Search results

1 – 10 of over 10000
Open Access
Article
Publication date: 29 April 2021

Anthony Macari and Grace Chun Guo

This conceptual paper focuses on a common observation in the implementation stage of reward-based crowdfunding (RBC) – entrepreneurs' failures and delays in delivery of rewards to…

1136

Abstract

Purpose

This conceptual paper focuses on a common observation in the implementation stage of reward-based crowdfunding (RBC) – entrepreneurs' failures and delays in delivery of rewards to investors, which, in turn, may be perceived as violations of reward delivery obligations.

Design/methodology/approach

Drawing on entrepreneurial personality theory and psychological contract theory, this paper develops propositions and identifies factors related to both entrepreneurs (overconfidence and narcissism) and factors related to investors (types of motivators and psychological contracts) that may explain the perceived violations of reward delivery obligations. Implications for theory and practice are also discussed.

Findings

The theoretical analysis, by wielding two independently developed literatures, has demonstrated that it is important to investigate factors that are related to both investors and entrepreneurs in understanding issues and challenges at different stages of the RBC model. The authors believe that the current analysis provides an integrated understanding and a solid foundation for researchers to further examine these issues by empirically testing these propositions.

Originality/value

The authors examined two previously understudied psychological factors in the context of RBC – entrepreneurial traits, mainly overconfidence and narcissism, and the type of psychological contracts formed between investors and entrepreneurs, both of which, according to McKenny et al. (2017), need greater attention from researchers studying crowdfunding.

Open Access
Article
Publication date: 13 October 2023

Roland Hellberg

A deteriorating security situation and an increased need for defence equipment calls for new forms of collaboration between Armed Forces and the defence industry. This paper aims…

1175

Abstract

Purpose

A deteriorating security situation and an increased need for defence equipment calls for new forms of collaboration between Armed Forces and the defence industry. This paper aims to investigate the ways in which the accelerating demand for increased security of supply of equipment and supplies to the Armed Forces requires adaptability in the procurement process that is governed by laws on public procurement (PP).

Design/methodology/approach

This paper is based on a review of current literature as well as empirical data obtained through interviews with representatives from the Swedish Defence Materiel Administration and the Swedish defence industry.

Findings

Collaboration with the globalized defence industry requires new approaches, where the PP rules make procurement of a safe supply of defence equipment difficult.

Research limitations/implications

The study's empirical data and findings are based on the Swedish context. In order to draw more general conclusions in a defence context, the study should be expanded to cover more nations.

Practical implications

The findings will enable the defence industry and the procurement authorizations to better understand the requirements of Armed Forces, and how to cooperate under applicable legal and regulatory requirements.

Originality/value

The paper extends the extant body of academic knowledge of the security of supply into the defence sector. It serves as a first step towards articulating a call for new approaches to collaboration in defence supply chains.

Details

Journal of Defense Analytics and Logistics, vol. 7 no. 2
Type: Research Article
ISSN: 2399-6439

Keywords

Content available
Article
Publication date: 22 November 2022

Dave C. Longhorn, Shelby V. Baybordi, Joel T. Van Dyke, Austin W. Winter and Christopher L. Jakes

This study aims to examine ship loading strategies during large-scale military deployments. Ships are usually loaded to a stowage goal of about 65% of the ship's capacity. The…

Abstract

Purpose

This study aims to examine ship loading strategies during large-scale military deployments. Ships are usually loaded to a stowage goal of about 65% of the ship's capacity. The authors identify how much cargo to load onto ships for each sailing and propose lower stowage goals that could improve the delivery of forces during the deployment.

Design/methodology/approach

The authors construct several mixed integer programs to identify optimal ship loading strategies that minimize delivery timelines for notional, but realistic, problem variables. The authors study the relative importance of these variables using experimental designs, regressions, correlations and chi-square tests of the empirical results.

Findings

The research specifies the conditions during which ships should be light loaded, i.e. loaded to less than 65% of total capacity. Empirical results show cargo delivered up to 16% faster with a light-loaded strategy compared to fully loaded ships.

