Search results

1 – 8 of 8
Article
Publication date: 5 September 2016

Emre Cevikcan

Walking-worker assembly lines can be regarded as an effective method to achieve the above-mentioned characteristics. In such systems, workers, following each other, travel…

Abstract

Purpose

Walking-worker assembly lines can be regarded as an effective method to achieve the above-mentioned characteristics. In such systems, workers, following each other, travel workstations in sequence by performing all of the required tasks of their own product. As the eventual stage of assembly line design, efforts should be made for capacity adjustments to meet the demand in terms of allocating tasks to workers via assembly line balancing. In this context, the purpose of this study is to address the balancing problem for multi-model walking-worker assembly systems, with the aim of improving planning capability for such systems by means of developing an optimization methodology.

Design/methodology/approach

Two linear integer programming models are proposed to balance a multi-model walking-worker assembly line optimally in a sequential manner. The first mathematical programming model attempts to determine number of workers in each segment (i.e. rabbit chase loop) for each model. The second model generates stations in each segment to smooth workflow. What is more, heuristic algorithms are provided due to computational burden of mathematical programming models. Two segment generation heuristic algorithms and a station generation heuristic algorithm are provided for the addressed problem.

Findings

The application of the mathematical programming approach improved the performance of a tap-off box assembly line in terms of number of workers (9.1 per cent) and non-value-added time ratio (between 27.9 and 26.1 per cent for different models) when compared to a classical assembly system design. In addition, the proposed approach (i.e. segmented walking-worker assembly line) provided a more convenient working environment (28.1 and 40.8 per cent shorter walking distance for different models) in contrast with the overall walking-worker assembly line. Meanwhile, segment generation heuristics yielded reduction in labour requirement for a considerable number (43.7 and 49.1 per cent) of test problems. Finally, gaps between the objective values and the lower bounds have been observed as 8.3 per cent (Segment Generation Heuristic 1) and 6.1 (Segment Generation Heuristic 2).

Practical implications

The proposed study presents a decision support for walking-worker line balancing with high level of solution quality and computational performance for even large-sized assembly systems. That being the case, it contributes to the management of real-life assembly systems in terms of labour planning and ergonomics. Owing to the fact that the methodology has the potential of reducing labour requirement, it will present the opportunity of utilizing freed-up capacity for new lines in the start-up period or other bottleneck processes. In addition, this study offers a working environment where skill of the workers can be improved within reasonable walking distances.

Originality/value

To the best knowledge of the author, workload balancing on multi-model walking-worker assembly lines with rabbit chase loop(s) has not yet been handled. Addressing this research gap, this paper presents a methodology including mathematical programming models and heuristic algorithms to solve the multi-model walking-worker assembly line balancing problem for the first time.

Details

Assembly Automation, vol. 36 no. 4
Type: Research Article
ISSN: 0144-5154

Keywords

Article
Publication date: 2 October 2023

Ahmet Selcuk Yalcin, Huseyin Selcuk Kilic and Emre Cevikcan

The purpose of this article is to develop a new model called strategy segmentation methodology (SSM) by combining the Kraljic portfolio matrix (KPM) and the supplier relationship…

Abstract

Purpose

The purpose of this article is to develop a new model called strategy segmentation methodology (SSM) by combining the Kraljic portfolio matrix (KPM) and the supplier relationship model (SRM) so that the buyer company can effectively conduct its relations with its suppliers.

Design/methodology/approach

The importance weights of the criteria defining the dimensions of each model are calculated with the single-valued neutrosophic analytical hierarchy process (SVN-AHP) method. Subsequently, the derived importance weights are employed in the single-valued neutrosophic technique for order preference by similarity to ideal solution (SVN-TOPSIS) method to obtain the scores of the suppliers and their supplied items. In order to illustrate the feasibility of the proposed methodology, a case study in the machinery industry is performed with the related comparative analysis.

