Search results
1 – 6 of 6Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David J. Edwards and Eric Asamoah
Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide…
Abstract
Purpose
Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide decision-making on risk allocation in PPP power projects in Ghana.
Design/methodology/approach
A total of 67 risk factors and 9 risk allocation criteria were established from literature and ranked in a two-round Delphi survey using questionnaires. The fuzzy synthetic evaluation method was used in developing the risk allocation model.
Findings
The model’s output variable is the risk allocation proportions between the public body and private body based on their capability to manage the risk factors. Out of the 37 critical risk factors, the public sector was allocated 12 risk factors with proportions = 50%, while the private sector was allocated 25 risk factors with proportions = 50%.
Originality/value
To the best of the authors’ knowledge, this research presents the first attempt in Ghana at endeavouring to develop a QRAM for PPP power projects. There is confidence in the model to efficiently allocate risks emanating from PPP power projects.
Details
Keywords
Matthew Osivue Ikuabe, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Donald Chiyangwa and Ayodeji Emmanuel Oke
Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to…
Abstract
Purpose
Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to failure in most developing countries. Therefore, this study seeks to unravel the critical factors influencing the failure of JVs in the South African construction industry.
Design/methodology/approach
A quantitative approach was adopted for the study using a well-structured questionnaire as the instrument for data collection. Respondents for the study were built environment professionals in Gauteng province in South Africa. Data elicited from respondents were analyzed using a four-pronged process which included descriptive statistics, one sample t-test, exploratory factor analysis and confirmatory factor analysis.
Findings
Resulting from the analysis conducted, four critical components emerged as the major factors influencing the failure of JVs in the South African construction industry, which are inefficient financial framework, divergent organizational culture, poor project governance and inadequacies from project stakeholders.
Practical implications
The outcome of this study presents a roadmap for stakeholders in the construction industry with the requisite knowledge of the critical factors leading to the failure of JVs, consequently providing a clear path for the successful delivery of JV mandates.
Originality/value
Evidence from literature suggests that several studies have been conducted on the various aspects of JVs in the South African construction industry; however, none has focused on the leading factors attributed to the failure of JVs. Also, the findings of this study cultivate a good theoretical platform for future studies on JVs.
Details
Keywords
Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…
Abstract
Purpose
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.
Design/methodology/approach
The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).
Findings
Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.
Practical implications
The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.
Originality/value
There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.
Details
Keywords
Lee Felix Anzagira, Daniel Duah, Edward Badu, Eric Kwame Simpeh and Alexander B. Marful
The purpose of this paper is to ascertain the significant stimulating measures/enablers relating to the existing building regulations for promoting the adoption and overcoming the…
Abstract
Purpose
The purpose of this paper is to ascertain the significant stimulating measures/enablers relating to the existing building regulations for promoting the adoption and overcoming the barriers to the uptake and implementation of the green building concept (GBC) in developing countries using Ghana as a case.
Design/methodology/approach
The quantitative research approach was used to attain the study’s goal. Purposive and snowball sampling techniques were found to be suitable for collecting data from 292 relevant stakeholders in Ghana’s construction industry. The mean score ranking technique, in conjunction with the relative importance index, was used to establish the relative ranking of, among other things, the stimulus measures for increasing green building uptake in Ghana. An exploratory factor analysis was also used to classify the most significant stimulation strategies for improving green building uptake.
Findings
“Educational programmes relevant to GBTs for developers, contractors, and policymakers,” “sufficient information on the cost and benefits of GBTs” and “mandated green building codes and regulations” were the top three listed stimulating measures to promote increasing use of green building technologies (GBTs). The enablers were classified as follows: government regulations and policies; commitment and GB research; education and publicity; and incentives and support.
Research limitations/implications
The study was conducted in Ghana, a developing nation, and thus the findings and implications are peculiar to Ghana. However, the study’s findings have important practical implications for the adoption and marketing of GBCs and GBTs in other developing nations.
Originality/value
Prioritizing major stimulation initiatives may be beneficial in terms of overcoming the constraints to the adoption of GBCs and GBTs in developing countries.
Details
Keywords
Daniel Bernardo Ribeiro, Aparecido dos Reis Coutinho, Walter Cardoso Satyro, Fernando Celso de Campos, Carlos Roberto Camello Lima, José Celso Contador and Rodrigo Franco Gonçalves
Construction industry (CI) has great prominence for the world economy, and it is expected that, with the use of the innovative technologies and approaches of Industry 4.0 (I4.0)…
Abstract
Purpose
Construction industry (CI) has great prominence for the world economy, and it is expected that, with the use of the innovative technologies and approaches of Industry 4.0 (I4.0), the new industrial paradigm, construction can reach higher levels of productivity. This study aims to develop a model (readiness model) to assess the level of use of I4.0 technologies by the construction sector in Brazil and its most relevant applications.
Design/methodology/approach
The methodology used was bibliographic research, design-science research and a survey to validate the model, carried out with 162 companies, considered among the main ones in the sector in Brazil. The literature review revealed 13 technologies of I4.0 applied to construction; hence, the views of industry experts were based on these technologies.
Findings
The Digital Advancement Within CoNstruction (DAWN) readiness model was proposed, showing that among the 13 evaluated technologies of I4.0 and their applications, the Brazilian construction companies had a low level of utilization; both high and middle-income companies presented this low level of use; some technologies with a greater number of scientific publications were less used in practice in the Brazilian construction.
Originality/value
The originality and theoretical contribution are to present a readiness model to assess the level of use of I4.0 technologies and their most relevant applications in the CI in countries with an economy similar to Brazil’s, making it possible to measure the level of adoption of these technologies.
Details
Keywords
Andrew Ebekozien, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan
Though alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still…
Abstract
Purpose
Though alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still overwhelmed with encumbrances. The encumbrances that hinder ABT adoption require an in-depth study, especially in developing countries like Nigeria. However, studies regarding ABT and its role in improving Nigeria's LCH to achieve Sustainable Development Goal (SDG) 11 are scarce. This research investigates encumbrances to ABT adoption in Nigeria's LCH provision and suggests feasible measures to prevent or reduce the encumbrances, thereby improving achieving SDG 11 (sustainable cities and communities).
Design/methodology/approach
This research utilised qualitative research and adopted a face-to-face interview as the primary data collection. The interviewees comprised ABT practitioners and end users in Nigeria who were chosen by a convenient sampling technique. The study's data were analysed manually through a thematic approach.
Findings
This study shows that stakeholders should embrace ABT in LCH provision to improve achieving SDG 11 in Nigeria. Also, it clustered the perceived 20 encumbrances to ABT adoption in LCH provision into government/policymaker, housing developers/building contractors, ABT users and ABT manufacturers-related issues in Nigeria's context. This study suggested mechanisms to mitigate encumbrances to ABT adoption in LCH provision, thereby improving achieving SDG 11.
Originality/value
This research adds to the limited literature by analysing ABT adoption encumbrances in Nigeria's LCH provision, which could assist policy formulation for the uptake of ABT in LCH provision and improve achieving Goal 11.
Details