Research limitations/implications

This work assumes deterministic sailing times and ship loading times. Also, all timing aspects of the problem are estimated to the nearest natural number of days.

Practical implications

This research provides important new insights about optimal ship loading strategies, which were not previously quantified. More importantly, logistics planners could use these insights to reduce sealift delivery timelines during military deployments.

Originality/value

Most ship routing and scheduling problems minimize costs as the primary goal. This research identifies the situations in which ships transporting military forces should be light loaded, thereby trading efficiency for effectiveness, to enable faster overall delivery of unit equipment to theater seaports.

Details

Journal of Defense Analytics and Logistics, vol. 6 no. 2
Type: Research Article
ISSN: 2399-6439

Keywords

Content available
Article
Publication date: 7 June 2022

Mary Ashley Stanton, Jason Anderson, John M. Dickens and Lance Champagne

The purpose of this research is to explore the utility of autonomous transport across two independent airframe maintenance operations at a single location.

Abstract

Purpose

The purpose of this research is to explore the utility of autonomous transport across two independent airframe maintenance operations at a single location.

Design/methodology/approach

This study leveraged discrete event simulation that encompassed real-world conditions on a United States Air Force flight line. Though the Theory of Constraints (TOC) lens, a high-demand, human-controlled delivery asset is analyzed and the impact of introducing an autonomous rover delivery vehicle is assessed. The authors’ simulations explored varying numbers and networks of rovers as alternative sources of delivery and evaluated these resources’ impact against current flight line operations.

Findings

This research indicates that the addition of five autonomous rovers can significantly reduce daily expediter delivery tasks, which results in additional expertise necessary to manage and execute flight line operations. The authors assert that this relief would translate into enhancements in aircraft mission capable rates, which could increase overall transport capacity and cascade into faster cargo delivery times, systemwide. By extension, the authors suggest overall inventory management could be improved through reduction in transportation shipping time variance, which enhances the Department of Defense’s overall supply chain resilience posture.

Originality/value

When compared against existing practices, this novel research provides insight into actual flight line movement and the potential benefits of an alternative autonomous delivery system. Additionally, the research measures the potential savings in the workforce and vehicle use that exceeds the cost of the rovers and their employment.

Details

Journal of Defense Analytics and Logistics, vol. 6 no. 1
Type: Research Article
ISSN: 2399-6439

Keywords

Content available
Article
Publication date: 26 June 2019

Dave C. Longhorn and Joshua R. Muckensturm

This paper aims to introduce a new mixed integer programming formulation and associated heuristic algorithm to solve the Military Nodal Capacity Problem, which is a type of supply…

1064

Abstract

Purpose

This paper aims to introduce a new mixed integer programming formulation and associated heuristic algorithm to solve the Military Nodal Capacity Problem, which is a type of supply chain network design problem that involves determining the amount of capacity expansion required at theater nodes to ensure the on-time delivery of military cargo.

Design/methodology/approach

Supply chain network design, mixed integer programs, heuristics and regression are used in this paper.

Findings

This work helps analysts at the United States Transportation Command identify what levels of throughput capacities, such as daily processing rates of trucks and railcars, are needed at theater distribution nodes to meet warfighter cargo delivery requirements.

Research limitations/implications

This research assumes all problem data are deterministic, and so it does not capture the variations in cargo requirements, transit times or asset payloads.

Practical implications

This work gives military analysts and decision makers prescriptive details about nodal capacities needed to meet demands. Prior to this work, insights for this type of problem were generated using multiple time-consuming simulations often involving trial-and-error to explore the trade space.

Originality/value

This work merges research of supply chain network design with military theater distribution problems to prescribe the optimal, or near-optimal, throughput capacities at theater nodes. The capacity levels must meet delivery requirements while adhering to constraints on the proportion of cargo transported by mode and the expected payloads for assets.

