Article
Publication date: 20 October 2021

Omid Amiri, Mahmoud Rahimi, Amir Ayazi and Garshasb Khazaeni

Nowadays, engineering, procurement and construction (EPC) contracts are being widely used to perform industrial and infrastructure projects because of several reasons like high…

Abstract

Purpose

Nowadays, engineering, procurement and construction (EPC) contracts are being widely used to perform industrial and infrastructure projects because of several reasons like high speed of implementation. However, these contracts are always accompanied by high risks and uncertainties. Thus, selection of the right EPC contractor has significant importance. This paper aims to present a fuzzy multi-criteria decision-making (MCDM) model for EPC contractor prequalification.

Design/methodology/approach

First, the EPC contractor prequalification criteria are defined by using literature review and interviewing experts. Second, the weights of criteria are determined by interviewing experts. Then, each EPC contractor is evaluated in each criterion. Finally, fuzzy weighted average (FWA) approach is employed to select the right contractor among potential EPC contractors.

Findings

The proposed model is prepared as an applicable model for clients to select the right EPC contractors among contractors who want to conduct the project.

Originality/value

As a lack of applicable model does exist to assign the prequalification of EPC contractors, this study is one of the first research studies which proposed a fuzzy MCDM model for evaluation of EPC contractors. To cope with the uncertainty of the prequalification problem, fuzzy logic has been used. Using fuzzy sets leads to reaching more reliable results. Also, a real case study is provided to explain the proposed model.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 4 December 2023

Nnedinma Umeokafor, Abimbola Windapo and Oluwole Alfred Olatunji

The purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health…

Abstract

Purpose

The purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health and safety (H&S), a project performance indicator.

Design/methodology/approach

Using non-probability purposeful and snowballing sampling methods, questionnaires were used to collect data from construction professionals in Nigeria. This was then analysed using descriptive (frequency and mean scores) and inferential statistics (Mann–Whitney-U and Kendall's Tau_b tests).

Findings

The findings indicate a statistically significant negative correlation between ‘the level of client involvement and ‘fatalities' and a positive one with ‘conducting of health and safety risk assessment' and ‘conducting employee surveys on health and safety attitude’. Poor hygiene is found to be the worst lagging indicator, while conducting of inspection is the most adopted leading indicator of project health and safety performance. It also emerged that there is no significant difference in the health and safety performance of projects procured through the procurement strategy in urban and rural areas.

Practical implications

The study provides valuable insight into the complexities in H&S management due to the high level of client involvement in labour-only procurement system (LoPS) projects and the level of diversity in their responsibilities therein. It creates a fundamental direction for developing a detailed framework or guidance notes for client involvement in the integration of H&S into LoPS projects.

Originality/value

This is the first study that examines the influence of the characteristics of procurement strategy on project health and safety performance. Evidence in the literature shows that project delivery outcomes significantly improve if procurement is strategically used, including when it is considered early in projects. However, integrating H&S into procurement strategies has received little attention.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 8 April 2024

Malik Lakshan Hasantha, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for…

Abstract

Purpose

Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for preparing a bid proposal as per the National Competitive Bidding (NCB) in the Sri Lankan context.

Design/methodology/approach

The study has adopted a mixed method approach and expert interviews and document review to detect, analyse and validate the issues, and solutions based on NCB along with the adequacy of the allocated bidding period used as main data collection tools. Both qualitative and quantitative data were analysed through manual content analysis and inferential analysis respectively.

Findings

Overall, 24 local issues with the existing competitive bidding process and solutions for each were identified. Among the 24 local issues, it was unanimously agreed by all interviewees that three specific issues require attention and improvement. These issues are related to the standard and incompleteness of bidding documents, inaccurate BOQ quantities measured by the consultant or the main contractor, and the excessive number of bidding document amendments by the consultant. It was revealed that a maximum of 42 calendar days (6 weeks) is sufficient for the bidding process while a minimum of 21 calendar days (3 weeks) is insufficient.

Originality/value

The findings of this study would be recommended that Information and Communication Technology Agency (ICTA) understand the necessity of revising the NCB reference to the time allocated for the preparation of bids. By recognising the importance of sufficient time allocation for bid preparation, this research serves as a practical guide for authorities involved in policy formulation, aiding them in implementing revisions that align with the dynamic requirements of bidding procedures.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 August 2023

MohammedShakil S. Malek and Viral Bhatt

Managing mega infrastructure projects (MIPs) is more complex because of time, size, social, environmental and financial implications. This study aims to address the management…

Abstract

Purpose

Managing mega infrastructure projects (MIPs) is more complex because of time, size, social, environmental and financial implications. This study aims to address the management approaches, complexity and risk factors involved in MIPs. The study focuses on project success criteria and their individual effects on the success of MIPs.

