Search results
1 – 10 of over 1000Farshad Peiman, Mohammad Khalilzadeh, Nasser Shahsavari-Pour and Mehdi Ravanshadnia
Earned value management (EVM)–based models for estimating project actual duration (AD) and cost at completion using various methods are continuously developed to improve the…
Abstract
Purpose
Earned value management (EVM)–based models for estimating project actual duration (AD) and cost at completion using various methods are continuously developed to improve the accuracy and actualization of predicted values. This study primarily aimed to examine natural gradient boosting (NGBoost-2020) with the classification and regression trees (CART) base model (base learner). To the best of the authors' knowledge, this concept has never been applied to EVM AD forecasting problem. Consequently, the authors compared this method to the single K-nearest neighbor (KNN) method, the ensemble method of extreme gradient boosting (XGBoost-2016) with the CART base model and the optimal equation of EVM, the earned schedule (ES) equation with the performance factor equal to 1 (ES1). The paper also sought to determine the extent to which the World Bank's two legal factors affect countries and how the two legal causes of delay (related to institutional flaws) influence AD prediction models.
Design/methodology/approach
In this paper, data from 30 construction projects of various building types in Iran, Pakistan, India, Turkey, Malaysia and Nigeria (due to the high number of delayed projects and the detrimental effects of these delays in these countries) were used to develop three models. The target variable of the models was a dimensionless output, the ratio of estimated duration to completion (ETC(t)) to planned duration (PD). Furthermore, 426 tracking periods were used to build the three models, with 353 samples and 23 projects in the training set, 73 patterns (17% of the total) and six projects (21% of the total) in the testing set. Furthermore, 17 dimensionless input variables were used, including ten variables based on the main variables and performance indices of EVM and several other variables detailed in the study. The three models were subsequently created using Python and several GitHub-hosted codes.
Findings
For the testing set of the optimal model (NGBoost), the better percentage mean (better%) of the prediction error (based on projects with a lower error percentage) of the NGBoost compared to two KNN and ES1 single models, as well as the total mean absolute percentage error (MAPE) and mean lags (MeLa) (indicating model stability) were 100, 83.33, 5.62 and 3.17%, respectively. Notably, the total MAPE and MeLa for the NGBoost model testing set, which had ten EVM-based input variables, were 6.74 and 5.20%, respectively. The ensemble artificial intelligence (AI) models exhibited a much lower MAPE than ES1. Additionally, ES1 was less stable in prediction than NGBoost. The possibility of excessive and unusual MAPE and MeLa values occurred only in the two single models. However, on some data sets, ES1 outperformed AI models. NGBoost also outperformed other models, especially single models for most developing countries, and was more accurate than previously presented optimized models. In addition, sensitivity analysis was conducted on the NGBoost predicted outputs of 30 projects using the SHapley Additive exPlanations (SHAP) method. All variables demonstrated an effect on ETC(t)/PD. The results revealed that the most influential input variables in order of importance were actual time (AT) to PD, regulatory quality (RQ), earned duration (ED) to PD, schedule cost index (SCI), planned complete percentage, rule of law (RL), actual complete percentage (ACP) and ETC(t) of the ES optimal equation to PD. The probabilistic hybrid model was selected based on the outputs predicted by the NGBoost and XGBoost models and the MAPE values from three AI models. The 95% prediction interval of the NGBoost–XGBoost model revealed that 96.10 and 98.60% of the actual output values of the testing and training sets are within this interval, respectively.
Research limitations/implications
Due to the use of projects performed in different countries, it was not possible to distribute the questionnaire to the managers and stakeholders of 30 projects in six developing countries. Due to the low number of EVM-based projects in various references, it was unfeasible to utilize other types of projects. Future prospects include evaluating the accuracy and stability of NGBoost for timely and non-fluctuating projects (mostly in developed countries), considering a greater number of legal/institutional variables as input, using legal/institutional/internal/inflation inputs for complex projects with extremely high uncertainty (such as bridge and road construction) and integrating these inputs and NGBoost with new technologies (such as blockchain, radio frequency identification (RFID) systems, building information modeling (BIM) and Internet of things (IoT)).