Details

Journal of Defense Analytics and Logistics, vol. 3 no. 2
Type: Research Article
ISSN: 2399-6439

Keywords

Open Access
Article
Publication date: 17 May 2024

Sina Moradi, Janne Hirvonen and Piia Sormunen

The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built…

Abstract

Purpose

The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built environment. Although there have been a few studies addressing this issue, studying this topic with a special focus on the project delivery process has been almost overlooked. Hence, this study aims to address the EPG in building construction through the lens of collaborative and life cycle-based project delivery.

Design/methodology/approach

In order to realize the objective of this study, the development of a theoretical framework based on the literature review was followed by a qualitative study in which 21 semi-structured interviews were conducted with Finnish project professionals representing clients, design/planning experts, constructors and building operation/maintenance experts to explore their views on the topic under study.

Findings

The findings reveal the project delivery-related causes of EPG in building construction. Moreover, the obtained results present a collaborative and life cycle-based delivery model that integrates project and product (i.e. building) life cycles, and it is compatible with all types of contractual frameworks in building construction projects.

Research limitations/implications

Although the findings of this study significantly contribute to theory and practice in the field of collaborative and sustainable construction project delivery, it is acknowledged that these findings are based on Finnish professionals’ input, and expanding this research to other regions is a potential area for further studies. Moreover, the developed model, although validated in Finland, needs to be tested in a broader context as well to gain wider generalizability.

Originality/value

The obtained results reveal the significance and impact of collaborative and life cycle-based project development and delivery on the realization of environmentally sustainable building construction.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 9 April 2024

Ahmed Shafiqul Huque and Jannatul Ferdous

The paper aims to examine the state of electronic service delivery in Bangladesh. It reviews the structure and operation of the “e-service” centers at the district, sub-district…

Abstract

Purpose

The paper aims to examine the state of electronic service delivery in Bangladesh. It reviews the structure and operation of the “e-service” centers at the district, sub-district (upazila), and union levels by taking an inventory and assessing their contributions.

Design/methodology/approach

The paper is based on a review of the functions and operations of the service delivery agencies with reference to the claims made by the government. It is based on secondary materials obtained from academic studies, government documents, relevant websites, and media reports.

Findings

Electronic delivery of public services in Bangladesh has not been effective as planned. There are issues regarding channels of communication, the competence of public officials, human and financial resources, and political will to support the agencies delivering public services.

Originality/value

The paper examines the arrangements, practices, and problems of delivery of public services in Bangladesh through e-service centers at the local levels to determine the progress and potentials of employing digital technology for addressing problems. It proposes the strategy for public service delivery by using digital technology in the country.

Details

Public Administration and Policy, vol. 27 no. 1
Type: Research Article
ISSN: 1727-2645

Keywords

Content available
Article
Publication date: 22 April 2022

Vincent McLean and Adam D. Reiman

Aircraft fail to meet mission capable rate goals due to a lack of supply of aircraft parts in inventory where the aircraft breaks. This triggers an order at the repair location…

Abstract

Purpose

Aircraft fail to meet mission capable rate goals due to a lack of supply of aircraft parts in inventory where the aircraft breaks. This triggers an order at the repair location. To maximize mission capable rate, the time from order to delivery needs to be minimized. The purpose of this research is to examine the case of three airfields for the order to delivery time of mission critical aircraft parts for a specific aircraft type.

Design/methodology/approach

This research captured data from three information systems to assess the order fulfillment process. The data were analyzed to determine the performance in fiscal year 2020. Using the model of that performance, the cost of reducing transportation times using publicly available commercial cost estimates was assessed against the impact on aircraft availability.

Findings

The results indicate that paying the costs for expedited shipping would have increased aircraft availability by 1.09 times the average annual aircraft flying hours for the three cases. The cost for the equivalent of an additional aircraft for the year was a third of the annual straight-line depreciation for that aircraft type.

Research limitations/implications

This research assumed that the transportation time service levels publicly posted could be achieved. The weight of each mission critical part was not available, so the weight was selected from a probability distribution of mission critical part weights that was retrieved from prior research. This research provides options to enhance aircraft availability and identifies the associated costs.