Design/methodology/approach

To address the challenges and identify the most influencing factor for the success of MIPs, the study deployed a cross-sectional survey approach. Six hundred eighty-two usable samples were collected from the respondents to understand the impact of predetermined factors on the success of MIPs. The structural equation model and artificial neural network approach were used to derive the importance of factors affecting the success of MIPs.

Findings

The study's outcome confirms that all three influencing factors: feasibility studies, community engagements and contract selection, have a significant positive impact on the success of MIPs. Community engagement amongst all three has the most influential predictor for the success of MIPs.

Originality/value

The developed model will enable practitioners and policymakers from Indian construction companies and other emerging nations to concentrate on recognized risk reduction variables to enhance project success criteria and project management success, especially for MIPs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 December 2022

Emmanuel Chidiebere Eze, Douglas Omoregie Aghimien, Clinton Ohis Aigbavboa and Onyinye Sofolahan

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a…

Abstract

Purpose

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a developing country's perspective. This was done with a view to reducing the waste generated in construction projects particularly at the design and pre-contract stages.

Design/methodology/approach

The study adopted a post-positivism philosophical approach, which informed the use of a quantitative research design and a questionnaire as instrument for data collection. The data gathered from construction professionals in the Nigeria construction industry were analysed using an array of statistical tools such as frequency, percentage, Kruskal–Wallis H-test, Kendall's coefficient of concordance, chi-square and exploratory factors analysis.

Findings

The study revealed five major groups of factors causing CW at the design and pre-contract stages that can be avoided or minimised through BIM implementation. These are; (1) errors in design and documentation, (2) specification and quality factors, (3) estimating and site condition factors, (4) planning of work factors and (5) procurement related factors.

Practical implications

The findings of the study offer practical insight for industry participants on the need for BIM implementation to reduce CW by identifying the diverse areas responsible for these waste generation.

Originality/value

While there has been significant literature on BIM implementation, contributions on the effect of this technology in reducing waste generation particular at the design and pre-contract stages in developing countries has been almost non-existent. This study strives to fill in this gap by showcasing the major waste generating activities that can be avoided through the use of BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 19 April 2024

Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…

Abstract

Purpose

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.

Design/methodology/approach

The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.

Findings

The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.

Practical implications

The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.

Originality/value

This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.

Details

LBS Journal of Management & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-8031

Keywords

Article
Publication date: 16 November 2021

Saeid Jafarzadeh Ghoushchi, Iman Hushyar and Kamyar Sabri-Laghaie

A circular economy (CE) is an economic system that tries to eliminate waste and continually use resources. Due to growing environmental concerns, supply chain (SC) design should…

450

Abstract

Purpose

A circular economy (CE) is an economic system that tries to eliminate waste and continually use resources. Due to growing environmental concerns, supply chain (SC) design should be based on the CE considerations. In addition, responding and satisfying customers are the challenges managers constantly encounter. This study aims to improve the design of an agile closed-loop supply chain (CLSC) from the CE point of view.

Design/methodology/approach

In this research, a new multi-stage, multi-product and multi-period design of a CLSC network under uncertainty is proposed that aligns with the goals of CE and SC participants. Recycling of goods is an important part of the CLSC. Therefore, a multi-objective mixed-integer linear programming model (MILP) is proposed to formulate the problem. Besides, a robust counterpart of multi-objective MILP is offered based on robust optimization to cope with the uncertainty of parameters. Finally, the proposed model is solved using the e-constraint method.

Findings

The proposed model aims to provide the strategic choice of economic order to the suppliers and third-party logistic companies. The present study, which is carried out using a numerical example and sensitivity analysis, provides a robust model and solution methodology that are effective and applicable in CE-related problems.

Practical implications

This study shows how all upstream and downstream units of the SC network must work integrated to meet customer needs considering the CE context.

Originality/value

The main goal of the CE is to optimize resources, reduce the use of raw materials, and revitalize waste by recycling. In this study, a comprehensive model that can consider both SC design and CE necessities is developed that considers all SC participants.

