Article
Publication date: 1 April 2014

Ksenia Chmutina and Lee Bosher

Employing a case study of Barbados, the purpose of this paper is to highlight key stakeholders involved in the construction sector, discusses the roles of construction…

1006

Abstract

Purpose

Employing a case study of Barbados, the purpose of this paper is to highlight key stakeholders involved in the construction sector, discusses the roles of construction stakeholders in disaster risk reduction (DRR) and the key stages of the construction process where proactive DRR inputs could be made, The following objectives are addressed: to describe the main natural hazards in Barbados; to reveal key stakeholders involved in the decision making during the design, construction and operation process (DCOP) and DRR process; to discuss the roles of construction stakeholders in DRR and the key stages of the DCOP where proactive DRR inputs could be made; to emphasise the main barriers to the implementation of DRR in the Barbados’ construction sector.

Design/methodology/approach

A qualitative case study methodology, that includes semi-structured interviews with construction stakeholders in Barbados, a critical review of relevant literature and media coverage of natural hazards, and construction site visits.

Findings

The key construction stakeholders that should be responsible for DRR integration in construction process are identified. The main barriers to the implementation of DRR in the Barbados’ construction sector are also discussed; these include the absence of an enforced building code and complacency towards natural hazards from the general population as well as construction stakeholders.

Originality/value

Whilst some attempts have been made in mainstreaming DRR into construction projects in Barbados, many of the measures are not effectively implemented due to various constraints. In addition, little research has been done on the state of the construction sector and its use of DRR in the Caribbean. This paper aims to fill this research gap.

Details

Disaster Prevention and Management, vol. 23 no. 2
Type: Research Article
ISSN: 0965-3562

Keywords

Article
Publication date: 22 November 2022

Florence Dadzoe, Michael Addy, Daniel Yaw Addai Duah and Michael Adesi

To be able to achieve the uptake and usage of green buildings requires various actors within the construction value chain to be engaged. Despite its global uptake, green building…

Abstract

Purpose

To be able to achieve the uptake and usage of green buildings requires various actors within the construction value chain to be engaged. Despite its global uptake, green building construction is still at its nascent stage in Ghana. Most studies in sub-Saharan Africa point to the lack of knowledge as one of the mitigating factors against its development. However, there is a dearth of studies assessing the level of knowledge of stakeholders. The terms “knowledge” and “awareness” of green building construction are often used interchangeably in the Ghanaian Construction Industry (GCI). This study seeks to unearth the level of knowledge of stakeholders on green building construction through a comparative analysis of construction professionals and demand-side operators.

Design/methodology/approach

A structured questionnaire was issued to professionals in the various recognised bodies in the construction industry and public and private institutions in Ghana. Frequency, Kolmogorov–Smirnov test, median statistics and Mann–Whitney U-Test were used to rank and analyse the level of knowledge of stakeholders.

Findings

Construction professionals were more aware of green building construction than the demand-side operators. It was further identified that only a few of these stakeholders had hands-on experience as the majority of them have gained their awareness through research studies. Based on the findings of the study, it was revealed that the concept of green building construction is more abstract to stakeholders than practical despite their positive attitude towards its adoption.

Practical implications

Contextually, the study has aided in showing the level of knowledge of stakeholders on green building construction. The findings of the study aside from it aiding policymakers have also helped in identifying the perceptions and attitudes of stakeholders, their strengths and weakness in green building construction. It is recommended that due to the differences in socio-political structures and construction methods, a clear definition of green building based on the availability of resources in the GCI will encourage its adoption.

Originality/value

The study used two stakeholder groupings in the GCI as the unit of analysis. This enabled insightful discoveries into the knowledge-attitude gap of Ghanaian stakeholders that are driving the adoption of green building.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 29 September 2022

Najib AL-Fadhali

Construction project stakeholders can have a major effect on delivering projects on time. However, little attempt has been made to address the influence of internal stakeholders…

Abstract

Purpose

Construction project stakeholders can have a major effect on delivering projects on time. However, little attempt has been made to address the influence of internal stakeholders on delaying project delivery. This research aims to propose the internal stakeholders' influence as a solution to improving project delivery performance (PDP) in order to boost the value of investment in the construction industry's projects.

