Article
Publication date: 12 August 2022

Ewald Kuoribo, Roland Yomoah, De-Graft Owusu-Manu, Alex Acheampong, David John Edwards and Caleb Debrah

The construction industry is beset with unethical behaviours. Although several studies have investigated the effects of unethical behaviours on project performance, research in…

Abstract

Purpose

The construction industry is beset with unethical behaviours. Although several studies have investigated the effects of unethical behaviours on project performance, research in the Ghanaian construction industry (GCI) remains scant. Consequently, this research assesses the interactive effects of ethical and unethical behaviours of construction professionals on project performance in the GCI.

Design/methodology/approach

A quantitative research approach was used to obtain primary data from 68 construction professionals, viz, quantity surveyors, architects, civil engineers, clerk of works and project managers, via a closed-ended questionnaire survey. Data collected were analysed using one-sample t-test and Kruskal–Wallis test statistics, after which two hypotheses were tested and validated using regression analysis.

Findings

Reduction of project risks, avoidance of legal problems and maximisation project quality performance were critical effects of ethical behaviours observed on project performance, whereas the effects of unethical behaviours such as cost overrun, abandonment and time overrun were severe on project performance in the GCI. Ethical behaviour was seen to relate to project performance positively, and unethical behaviour was proved to have dire consequences on project performance.

Practical implications

Construction project performance is greatly influenced by professionals' ethical and unethical behaviours. Emergent findings emanating from this research will assist emerging economies in developing and implementing counter policies and systems that mitigate the unethical behaviours of construction professionals.

Social implications

The study highlights the effects of ethical and unethical behaviours on project performance to reorient individuals' perceptions that unethical behaviours are less critical in the construction industry. Supporting evidence encourages individuals to adhere to ethical behaviours in a project environment.

Research limitations/implications

The inability to obtain data across the entire geographical spread of Ghana is acknowledged as a major limitation of the study and affects the generalisation of the results.

Originality/value

This study constitutes a first attempt to establish the interactive effects of ethical and unethical behaviours of construction professionals on project performance within the GCI. A significant addition to the body of knowledge is that ethical and unethical behaviours impact project performance positively or negatively, respectively.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 February 2024

Navdeep Singh, Deepankar Kumar Ashish and Anuj Dixit

This paper aims to evaluate the construction supply chain (CSC) by examining its relationships with various key areas and its development, identifying gaps and outlining potential…

Abstract

Purpose

This paper aims to evaluate the construction supply chain (CSC) by examining its relationships with various key areas and its development, identifying gaps and outlining potential future research directions that affect the implementation of CSC standards during the timeframe of the United Nations’ “Decade of Action” plans in the past two decades.

Design/methodology/approach

This paper reports on a systematic literature review with bibliometric analysis that investigates publications from around the world on various aspects of CSC. These aspects include research methodology/data collection technique, inquiry mode, country-specific research, focused areas of study, the research aims and publication periods.

Findings

The findings of the study reveal that information technology, information sharing, collaboration, performance measurement and CSC configuration have received considerable attention and analysis. However, financial management, supply chain resilience, logistics, vendor managed inventory and rural CSC have been identified as significant areas that require further investigation since limited attention has been given to them in the existing literature.

Research limitations/implications

CSC is a very dominant topic in the current study, but there are some limitations to it. Scopus and Web of Science databases were used to conduct the study. A future study can therefore consider papers related to other databases. As the focus was specifically dedicated to construction material SC only, the papers associated with SCs of labours and equipment have been eradicated.

Originality/value

To the best of the authors’ knowledge, this is the first structured and systematic literature review that identifies the issues related to the CSC during the timeframe of the United Nations’ “Decade of Action” plans and proposes future research directions to enhance the effectiveness and efficiency of CSC.

Details

Journal of Global Operations and Strategic Sourcing, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-5364

Keywords

Article
Publication date: 1 September 2022

Bashir Tijani, Xiaohua Jin and Robert Osei-Kyei

Due to the frenetic and dynamic working conditions ascribed to architecture, engineering and construction (AEC) project organizations, enormous research has addressed the poor…

Abstract

Purpose

Due to the frenetic and dynamic working conditions ascribed to architecture, engineering and construction (AEC) project organizations, enormous research has addressed the poor mental health propensity of project management practitioners (PMPs). However, research has not considered the distant factors related to organizational design causing poor mental health. Therefore, this study addresses the problem by integrating institutional theory, agency theory and resource-based theory (RBT) to explore the relationship between organizational design elements: project governance, knowledge management, integrated project delivery, project management skills and mental health management indicators. Examples of mental health management indicators include social relationships, work-life balance and project leadership.

Design/methodology/approach

Purposive sampling method was adopted to collect survey data from 90 PMPs in 60 AEC firms in Australia. Structural equation modelling (SEM) was utilized to test the relationship between the variables.