Details

Journal of Enterprise Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 20 January 2023

Liping Li, Chuan Chen, Igor Martek and Guanghua Li

Given their interrelationship, international market selection (IMS) and entry mode selection (EMS) must be considered jointly if an optimal entry strategy is to be realized…

Abstract

Purpose

Given their interrelationship, international market selection (IMS) and entry mode selection (EMS) must be considered jointly if an optimal entry strategy is to be realized. However, researchers in the field of international construction have the tendency to consider IMS and EMS independently or sequentially. Therefore, this paper aims to explore a holistic framework that can accommodate IMS and EMS concurrently and test it using empirical data.

Design/methodology/approach

his study includes theoretical and empirical research. In theoretical part, an integrated decision model of IMS and EMS is proposed adopting literature review and theoretical derivation, then hypotheses are developed for the impact of decision-making factors. In the latter part, the IMS and EMS of 54 Chinese contractors in 67 countries were investigated, empirical data are collected according to hypotheses, an ordinal logistic regression model is established for statistics analysis. Finally, findings are drawn by comparing literature-based hypotheses with data-based analysis results.

Findings

Results show that empirical data fit theoretical model well. Findings are: IMS and EMS can be integrated into a holistic decision-making framework when be properly sequenced. When IMS and EMS are determined simultaneously, the decision can benefit from a sharing of common information. And the roles of at least 13 common factors are empirically demonstrated in this study.

Research limitations/implications

The integrated decision sequence proposed in this study is applicable for a specific market, and cannot compare multiple alternative markets directly. The decision-making factors identified in this paper do not cover the enterprise strategic objectives and some other factors. Empirical data and some theoretical assumptions are based on the international market entry strategy of Chinese contractors. Therefore, the conclusions may not be completely applicable to global contractors though have certain reference value.

Originality/value

Based on the idea of holistic decision-making of IMS and EMS, this study proposes an international market entry strategy (IMES) sequence and an explicit model for determinants, then tests them with empirical data. This paper provides a new idea to manage IMS and EMS concurrently, which can improve the efficiency of IMES decision-making and avoid missing optimal alternatives. This study paves the way for a practical model and provides reference for contractors' international market entry strategy.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 October 2023

Jyh-Bin Yang and Ying-Fu Chen

An S-curve is an essential project-management tool. However, it is difficult to adjust S-curve to deal with a force majeure event. The present study develops four valuable…

Abstract

Purpose

An S-curve is an essential project-management tool. However, it is difficult to adjust S-curve to deal with a force majeure event. The present study develops four valuable adjustment approaches, designed to achieve a compromise between the views of the client and contractor. These can be used to control projects after a force majeure event.

Design/methodology/approach

The present study develops four adjustment approaches, which can be used to achieve a compromise between the views of the client and those of the contractor when controlling projects after a force majeure. To determine the S-curves during a force majeure event, two approaches can be selected: BCWS (budgeted cost of scheduled work)-base approach, or BCWP (budgeted cost of work performed)-base approach. To determine the rest of S-curves after a force majeure event, two approaches can be considered: maintaining the original curve of the remaining BCWS, or allocating the original curve of the remaining BCWS. Based on the validation of three empirical cases, drawn from a professional project-management website, this study confirms the feasibility of four proposed empirical approaches and a selection procedure for S-curve adjustment.

Findings

The S-curve-adjustment approaches presented here can be used to deal with cases that are ahead of, on and behind schedule. Using the proposed approaches and selection procedure, contractors can easily revise S-curves and control projects more effectively. To deal with a force majeure event, such as COVID-19, they are strongly advised to adopt the approaches labeled SA-A1 (to adjust the S-curve based on the extension ratio multiplied by the difference in progress during the force majeure) and SA-B1 (to maintain the original curve of the remaining BCWS) for the A/E and E/F curves, respectively.

Research limitations/implications

The proposed approaches can be used in cases of continuous construction during force majeure events. If construction work is totally suspended during such an event, it will be necessary to fine-tune the proposed approaches.

Originality/value

Previous studies have used case-oriented or mathematical-simulation approaches to forecast S-curves. The present study proposes simple approaches that allow the client and contractor to adjust the S-curve easily after a force majeure event. These approaches can be used to adjust work and project-completion targets within an extended duration. Selecting the right S-curve adjustment approach can help to control the remainder of the project, reducing the possibility of delay claims.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988