Practical implications
The legal/intuitive recommendations made to governments are strict control of prices, adequate supervision, removal of additional rules, removal of unfair regulations, clarification of the future trend of a law change, strict monitoring of property rights, simplification of the processes for obtaining permits and elimination of unnecessary changes particularly in developing countries and at the onset of irregular projects with limited information and numerous uncertainties. Furthermore, the managers and stakeholders of this group of projects were informed of the significance of seven construction variables (institutional/legal external risks, internal factors and inflation) at an early stage, using time series (dynamic) models to predict AD, accurate calculation of progress percentage variables, the effectiveness of building type in non-residential projects, regular updating inflation during implementation, effectiveness of employer type in the early stage of public projects in addition to the late stage of private projects, and allocating reserve duration (buffer) in order to respond to institutional/legal risks.
Originality/value
Ensemble methods were optimized in 70% of references. To the authors' knowledge, NGBoost from the set of ensemble methods was not used to estimate construction project duration and delays. NGBoost is an effective method for considering uncertainties in irregular projects and is often implemented in developing countries. Furthermore, AD estimation models do fail to incorporate RQ and RL from the World Bank's worldwide governance indicators (WGI) as risk-based inputs. In addition, the various WGI, EVM and inflation variables are not combined with substantial degrees of delay institutional risks as inputs. Consequently, due to the existence of critical and complex risks in different countries, it is vital to consider legal and institutional factors. This is especially recommended if an in-depth, accurate and reality-based method like SHAP is used for analysis.
Details
Keywords
Ozan Okudan, Murat Cevikbas and Zeynep Işık
The purpose of this paper is to propose a decision support framework that can be used by decision-makers to identify the most convenient disruption analysis (DA) methods for…
Abstract
Purpose
The purpose of this paper is to propose a decision support framework that can be used by decision-makers to identify the most convenient disruption analysis (DA) methods for megaprojects and their stakeholders.
Design/methodology/approach
The framework was initially developed by conducting a comprehensive literature review to obtain extensive knowledge about disruption management and megaprojects. Focus group discussion (FGD) sessions with the participation of the construction practitioners were then organized to validate and strengthen the findings of the literature review. Consequently, 17 selection factors were identified and categorized as requirement, ability and outcome. Lastly, the most convenient DA methods for megaprojects were identified by performing integrated fuzzy analytical hierarchy process (AHP) and fuzzy technique for order of preference by similarity to ideal solution (TOPSIS) analysis. Additionally, consistency analysis was also conducted to verify the reliability of the results.
Findings
The results revealed that the measured mile method is the most appropriate DA method for megaprojects. In case the measured mile method cannot be adopted due to various technical and contractual reasons, the decision-makers are proposed to consider program analysis, work or trade sampling, earned value analysis and control chart method, respectively. Second, the selection factors such as “Comprehensible analysis procedure,” “Existing knowledge and experience about a particular DA method,” “Ability to resolve greater number of disruption events,” “Ability to resolve complex disruption events,” “Ability to exclude factors that are not under the owner's responsibility” and “General acceptance by practitioners, courts, and arbitration, etc.” were given the top priority by the experts, highlighting the critical aspects of the DA methods.
Originality/value
Disruption claims in megaprojects are very critical for the contractors to compensate for the losses stemming from disruption events. Although the effective use of DA methods maximizes the accuracy and reliability of disruption claims, decision-makers can barely implement these methods adequately since past studies neglect to present extensive knowledge about the most convenient DA methods for megaprojects. Thus, developing a decision support framework for the selection of DA methods, this study is the earliest attempt that examines the mechanisms and inherent differences of DA methods. Additionally, owing to the robustness and versatility of this research approach, the research approach could be replicated also for future studies focusing on other project-based industries since disruption is also a challenging issue for many other industries.
Details
Keywords
An Thi Hoai Le and Monty Sutrisna
This paper reports the developments of a project cost control system (PCCS) for construction projects to (1) measure its current level of cost control maturity, (2) examine the…
Abstract
Purpose
This paper reports the developments of a project cost control system (PCCS) for construction projects to (1) measure its current level of cost control maturity, (2) examine the relationships between elements within PCCS processes and (3) identify improvement areas.