Findings

The research found that project governance, knowledge management and integrated project delivery are positively correlated to mental health management indicators. However, the research finding suggests that project management skills have a negative impact on mental health management indicators.

Originality/value

The findings offer guidelines to AEC firms on achieving positive mental health management outcomes through concentration on project governance, knowledge management and integrated project delivery. It further calls for a reconsideration of existing project management skills causing poor mental health management outcomes.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 September 2022

Qian Zhang, Bee Lan Oo and Benson Teck-Heng Lim

The interest in corporate social responsibility (CSR) has become burgeoning in the construction industry as firms are under constant pressure from socially conscious stakeholders…

Abstract

Purpose

The interest in corporate social responsibility (CSR) has become burgeoning in the construction industry as firms are under constant pressure from socially conscious stakeholders to demonstrate their efforts to address various CSR issues. This study aims to unveil the key practices and impact factors (KPIFs) of CSR implementation in construction firms and the interrelationships among different key impact factors toward attaining CSR practices.

Design/methodology/approach

Mobilizing the integrated institutional, stakeholder and self-determination theories, a theoretical framework was first developed to elaborate the potential inter-relationships among the key impact factors toward CSR implementation. Data were collected from extra-grade contractors through an online questionnaire survey and was then analyzed by the partial least square structural equation modeling method.

Findings

The results show that construction firms' CSR practices could be classified into eight distinct key dimensions, e.g. shareholders' interests, government commitment and environment preservation. It is found that three groups of key impact factors – external institutional factors (especially coercive-normative factors), intrinsic factors (especially strategic business direction and organizational culture) and identified factors (i.e. the perceived importance of CSR practices) – have statistically significant positive impacts on most key dimensions of CSR practices.

Practical implications

The research findings have implications for top management to better understand CSR implementation, thereby helping them secure legitimacy to survive and advance in the competitive construction businesses.

Originality/value

The findings contribute to the theoretical body of knowledge in CSR by modeling and empirically demonstrating the influence mechanism of CSR implementation in construction within an integrated model.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 August 2022

Sitsofe Kwame Yevu, Ann Tit Wan Yu, Amos Darko, Gabriel Nani and David J. Edwards

This study aims to investigate the dynamic influences of clustered barriers that hinder electronic procurement technology (EPT) implementation in construction procurement, using…

Abstract

Purpose

This study aims to investigate the dynamic influences of clustered barriers that hinder electronic procurement technology (EPT) implementation in construction procurement, using the neuro-fuzzy system.

Design/methodology/approach

A comprehensive literature review was conducted and 21 barriers to EPT implementation within construction projects were identified. Based on an expert survey, 121 datasets were gathered for this study. Using mean and normalization analysis for the datasets, 15 out of the 21 barriers were deemed to have critical influences in EPT barriers phenomenon. Subsequently, the critical barriers were classified into five groups: human-related; technological risk-related; government-related; industry growth-related; and financial-related. The relationships and influence patterns between the groups of barriers to EPT implementation were analyzed using the neuro-fuzzy system. Furthermore, sensitivity analysis was performed to examine the dynamic influence levels of the barriers within the hindrance level composition.

Findings

The results reveal that addressing one barrier group does not reduce the high levels of hindrances experienced in EPT implementation. However, addressing at least two barrier groups mostly tends to reduce the hindrance levels for EPT implementation. Further, this study revealed that addressing some barrier group pairings, such as technological risk-related and government-related barriers, while other barrier groups remained at a high level, still resulted in high levels of hindrances to EPT implementation in construction procurement.

Research limitations/implications

This study provides insights for researchers to help them contribute to the development of theory with contemporary approaches based on the influence patterns of barrier interrelationships.

Practical implications

This study provides a model that would help practitioners and decision makers in construction procurement to understand and effectively determine the complex and dynamic influences of barrier groups to EPT uptake, for the development of suitable mitigation strategies.

Originality/value

This study provides novel insights into the complex influence patterns among grouped barriers concerning EPT adoption in the construction industry. Researchers and practitioners are equipped with knowledge on the influence patterns of barriers. This knowledge aids the development of effective strategies that mitigate the combined groups of barriers, and promote the wider implementation of EPT in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 November 2022

Minh Van Nguyen

This study aims to identify and prioritize barriers to corporate social responsibility (CSR) in the construction sector.

Abstract

Purpose

This study aims to identify and prioritize barriers to corporate social responsibility (CSR) in the construction sector.

Design/methodology/approach

A literature review was first conducted to identify barriers to CSR performance. After that, construction professionals were invited to validate the appropriateness of the obstacles. The discussion allowed the establishment of a list of barriers to CSR performance and their corresponding categories. Data collected from the survey were then analyzed to prioritize the importance of these barriers by the fuzzy DEMATEL-based ANP (DANP) technique.