Practical implications

Adjusting the contract with transportation providers to reduce the transportation times of mission critical parts could have a large impact on aircraft availability at relatively little cost.

Social implications

This research could enhance aircraft readiness in service of the common defense.

Originality/value

This research provides an effective methodology for enhancing military readiness through contract adjustments with commercial partners. The value of this research is that it will serve to adjust the value proposition of mission critical parts inside the United States Transportation Command’s Next Generation Delivery Service contract.

Details

Journal of Defense Analytics and Logistics, vol. 6 no. 1
Type: Research Article
ISSN: 2399-6439

Keywords

Content available
Article
Publication date: 14 March 2024

Marcel Peppel, Stefan Spinler and Matthias Winkenbach

The e-commerce boom presents new challenges for last-mile delivery (LMD), which may be mitigated by new delivery technologies. This paper evaluates the impact of mobile parcel…

Abstract

Purpose

The e-commerce boom presents new challenges for last-mile delivery (LMD), which may be mitigated by new delivery technologies. This paper evaluates the impact of mobile parcel lockers (MPL) on costs and CO2 equivalent (CO2e) emissions in existing LMD networks, which include home delivery and shipments to stationary parcel lockers.

Design/methodology/approach

To describe customers’ preferences, we design a multinomial logit model based on recipients’ travel distance to pick-up locations and availability at home. Based on route cost estimation, we define the operating costs for MPLs. We devise a mathematical model with binary decision variables to optimize the location of MPLs.

Findings

Our study demonstrates that integrating MPLs leads to additional cost savings of 8.7% and extra CO2e emissions savings of up to 5.4%. Our analysis of several regional clusters suggests that MPLs yield benefits in highly populous cities but may result in additional emissions in more rural areas where recipients drive longer distances to pick-ups.

Originality/value

This paper designs a suitable operating model for MPLs and demonstrates environmental and economic savings. Moreover, it adds recipients’ availability at home to receive parcels improving the accuracy of stochastic demand. In addition, MPLs are evaluated in the context of several regional clusters ranging from large cities to rural areas. Thus, we provide managerial guidance to logistics service providers how and where to deploy MPLs.

Details

International Journal of Physical Distribution & Logistics Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0960-0035

Keywords

Open Access
Article
Publication date: 14 March 2024

Zabih Ghelichi, Monica Gentili and Pitu Mirchandani

This paper aims to propose a simulation-based performance evaluation model for the drone-based delivery of aid items to disaster-affected areas. The objective of the model is to…

218

Abstract

Purpose

This paper aims to propose a simulation-based performance evaluation model for the drone-based delivery of aid items to disaster-affected areas. The objective of the model is to perform analytical studies, evaluate the performance of drone delivery systems for humanitarian logistics and can support the decision-making on the operational design of the system – on where to locate drone take-off points and on assignment and scheduling of delivery tasks to drones.

Design/methodology/approach

This simulation model captures the dynamics and variabilities of the drone-based delivery system, including demand rates, location of demand points, time-dependent parameters and possible failures of drones’ operations. An optimization model integrated with the simulation system can update the optimality of drones’ schedules and delivery assignments.

Findings

An extensive set of experiments was performed to evaluate alternative strategies to demonstrate the effectiveness for the proposed optimization/simulation system. In the first set of experiments, the authors use the simulation-based evaluation tool for a case study for Central Florida. The goal of this set of experiments is to show how the proposed system can be used for decision-making and decision-support. The second set of experiments presents a series of numerical studies for a set of randomly generated instances.

Originality/value

The goal is to develop a simulation system that can allow one to evaluate performance of drone-based delivery systems, accounting for the uncertainties through simulations of real-life drone delivery flights. The proposed simulation model captures the variations in different system parameters, including interval of updating the system after receiving new information, demand parameters: the demand rate and their spatial distribution (i.e. their locations), service time parameters: travel times, setup and loading times, payload drop-off times and repair times and drone energy level: battery’s energy is impacted and requires battery change/recharging while flying.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-6747

Keywords

1 – 10 of over 10000