Design/methodology/approach
This study adopts a mixed approach of descriptive analysis and partial least squares structural equation modelling (PLS-SEM) to measure the current maturity level of PCCS and evaluate the relationships between elements within PCSS to identify improvement areas. Further importance-performance matrix analysis (IPMA) of priority constructs was conducted to improve a target construct and identify the most important areas of specific actions at indicator levels. The results of IPMA revealed the contrast that has the greatest importance on the performance of others so that the recommendations can be made accordingly. Data collected in New Zealand were used to develop the research model.
Findings
This study develops structural and measurement models with the constructs including pre-control, in-control and post-control processes, enablers and their proposed interrelationships. Then, data from survey of 184 experienced project cost control team members reveal that post-control has the lowest maturity or weakest areas in the PCCS. Data analysis facilitated by PLS-SEM confirmed that all the constructs in the structural model have positive and significant relationships with each other and suggested that systematic cost analysis reports, communication, skills and experience, defining roles and responsibilities, and top management's support should be the highest priority for improving the PCCS in a more effective manner.
Originality/value
This study presents one of the earliest attempts to develop and test an integrated model that links sub-processes in PCCS and their enablers. Secondly, this research adds to the construction project management literature by empirically verifying the roles of enablers in enhancing maturity level of PCCS.
Details
Keywords
Mojdeh Naderi, Ahad Nazari, Ali Shafaat and Sepehr Abrishami
This study addresses the prevailing complexities and limitations in estimating and managing construction overhead costs (COCs) in the existing literature, with the purpose of…
Abstract
Purpose
This study addresses the prevailing complexities and limitations in estimating and managing construction overhead costs (COCs) in the existing literature, with the purpose of enhancing the accuracy of cost performance indicators in construction project management.
Design/methodology/approach
An innovative approach is proposed, employing the activity-based costing (ABC) accounting method combined with building information modelling (BIM) to assign real overhead costs to project activities. This study, distinguished by its incorporation of a real case study, focuses on an administrative building with a four-story concrete structure. It establishes an automated method for evaluating project cost performance through the detailed analysis of earned value management (EVM) cost indicators derived from ABC results and BIM data.
Findings
The results show that the ABC integration improves the accuracy of cost performance indicators by over 9%, revealing the project's true cost index for the first time and demonstrating the substantial value of the approach in construction engineering and management.
Research limitations/implications
The current study highlights a notable gap in the existing literature, addressing the challenges in onsite overhead cost estimation and offering a solution that incorporates the state-of-the-art techniques.
Practical implications
The proposed method has significant implications for project managers and practitioners, enabling better-informed decisions based on precise cost data, ultimately leading to enhanced project outcomes.
Originality/value
This research uniquely combines ABC and BIM, presenting a pioneering solution for the accurate estimation and management of COCs in construction projects, adding significant value to the current body of knowledge in this field.
Details
Keywords
Ahmad Shah Kakar, Abid Hasan, Kumar Neeraj Jha and Amarjit Singh
The Afghan construction industry faces resource shortages and heavily relies on foreign aid to fund public projects on the path to recovery and reconstruction. While the resource…
Abstract
Purpose
The Afghan construction industry faces resource shortages and heavily relies on foreign aid to fund public projects on the path to recovery and reconstruction. While the resource constraints demand cost-efficient delivery of construction projects, many Afghan public projects experience delays and cost overruns. This study aims to evaluate various attributes and factors influencing cost performance in public construction projects in Afghanistan.
Design/methodology/approach
The literature review and Delphi method identified 30 cost performance attributes relevant to the context of Afghanistan. Next, a questionnaire survey was conducted with construction management professionals working in the public sector in the Afghan construction industry to evaluate these attributes.
Findings
This study found that the lack of resources, poor project management skills and corruption in procurement are the leading causes behind cost overruns in Afghan public projects. This study also identified five latent factors influencing cost performance in public projects in Afghanistan: competency of the project team, socioeconomic and political support, governance and public procurement, planning and risk management and project characteristics.
Research limitations/implications
The exploratory factor analysis did not reveal the relative significance of different cost performance success factors. Moreover, the ranking of cost performance attributes is based on the responses from the public sector construction professionals only.
