Open Access
Article
Publication date: 11 July 2023

Margherita Lisco and Radhlinah Aulin

The reuse of timber building parts, when designing new buildings, has become a topic of increasing discussion as a proposed circular solution in support of sustainable development…

Abstract

Purpose

The reuse of timber building parts, when designing new buildings, has become a topic of increasing discussion as a proposed circular solution in support of sustainable development goals. Designers face the difficulty of identifying and applying different design strategies for reuse due to multiple definitions, which are used interchangeably. The purpose of this study is to propose a taxonomy to define the relationships between various concepts and practices that comprise the relevant strategies for reuse, notably design for disassembly (DfD) and design for adaptability (DfA).

Design/methodology/approach

Literature reviews were conducted based on research publications over the previous 12 years and located through the Web of Science and Scopus.

Findings

A taxonomy for the design process grounded on two strategies for reuse is presented: DfD and DfA. Based on previous work, the taxonomy aims to build a vocabulary of definitions in DfD and DfA to support other researchers and practitioners working in the field.

Research limitations/implications

The research is limited to the design phase of timber-based buildings. It does not take into account the other phases of the construction process, neither other kind of construction methods.

Practical implications

The application of the taxonomy can facilitate communication between different actors and provide a way for building product manufacturers to demonstrate their reuse credentials, enabling them to produce and promote compliant products and thereby support design for reuse strategies.

Social implications

This paper could contribute to a closer collaboration of all stakeholders involved in the building process since the very early phases of the conceptual design.

Originality/value

This paper contributes a comprehensive taxonomy to support the deployment of circular reuse strategies and assist designers and other stakeholders from the earliest of phases in the building’s life cycle. The proposed definition framework provided by the taxonomy resolves the longstanding lack of a supporting vocabulary for reuse and can be used as a reference for researchers and practitioners working with the DfD and DfA.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 13 September 2022

Oliver Disney, Mattias Roupé, Mikael Johansson and Alessio Domenico Leto

Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design…

4362

Abstract

Purpose

Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM.

Design/methodology/approach

Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation.

Findings

The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership.

Originality/value

A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 30 August 2022

Petteri Annunen, Juho Tella, Sini Pekki and Harri Haapasalo

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the…

1883

Abstract

Purpose

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the elements for creating the maintenance capability and the process to be used in construction life cycle projects for buildings.

Design/methodology/approach

An inductive and qualitative research method was used to construct the proposed process based on the literature and 18 interviews in two large construction companies.

Findings

The results indicate that the maintenance phase is usually overlooked during the design and construction phases, and capabilities are not systematically built. In particular, processes are lacking in data management, causing severe problems in maintenance.

Originality/value

This study presents a process including key requirements and activities for creating maintenance capability in conjunction with the design and construction phases, which is novel to the literature. The validated process can be adapted based on the needs of the construction company.

Details

Journal of Facilities Management , vol. 22 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 30 April 2021

Sepehr Alizadehsalehi and Ibrahim Yitmen

The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality…

9063

Abstract

Purpose

The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality (RC-to-XR).

Design/methodology/approach

IDEF0 data modeling method has been designed to establish an integration of reality capturing technologies by using BIM, DTs and XR for automated construction progress monitoring. Structural equation modeling (SEM) method has been used to test the proposed hypotheses and develop the skill model to examine the reliability, validity and contribution of the framework to understand the DRX model's effectiveness if implemented in real practice.

Findings

The research findings validate the positive impact and importance of utilizing technology integration in a logical framework such as DRX, which provides trustable, real-time, transparent and digital construction progress monitoring.

Practical implications

DRX system captures accurate, real-time and comprehensive data at construction stage, analyses data and information precisely and quickly, visualizes information and reports in a real scale environment, facilitates information flows and communication, learns from itself, historical data and accessible online data to predict future actions, provides semantic and digitalize construction information with analytical capabilities and optimizes decision-making process.

Originality/value

The research presents a framework of an automated construction progress monitoring system that integrates BIM, various reality capturing technologies, DT and XR technologies (VR, AR and MR), arraying the steps on how these technologies work collaboratively to create, capture, generate, analyze, manage and visualize construction progress data, information and reports.

Details

Smart and Sustainable Built Environment, vol. 12 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 25 April 2022

Adetayo Olugbenga Onososen and Innocent Musonda

Rapid urbanisation and recent shock events have reiterated the need for resilient infrastructure, as seen in the pandemic. Yet, knowledge gaps in construction robotics and…

3913

Abstract

Purpose

Rapid urbanisation and recent shock events have reiterated the need for resilient infrastructure, as seen in the pandemic. Yet, knowledge gaps in construction robotics and human–robot teams (HRTs) research limit maximising these emerging technologies’ potentials. This paper aims to review the state of the art of research in this area to identify future research directions in HRTs able to aid the resilience and responsiveness of the architecture, engineering and construction (AEC) sector.

Design/methodology/approach

A total of 71 peer-reviewed journal articles centred on robotics and HRTs were reviewed through a quantitative approach using scientometric techniques using Gephi and VOSviewer. Research focus deductions were made through bibliometric analysis and co-occurrence analysis of reviewed publications.

Findings

This study revealed sparse and small research output in this area, indicating immense research potential. Existing clusters signifying the need for further studies are on automation in construction, human–robot teaming, safety in robotics and robotic designs. Key publication outlets and construction robotics contribution towards the built environment’s resilience are discussed.

Practical implications

The identified gaps in the thematic areas illustrate priorities for future research focus. It raises awareness on human factors in collaborative robots and potential design needs for construction resilience.