Findings

The implementation of SSM enables to formulate various strategies to manage suppliers taking into account the items they procure, their capabilities and performance and the supplier–buyer relationship strength. Based on the proposed strategies, it is concluded that the firm in the case study should terminate its relationship with six of its suppliers.

Originality/value

Although KPM has become the basis of purchasing strategies for various businesses, it neglects the characteristics of suppliers and the buyer–supplier relationship. In this study, KPM is integrated with the SRM approach presented by Olsen and Ellram (1997) to overcome these disadvantages of KPM. The novel integration of the two approaches enables the realization of a robust and reliable supplier classification model.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 1 May 2020

Emre Cevikcan and Mehmet Bulent Durmusoglu

Rabbit chase (RC) is used as one of the most effective techniques in manufacturing systems, as such systems have high level of adaptability and increased productivity in addition…

Abstract

Purpose

Rabbit chase (RC) is used as one of the most effective techniques in manufacturing systems, as such systems have high level of adaptability and increased productivity in addition to providing uniform workload balancing and skill improving environment. In assembly systems, RC inspires the development of walking worker assembly line (WWAL). On the other hand, U-type assembly lines (UALs) may provide higher worker utilization, lower space requirement and more convenient internal logistics when compared to straight assembly lines. In this context, this study aims to improve assembly line performance by generating RC cycles on WWAL with respect to task assignment characteristics of UAL within reasonable walking distance and space requirement. Therefore, a novel line configuration, namely, segmented rabbit chase-oriented U-type assembly line (SRCUAL), emerges.

Design/methodology/approach

The mathematical programming approach treats SRCUAL balancing problem in a hierarchical manner to decrease computational burden. Firstly, segments are generated via the first linear programming model in the solution approach for balancing SRCUALs to minimize total number of workers. Then, stations are determined within each segment for forward and backward sections separately using two different pre-emptive goal programming models. Moreover, three heuristics are developed to provide solution quality with computational efficiency.

Findings

The proposed mathematical programming approach is applied to the light-emitting diode (LED) luminaire assembly section of a manufacturing company. The adaptation of SRCUAL decreased the number of workers by 15.4% and the space requirement by 17.7% for LED luminaire assembly system when compared to UAL. Moreover, satisfactory results for the proposed heuristics were obtained in terms of deviation from lower bound, especially for SRCUAL heuristics I and II. Moreover, the results indicate that the integration of RC not only decreased the number of workers in 40.28% (29 instances) of test problems in U-lines, but also yielded less number of buffer points (48.48%) with lower workload deviation (75%) among workers in terms of coefficient of variation.

Practical implications

This study provides convenience for capacity management (assessing capacity and adjusting capacity by changing the number of workers) for industrial SRCUAL applications. Meanwhile, SRCUAL applications give the opportunity to increase the capacity for a product or transfer the saved capacity to the assembly of other products. As it is possible to provide one-piece flow with equal workloads via walking workers, SRCUAL has the potential for quick realization of defects and better lead time performance.

Originality/value

To the best of the authors’ knowledge, forward–backward task assignments in U-type lines have not been adapted to WWALs. Moreover, as workers travel overall the line in WWALs, walking time increases drastically. Addressing this research gap and limitation, the main innovative aspect of this study can be considered as the proposal of a new line design (i.e. SRCUAL) which is sourced from the hybridization of UALs and WWAL as well as the segmentation of the line with RC cycles. The superiority of SRCUAL over WWAL and UAL was also discussed. Moreover, operating systematic for SRCUAL was devised. As for methodical aspect, this study is the first attempt to solve the balancing problem for SRCUAL design.

Details

Assembly Automation, vol. 40 no. 3
Type: Research Article
ISSN: 0144-5154

Keywords

Article
Publication date: 7 April 2021

Emre Cevikcan and Yildiz Kose

An appropriate space allocation among different residence types gives higher profitability and liquidity for cash flow management in real estate projects for developers. Thereby…

Abstract

Purpose

An appropriate space allocation among different residence types gives higher profitability and liquidity for cash flow management in real estate projects for developers. Thereby, a balance between debt and equity should be kept for capital formation in developers where high level of cost, profit and risk exists. The purpose of this paper is to provide cash flow optimization under debt and equity financing while providing an appropriate space allocation of residence types via synchronous consideration of profitability and liquidity.