Practical implications
The construction industry in Afghanistan significantly contributes to the country’s social and economic growth and employment. This study’s findings will help researchers, project sponsors, government departments and industry practitioners interested in improving the cost performance in Afghan public projects.
Originality/value
Given the scarcity of research in war-affected and conflict-sensitive regions, this study fills a research gap on project cost performance by providing insights into the cost performance success factors in public projects in Afghanistan.
Details
Keywords
Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva
Site supervision features largely influence the productivity status of construction operational processes. This study aims to use a case study containing mixed methods to test the…
Abstract
Purpose
Site supervision features largely influence the productivity status of construction operational processes. This study aims to use a case study containing mixed methods to test the site supervisory traits in applying mathematical theories to construction operations for directing supervisory capabilities under various operational characteristics.
Design/methodology/approach
A total of 62 construction site supervisors were trained as part of a new apprenticeship programme. Through literature reviews and expert consultations, grading criteria were designed with various degrees of descriptions and score ratings. The supervisory attributes were evaluated under seven competency element characteristics mapped with the relevant learning domains.
Findings
The results demonstrate a detailed sectional view of performance ratings of supervisors under different characteristics of competency factors with the validity, reliability, applicability and generalisability assurance of the research findings using relevant statistical tests and expert evaluations.
Research limitations/implications
Though the research applications were engaged directly with the construction industry in the Sri Lankan setting, other developing countries and emerging industries can also employ equivalent tactics to attain similar outcomes in their industry-based operations.
Originality/value
The research findings have led to producing a new guide that makes significant impacts on deciding the capability levels in construction supervisory attributes while executing problem-solving applications in construction planning and operational processes. Accordingly, the findings push to open a gate to intake advanced cognitive attributes towards addressing the industry's knowledge gap on how the problem-solving-based apprenticeship protocols need to be linked with the supervision features.
Details
Keywords
Chukwuka Christian Ohueri, San Chuin Liew, Jibril Adewale Bamgbade and Wallace Imoudu Enegbuma
The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to…
Abstract
Purpose
The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to significantly enhance multidiscipline team collaboration. However, the practical execution of green BIM is characterized by issues such as duplication of work, information silos and poor cross-party coordination. Besides, there are limited studies on the specific components that are critical to driving green BIM collaborative design. This study aims to establish the critical components of green BIM collaborative design to enable the multidiscipline team to effectively use diverse software to collaboratively exchange accurate information, thus ensuring informed decision-making in the sustainable building design process.
Design/methodology/approach
Data were obtained by using a questionnaire to survey 360 respondents comprising mainly architects and engineers (civil, mechanical and electrical) in Malaysia. Subsequently, data were analyzed via confirmatory factor analysis. Afterward, a measurement model was established and used to test the 11 hypotheses of this study.
Findings
A covariance-based structural equation model of the critical components for successful BIM-based sustainable building design collaboration was established.
Practical implications
The research findings will guide the multidisciplinary team to collaboratively exchange accurate information in green BIM practices.
Originality/value
To the best of the authors’ knowledge, this research is the first attempt in the literature to provide a pragmatic approach for practitioners to combine the established critical components of green BIM to collaboratively exchange heterogeneous sustainability criteria and efficiently design buildings with high sustainability performance, particularly in emerging countries like Malaysia.
Details
Keywords
Prince Boateng, Temitope Omotayo, Temidayo Osunsanmi and Damilola Ekundayo
The inherent risks and their interactive impacts in megaproject development have been found in numerous cases worldwide. Although risk management standards have been recommended…
Abstract
Purpose
The inherent risks and their interactive impacts in megaproject development have been found in numerous cases worldwide. Although risk management standards have been recommended for the best practice in engineering construction projects, there is still a lack of systematic approaches to describing the interactions. Interactions such as social, technical, economic, ecological and political (STEEP) risks have complex and dynamic implications for megaproject construction. For a better understanding and effective management of megaprojects such as the Edinburgh Tram project, the dynamic interaction of concomitant risks must be studied.
Design/methodology/approach
A systems dynamic methodology was adopted following the comprehensive literature review. Documentary data were gathered from the case study on Tram Network Project in Edinburgh.
