pleasant facilities and easy navigation support through the hospital. Furthermore, enhanced access to knowledge and information about the artefact and assets in the hospital can enhance learning and knowledge sharing.

Originality/value

This study identifies the lack of research in using BIM with other data for value-added services for multiple stakeholders in the operations phase of a hospital and addresses that research gap.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 28 June 2023

Ahmed M. Ibrahim, Mohammad A. Hassanain and Mohamed H. Salaheldin

This research compares consultants' and contractors' professional practices and perspectives on the use of specifications in the engineering of built environment projects.

Abstract

Purpose

This research compares consultants' and contractors' professional practices and perspectives on the use of specifications in the engineering of built environment projects.

Design/methodology/approach

The study initiates with a review of literature, toward realizing (1) the need for inclusion of specifications, throughout the projects' stages (design, tender, construction and handing over), as well as the (2) causes and effects of defective specifications in design and execution of engineered projects. Additionally (3) the study investigates the challenges and causes of specification variations to projects' design and execution. The systematic methodology adopted in this research utilizes frequency indicators, to rank and correlate the perspectives of 60 professionals, who are experienced in consulting and contracting of mega public and private projects.

Findings

The research considers the uncertainties and differences that could be present in engineering developments and use of design specifications for projects' execution and handing over. The two groups of experts' (consultants and contractors) perspectives are usually observed as conflicting, in practice. Practices comparison of their experiences with engineering projects' specifications usability provides unique empirical findings. The analysis and assessment of the experts' knowledge, this research addresses gaps identified in the literature, providing valuable insights.

Originality/value

The study provides in-depth recommendations and discusses possible trends and methods for enhancing specifications' usability in design engineering and execution of built environment projects. The analysis and recommendations present and assess experts' knowledge while bridge gaps identified from the literature.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 5 February 2024

Azzam Raslan, Ali Cheshmehzangi, Dave Towey, Walid Tizani and Georgios Kapogiannis

Currently, owners find it difficult to manage their assets throughout their project life cycle. The fact that asset information models (AIMs) are mandatory as deliverables for…

Abstract

Purpose

Currently, owners find it difficult to manage their assets throughout their project life cycle. The fact that asset information models (AIMs) are mandatory as deliverables for building information modeling-driven projects makes it a key requirement for the client to understand in detail those factors affecting asset operation. Hence, because the Kingdom of Saudi Arabia is the most significant market in the Middle East, this study aims to investigate those factors where blockchain and AIMs could impact the asset management (AM) life cycle.

Design/methodology/approach

Researchers used a hypothesis-based approach over a systematic literature review and a workshop (descriptive statistics) to understand the current challenges in AM. Later, a second workshop was run to understand the impact factor analysis affecting the operation of the asset life cycle by using asset information modeling and blockchain technology over a multiquantitative method.

Findings

Results found that factors affecting the operation of assets could be the improvement of trust and stakeholder’s influences; the availability of handover process products’ accurate data; manufacturers providing detailed product models; increasing the speed of preparing holistic and integrated AM systems; improving collaboration between stakeholders; and returning clients’ investments faster.

Originality/value

Understanding the factors affecting AM life cycle based on the utilization of AIMs and blockchain then allows investors and their team members to work in a secure and collaborative environment that helps them to pre-identify certain risks and improve decision-making in a more effective way, as is required by ISO55000.

Details

Construction Innovation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 10 July 2024

Ahsan Waqar, Idris Bin Othman and Muhammad Shoaib Mansoor

The primary objective of this study is to analyze the correlation between the application of building information modeling (BIM), the construction project success (CPS) and…

Abstract

Purpose

The primary objective of this study is to analyze the correlation between the application of building information modeling (BIM), the construction project success (CPS) and project control. Additionally, this research aims to explore the potential mediating effect of project control on the link between BIM and construction project success in the Malaysian construction industry.

Design/methodology/approach

The present study employs a quantitative research methodology and adheres to a positivist research philosophy in order to examine the influence of BIM implementation on the CPS and project control within the Malaysian construction sector. The data were collected by structured questionnaire survey from 200 respondents using a purposive sampling strategy, and the results were analyzed by using partial least square (PLS)-structural equation modeling (SEM). The study's findings are all the more noteworthy since, despite the small sample size, 218 persons genuinely participated thanks to the purposive sampling approach.

Findings

The findings of this study indicate that there are notable and positive associations between various variables related to the implementation of BIM. These variables include accurate quantities and estimations, risk management, facility management integration, optimized resource allocation and real-time monitoring. Furthermore, these relationships are observed to have a significant impact on both CPS and project control. The study revealed that project control serves as a mediator in the relationship between the deployment of BIM and the CPS in the Malaysian construction sector, with the exception of its influence on risk management.

Originality/value

The originality of this research consists in examining the mediating function of project control in the relationship between BIM implementation and CPS. This study contributes to the existing knowledge by enhancing our understanding of the processes via which BIM positively influences project outcomes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 August 2024

Abdulkabir Opeyemi Bello and Calistus Ayegba

This study aims to investigate the drivers influencing the adoption of building information modelling (BIM) for post-construction management in the architecture, engineering…

Abstract

Purpose

This study aims to investigate the drivers influencing the adoption of building information modelling (BIM) for post-construction management in the architecture, engineering, construction and operations (AECO) industry, specifically focusing on International Facility Management Association (IFMA) registered professionals in Abuja, Nigeria.

Design/methodology/approach

A quantitative approach was employed, using a purposive sampling technique. In total, 132 valid responses were analysed using statistical tools such as Cronbach’s alpha, mean, one sample t-test, Kruskal–Wallis, factor and correction analysis.

Findings

Result shows that flexibility among industry stakeholders towards adopting new technology and safety/emergency management are the most critical drivers. All the identified drivers were significant (p < 0.05). Kruskal–Wallis’s analysis shows that professionals have similar opinions on the BIM drivers. Factor analysis categorises the drivers into seven components: availability and usage of software, increased efficiency, improved performance, safety and resources, change in method of operation, improved profitability and government intervention. Positive correlations connect BIM software availability with efficiency, performance, safety, resource management, operational changes, profitability and government support.

Research limitations/implications

One limitation of this study is the focus on a specific group of professionals in Abuja, which may limit the generalisability of findings to the broader Nigerian AECO industry. Future research should consider a more diverse sample. In addition, qualitative research methods could provide deeper insights into the qualitative aspects of BIM adoption.

Originality/value

This research contributes to the existing body of knowledge by providing empirical evidence of the drivers influencing BIM adoption in the post-construction phase, particularly in Nigeria.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

1 – 10 of 19