Design/methodology/approach

A novel optimization methodology that includes project financing, optimization and experimental design modules is proposed. The first module, project financing, considers the flexibility of utilizing one or both of debt financing and equity financing when making capital. The optimization module addresses space allocation among different residence types for a construction while maximizing profitability and liquidity using two mixed-integer linear programming models in a pre-emptive manner. The experimental design module assesses the effects of decisive parameters within the methodology via multivariate analysis of variance (MANOVA).

Findings

The proposed methodology is applied to a real-life residential project in Istanbul. The optimization module yielded 42.5% profitability via the first linear programming model and 2.2% trade-off between liquidity and profitability while minimizing the payback period by the second linear programming model. Meanwhile, MANOVA results showed that profit per square meter and sale rate trends are the most prominent factors considering their significant effects on net present value and payback period.

Originality/value

To the best knowledge of the author, related papers focused only on profitability under equity financing. Liquidity (as an objective) and equity financing (as a financing method) have not been handled. Hence, this paper not only performs profitability and liquidity-oriented cash flow optimization under debt and equity financing but also optimizes space allocation of residences for the first time.

Details

Built Environment Project and Asset Management, vol. 11 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 8 September 2022

Yildiz Kose, Suleyman Muftuoglu, Emre Cevikcan and Mehmet Bulent Durmusoglu

Autonomous maintenance (AM), one of the pillars of total productive maintenance (TPM), aims to achieve performance toward zero defects and zero breakdowns. AM system equipped with…

848

Abstract

Purpose

Autonomous maintenance (AM), one of the pillars of total productive maintenance (TPM), aims to achieve performance toward zero defects and zero breakdowns. AM system equipped with comprehensive lean tools provides continuous improvement during the AM activities. Despite its long duration, establishing a lean AM system with a robust guideline would provide significant benefits such as high quality and short lead time. Therefore, AM design approach should be provided in a holistic and detailed manner. This study aims to develop a framework for AM design, including preliminary, reactive, preventive and proactive steps using the axiomatic design (AD).

Design/methodology/approach

Requirements and technical parameters of the AM system are explored with AD. An extensive literature review and a real-life application are presented.

Findings

The proposed design was validated by adapting the proposed roadmap to a textile manufacturing system in Turkey. The application results justify the established AM system design with an average downtime improvement of 69.2% and the average elapsed time between two failures improvement of 65.1% for apparel department.

Originality/value

This study has the novelty of establishing an overall AM system design with all of its stages stepwise. It presents a comprehensive guideline in terms of integration of lean philosophy into AM design by generating maintenance-related use cases for lean tools. The developed approach facilitates creating and analyzing complex systems to improve maintenance implementations while reducing nonvalue-added operations.

Details

International Journal of Lean Six Sigma, vol. 14 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 22 April 2022

Suleyman Muftuoglu, Emre Cevikcan and Bulent Durmusoglu

The purpose of this paper is to support total productive maintenance implementers by providing a roadmap for autonomous maintenance (AM) preparation phase.

Abstract

Purpose

The purpose of this paper is to support total productive maintenance implementers by providing a roadmap for autonomous maintenance (AM) preparation phase.

Design/methodology/approach

The authors use the axiomatic design (AD) methodology with lean philosophy as a paradigm.

Findings

This is an exploratory research to find the most important factors in AM preparation phase. A decoupled AD design ensures an effective usage of training within industry (TWI) and the introduction of standardized work (SW). TWI provides value in importance it assigns to leaders, with its “train the trainers” approach and in preparing a training program. Besides being an effective training method, TWI job instruction (TWI JI) provides needed information infrastructure to front load operators SW and equipment trainings.