Findings
A casual loop of typical evolution of key indicators of risks was then developed. A hypothesised model of social and ecological (SE) risks was derived using the system dynamics (SD) modelling technique. The model was set up following British Standards on risk management to provide a generic tool for risk management in megaproject development. The study reveals that cost and time overruns at the developmental stage of the case project are caused mainly by the effects of interactions of risk factors from the external macro project environment on a timely basis.
Originality/value
This article presented a model for simulating the socio-ecological risk confronting the management and construction of megaprojects. The use of SD provided the opportunity to explain the nature of all risks, particularly the SE risks in the past stages of project development.
Details
Keywords
Zhe Li, Xinrui Liu and Bo Wang
Accounting scandals and earnings management problems at large firms such as Global Crossing and Enron have resulted in lots of wealth loss not only to corporate investors but also…
Abstract
Purpose
Accounting scandals and earnings management problems at large firms such as Global Crossing and Enron have resulted in lots of wealth loss not only to corporate investors but also led tremendous damage to societies. Hence, policymakers and academic researchers have started to explore mechanisms to prevent improprieties in financial reporting and further enhance firm value. Using data from United States (US)-listed companies between 2000 and 2018, this article explores the effect of ex-military executives on earnings quality, the role of financial analysts in their interplay and the firm value implication of earnings quality driven by ex-military executives.
Design/methodology/approach
This study employs a firm fixed-effects model to validate the main conjecture and adopts the weighted least squares, Granger causality analysis, instrumental variable approach, propensity score matching, entropy balancing approach and dynamic system Generalized Method of Moments (GMM) estimator to address robustness and endogeneity issues.
Findings
Authors reveal that companies run by ex-military senior executives exhibit lower levels of accruals-based and real earnings management than those without. The effect of management military leadership on constraining earnings management is more prominent for companies with low analyst coverage, suggesting that the military experience of executives could be a substitute for external monitoring. Authors also find that these ethical managers alleviate the negative impact of earnings management on firm value and that companies managed by these managers exhibit higher firm performance.
Practical implications
This study highlights the importance of the intrinsic motivation behind the effect of military experience on senior managers' personalities and offers essential stakeholder-related implications regarding the effect of military experience. The military experience of senior managers helps facilitate the attainment of broader corporate governance and economic objectives.
Originality/value
This article adds new insights to the literature on the role of managerial military experience in decision-making processes, financial reporting outcomes and firm performance by employing the upper echelons and imprinting theoretical perspectives.
Details
Keywords
Anthony Bagherian, Mark Gershon and Sunil Kumar
Numerous attempts at installing six sigma (SS) have faced challenges and fallen short of the desired success. Thus, it becomes vital to identify the critical factors and…
Abstract
Purpose
Numerous attempts at installing six sigma (SS) have faced challenges and fallen short of the desired success. Thus, it becomes vital to identify the critical factors and characteristics that play a pivotal role in achieving successful adoption. In this study the research has aimed to highlight that a considerable number of corporate SS initiatives, around 60%, fail primarily due to the improper incorporation of essential elements and flawed assumptions.
Design/methodology/approach
To validate the influence of critical success factors (CSFs) on SS accomplishment, the study employed a research design combining exploratory and mixed-methods approaches. A Likert-scale questionnaire was utilized, and a simple random sampling method was employed to gather data. Out of the 2,325 potential participants approached, 573 responses were received, primarily from Germany, the United Kingdom and Sweden. The analysis focused on 260 completed questionnaires and statistical methods including structural equation modeling (SEM), exploratory factor analysis (EFA) and Confirmatory Factor Analysis (CFA) were utilized for data analysis.
Findings
The study acknowledged four essential components of CSFs that are imperative for sustaining the success of SS: (1) Competence of belt System employees; (2) Project management skills; (3) Organizational economic capability and (4) Leadership commitment and engagement. These factors were identified as significant contributors to the maintenance of SS’s success.
Practical implications
The practical implications of this research imply that institutions, practitioners, and researchers can utilize the four identified factors to foster the sustainable deployment of SS initiatives. By incorporating these factors, organizations can enhance the effectiveness and longevity of their SS practices.
Originality/value
The investigation's originality lies in its contribution to assessing CSFs in SS deployment within the European automobile industry, utilizing a mixed-methods research design supplemented by descriptive statistics.
Details