Findings

The findings presented 16 barriers to CSR, which were categorized into four clusters. The fuzzy DANP analysis showed that strategic vision is the most crucial cluster, followed by the measurement system, stakeholder perspective and scarce resources. Among the sixteen barriers examined, lack of awareness, knowledge and information of CSR; low priority of CSR; lack of metrics to quantify CSR benefits; lack of guidelines and coherent strategies; and lack of CSR enforcement mechanism are the five most crucial barriers.

Originality/value

This study is one of the first that proposes a comprehensive model to prioritize barriers to CSR performance of contractors considering their interrelationships. It provides construction stakeholders with a framework for understanding the linkage between the barriers and CSR framework under the umbrella of stakeholder theory. Thus, the findings might assist construction practitioners and academics in fostering the success of CSR implementation.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 September 2023

Mohammad Mayouf and Ciaran Gilligan

In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered…

Abstract

Purpose

In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered ambiguous and provides a limited reflection of the issue, which makes it complicated to trace how it originates in the first place. This study aims to examine the causes that lead to underpayments and develop a holistic synthesis of underpayments for subcontractors in the lifecycle of a construction project.

Design/methodology/approach

An open-ended and closed-ended questionnaire was used to collect the data using purposeful sampling with 28 construction stakeholders who ranged from main contractors, subcontractors and others (Small medium enterprises SMEs, Consultancies, Clients etc.). Data collected was analysed to trace drivers and the impact of underpayment and suggested mitigation strategies to be identified whilst viewing the perspectives of a main contractor and subcontractor.

Findings

The findings show that the most prominent driver for underpayments is variation disputes followed by cash flow. The research also suggests mitigation strategies such as collaborative working, more robust budget control and early identification of risks as potential remedies to overcome the underpayment issue. The research concludes with a framework that elicits the complexity underlying underpayments for subcontractors in construction projects.

Originality/value

The research evolves the understanding that underpayment is a complex phenomenon, relying heavily on the data/information exchange mechanism between the main contractor and subcontractors. This research provokes the need to understand underpayment further so it can be mitigated.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 6 February 2024

Luwei Zhao, Qing’e Wang, Bon-Gang Hwang and Alice Yan Chang-Richards

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification…

Abstract

Purpose

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification (MICMAC) to investigate the influencing factors of sustainable infrastructure vulnerability (SIV).

Design/methodology/approach

(1) Literature review and case study were used to identify the possible influencing factors; (2) a semi-structured interview was conducted to identify representative factors and the interrelationships among influencing factors; (3) ISM was adopted to identify the hierarchical structure of factors; (4) MICMAC was used to analyze the driving power (DRP) and dependence power (DEP) of each factor and (5) Semi-structured interview was used to propose strategies for overcoming SIV.

Findings

Results indicate that (1) 18 representative factors related to SIV were identified; (2) the relationship between these factors was divided into a five-layer hierarchical structure. The 18 representative factors were divided into driving factors, dependent factors, linkage factors and independent factors and (3) 12 strategies were presented to address the negative effects of these factors.

Originality/value

The findings illustrate the factors influencing SIV and their hierarchical structures, which can benefit the stakeholders and practitioners of an infrastructure project by encouraging them to take effective countermeasures to deal with related SIVs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 May 2023

Ayuba Jerry Likita, Mostafa Babaeian Jelodar, V Vishnupriya and James Olabode Bamidele Rotimi

The construction industry is inefficient in terms of quality products, productivity and performance worldwide, including in Australia and New Zealand. The construction industry is…

Abstract

Purpose

The construction industry is inefficient in terms of quality products, productivity and performance worldwide, including in Australia and New Zealand. The construction industry is becoming more innovative, competitive and complex; and more participants are involved in construction projects. There are new attempts to implement the Lean construction philosophy, integrated project delivery method and building information modelling (BIM) technology in construction industry to improve productivity and efficiency. This paper aims to identify Lean and BIM integration benefits in construction industry globally and in the New Zealand.

Design/methodology/approach

A systematic literature review and case studies were used to identify various benefits of the integrating Lean and BIM in construction industry. It focused on articles published between 1995 and 2021.

Findings

Lean and BIM benefits identified in the study were documented such as benefits over the traditional approach, critically increased efficiency and visualization, better building process, better building performance, mitigating risk and reduce cost. Also, several factors were identified as major benefits such as improved onsite collaboration, better coordination, improve onsite communication, increase productivity, mitigating risk, reducing waste and reduced cost. The study showed integrating Lean and BIM in construction management practice will help reduce several challenges which affect expected goals and customer anticipation. The research outcome ultimately will assist different stakeholders in applying Lean and BIM in construction management practice.

Originality/value

This study practically focused on using the integration of BIM and Lean principles to improve the construction industry productivity and performance.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175