Originality/value

Rapid urbanisation and recent shock events have reiterated the need for resilient infrastructure, as seen in the pandemic. Yet, knowledge gaps in construction robotics and HRTs research limit maximising these emerging technologies’ potentials. This paper aims to review the state of the art of research in this area to identify future research directions in HRTs able to aid the resilience and responsiveness of the AEC sector.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 2 March 2022

Mergen Kor, Ibrahim Yitmen and Sepehr Alizadehsalehi

The purpose of this paper is to investigate the potential integration of deep learning (DL) and digital twins (DT), referred to as (DDT), to facilitate Construction 4.0 through an…

7148

Abstract

Purpose

The purpose of this paper is to investigate the potential integration of deep learning (DL) and digital twins (DT), referred to as (DDT), to facilitate Construction 4.0 through an exploratory analysis.

Design/methodology/approach

A mixed approach involving qualitative and quantitative analysis was applied to collect data from global industry experts via interviews, focus groups and a questionnaire survey, with an emphasis on the practicality and interoperability of DDT with decision-support capabilities for process optimization.

Findings

Based on the analysis of results, a conceptual model of the framework has been developed. The research findings validate that DL integrated DT model facilitating Construction 4.0 will incorporate cognitive abilities to detect complex and unpredictable actions and reasoning about dynamic process optimization strategies to support decision-making.

Practical implications

The DL integrated DT model will establish an interoperable functionality and develop typologies of models described for autonomous real-time interpretation and decision-making support of complex building systems development based on cognitive capabilities of DT.

Originality/value

The research explores how the technologies work collaboratively to integrate data from different environments in real-time through the interplay of the optimization and simulation during planning and construction. The framework model is a step for the next level of DT involving process automation and control towards Construction 4.0 to be implemented for different phases of the project lifecycle (design–planning–construction).

Details

Smart and Sustainable Built Environment, vol. 12 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2117

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 19 April 2023

Robin de Graaf, Rens Pater and Hans Voordijk

In the construction industry, an under researched area of study is how main contractor (MC) sub-contract design responsibilities to sub-contractor (SC). This lack of knowledge is…

Abstract

Purpose

In the construction industry, an under researched area of study is how main contractor (MC) sub-contract design responsibilities to sub-contractor (SC). This lack of knowledge is particularly serious in the context of delivery methods such as design and construct where design responsibilities are pushed down the supply chain. In this study, it is aimed to explore which level of design responsibility MCs sub-contract to SCs, for what reasons, and what the impact of sub-contracting decisions is on projects.

Design/methodology/approach

A qualitative in-depth multiple case study was conducted. Six sub-contracting cases were examined in two civil engineering projects. In each project, the MCs sub-contracted pre-fabricated beams, reinforcement and railing to SCs. Data collection included document analysis and interviews. A within-case and cross-case analysis was conducted to examine emerging empirical patterns. These patterns were used to elaborate theory and develop propositions.

Findings

MCs sub-contracted design responsibilities to SCs as suggested by literature. However, despite that sub-contracting was in keeping with literature, several problems were reported in the cases where MCs involved SCs no earlier than in the construction stage. This is not to be expected according to theory.

Originality/value

This study adds value to the sub-contracting field as it provides new insights in relationships between the level of design responsibilities sub-contracted and the impact of that on projects. The study also revealed new factors such as building information modelling (BIM) interoperability that should get more attention in sub-contracting.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 3
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 25 September 2018

Ruwini Edirisinghe

The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of…

23488

Abstract

Purpose

The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of the future smart construction site.

Design/methodology/approach

The paper provides a systematic and hierarchical classification of 114 articles from both industry and academia on the digital skin concept and evaluates them. The hierarchical classification is based on application areas relevant to construction, such as augmented reality, building information model-based visualisation, labour tracking, supply chain tracking, safety management, mobile equipment tracking and schedule and progress monitoring. Evaluations of the research papers were conducted based on three pillars: validation of technological feasibility, onsite application and user acceptance testing.

Findings

Technologies learned about in the literature review enabled the envisaging of the pervasive construction site of the future. The paper presents scenarios for the future context-aware construction site, including the construction worker, construction procurement management and future real-time safety management systems.

Originality/value

Based on the gaps identified by the review in the body of knowledge and on a broader analysis of technology diffusion, the paper highlights the research challenges to be overcome in the advent of digital skin. The paper recommends that researchers follow a coherent process for smart technology design, development and implementation in order to achieve this vision for the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 17 May 2022

Douglas Aghimien, Clinton Aigbavboa, Ayodeji Emmanuel Oke and John Aliu

Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the…

1563

Abstract

Purpose

Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the right people to drive the implementation of these technologies and attaining strategic organisational goals is essential. While most studies have focused on the use of emerging technologies in the construction industry, less attention has been given to the ‘people’ dimension. Therefore, this study aims to assess the people-related features needed for construction digitalisation.

Design/methodology/approach

The study adopted pragmatic thinking using a mixed-method approach. A Delphi was used to achieve the qualitative aspect of the research, while a questionnaire survey conducted among 222 construction professionals was used to achieve the quantitative aspect. The data gathered were analysed using frequency, percentage, mean item score, Kruskal–Wallis H test, exploratory factor analysis and confirmatory factor analysis.

Findings

Based on acceptable reliability, validity and model fit indices, the study found that the people-related factors needed for construction digitalisation can be grouped into technical capability of personnel, attracting and retaining digital talent and organisation’s digital culture.

Practical implications

The findings offer valuable benefits to construction organisations as understanding these identified people features can help lead to better deployment of digital tools and the attainment of the digital transformation.

Originality/value

This study attempts to fill the gap in the shortage of literature exploring the people dimension of construction digitalisation. The study offers an excellent theoretical backdrop for future works on digital talent for construction digitalisation, which has gained less attention in the current construction digitalisation discourse.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Access

Only Open Access