Research limitations/implications

Although AD, TWI and lean artifacts are generally field proven, the research is limited due to the lack of an industrial application.

Practical implications

In many real-life projects, companies do not know where to start and how to proceed, which leads to costly iterations. The proposed roadmap minimizes iterations and increases the chance of project success.

Originality/value

The authors apply AD for the first time to AM preparation phase despite it is used in the analysis of lean manufacturing. AD permits to structure holistically the most relevant lean manufacturing solutions to obtain a risk free roadmap. TWI has emerged as a training infrastructure; TWI JI-based operator SW training and the adaptation of JI structure to equipment training are original additions.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 2
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 28 January 2014

Emre Cevikcan

It has become increasingly critical to design and maintain flexible and rapid assembly systems due to unpredictable and varying market conditions. The first stage of developing…

Abstract

Purpose

It has become increasingly critical to design and maintain flexible and rapid assembly systems due to unpredictable and varying market conditions. The first stage of developing such systems is to restructure the existing assembly system. After designing the manufacturing system, efforts should be made for capacity adjustments to meet the demand in terms of allocating tasks to workers. Walking-worker assembly systems can be regarded as an effective method to achieve flexibility and agility via rabbit chase (RC) approach in which workers follow each other around the assembly cell or line and perform each task in sequence. In this paper, a novel mathematical programming approach is developed with the aim of integrating RC in assembly processes. Therefore, this study is thought to add value to industrial assembly systems in terms of effectively raising engineering control for task allocation activities.

Design/methodology/approach

Two consecutive mathematical models are developed, since such a hierarchical approach provides computational convenience for the problem. The initial mathematical programming model determines the number of workers in each RC loop for each segment. In addition, the number of stations and the distribution of station times in the segments is essential. Therefore, the succeeding mathematical programming model generates stations in each segment and provides convenience for the workflow in RC loops. The output of mathematical programming models are the parameters of simulation model for performance assessment.

Findings

The effectiveness of the proposed approach was validated by an application in a real-life chair production system. The application resulted in performance improvements for labour requirement (12.5 per cent) and production lead time (9.6 per cent) when compared to a classical assembly system design (CASD) where one stationary worker exists in each station. In addition, it is worth to note that RC leads to a reduced number of workers for a considerable number (39.4 per cent) of test problems. What is more, input as well as output factors have been determined via discriminant analysis and their impacts to the utilization of RC were analyzed for different levels.

Practical implications

This study is thought to add value to the industry in terms of effectively providing convenience during production planning and task allocation in assembly lines and cells.

Originality/value

To the best knowledge of the author, optimization models for RC considering a real industrial application have not yet been developed. In this context, this paper presents an approach which models RC by the use of mathematical programming in manual assembly processes to address this research gap. The contribution of the paper to the relevant literature is the development of hierarchical mixed integer linear programming models to solve RC problem for the first time.

Details

Assembly Automation, vol. 34 no. 1
Type: Research Article
ISSN: 0144-5154

Keywords

Article
Publication date: 26 July 2011

Cengiz Kahraman, İhsan Kaya and Emre Çevikcan

The purpose of this paper is to show how intelligence techniques have been used in information management systems.

8229

Abstract

Purpose

The purpose of this paper is to show how intelligence techniques have been used in information management systems.

Design/methodology/approach

The results of a literature review on intelligence decision systems used in enterprise information management are analyzed. The intelligence techniques used in enterprise information management are briefly summarized.

Findings

Intelligence techniques are rapidly emerging as new tools in information management systems. Especially, intelligence techniques can be used to utilize the decision process of enterprises information management. These techniques can increase sensitiveness, flexibility and accuracy of information management systems. The hybrid systems that contain two or more intelligence techniques will be more used in the future.

Originality/value

The intelligence decision systems are briefly introduced and then a literature review is given to show how intelligence techniques have been used in information management systems.

Details

Journal of Enterprise Information Management, vol. 24 no. 4
Type: Research Article
ISSN: 1741-0398

Keywords

1 – 8 of 8