Design/methodology/approach

In Yemen, a structured questionnaire was distributed to owners, consultants and contractors, 283 of which were found usable after the data screening. A purposeful sampling technique was used and structural equation modelling (SEM) was adopted for analysis. The structural model was drawn up, based on seven categories of influencing factors: labour, supplier, designer, contractor, consultant, sub-contractor and owner.

Findings

The results of the structural model suggest that of these seven categories, designers, owners, suppliers and subcontractors have a significant p-value and impact on PDP, while the labour and consultant's impact was not substantiated. The findings support the proposal that internal stakeholders' influence contributes directly to construction PDP.

Originality/value

The influence of stakeholders on PDP is important. Nonetheless, few studies have focussed on their effectiveness, especially in developing countries. This paper's contribution is evaluating the cause–effect relationship between stakeholders' influence and construction PDP through analysis of moment structures (AMOS) analysis. The policy implications of the research are to encourage governments in general and construction companies in particular to take responsibility for improving PDP, as slow execution of construction projects leads to increased costs, failure and abandoning projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 4 April 2023

Andrew Ebekozien, Clinton Ohis Aigbavboa and Mantoa Ramotshela

Stakeholder engagement in construction projects is an ingredient that contributes to project optimal performance. Many developing countries have a paucity of literature about…

4627

Abstract

Purpose

Stakeholder engagement in construction projects is an ingredient that contributes to project optimal performance. Many developing countries have a paucity of literature about stakeholders' engagement in construction projects. Therefore, the study investigated South Africa's shareholders' engagement in construction projects and recommended possible measures to mitigate potential limitations.

Design/methodology/approach

The researchers collated data from South African experts in stakeholder engagement via a phenomenology type of qualitative research design. They explored the “perceived hindrances” facing stakeholders' engagement in construction projects and proffer measures to mitigate them. The study analysed collected data via thematic analysis and achieved saturation. Three themes emerged from the analysed data.

Findings

Findings show that efficient stakeholder engagement will enhance team collaboration and integrated construction project delivery. Results identified the perceived limitations facing stakeholders' engagement in South Africa's construction projects and categorised them into individual perceived hindrances, organisational perceived hindrances and government-related perceived hindrances. Also, findings proffer measures to mitigate perceived hindrances via policies and programmes within the sector.

Practical implications

Besides enhancing policymakers and other stakeholders in South Africa's construction industry to understand the benefits of stakeholder engagement better, the study may stir up the construction sector's stakeholders to embrace enhanced and effective stakeholders' management.

Originality/value

This study contributes to construction project practice that involves stakeholders, as it reveals the underlying causes of perceived hindrances facing stakeholders' engagement in construction projects. Also, it proffers feasible solutions to mitigate these hindrances and enhance stakeholders' engagement within South Africa's construction projects.

Details

Benchmarking: An International Journal, vol. 31 no. 3
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 1 March 2022

Emmanuel Yaw Frempong-Jnr, Simon Ofori Ametepey and John Edward Cobbina

The construction industry’s contribution to environmental deterioration is widely established in the literature, implying that addressing this issue will require a coordinated…

Abstract

Purpose

The construction industry’s contribution to environmental deterioration is widely established in the literature, implying that addressing this issue will require a coordinated effort from all stakeholders. According to literature, stakeholder involvement without stakeholder management (SKM) is not enough, in ensuring efficient construction waste management (CWM). This study investigates the impact of SKM on efficient CWM by aggregating all relevant SKM variables and measuring their degree of influence on efficient CWM.

Design/methodology/approach

This study used a four-stage research approach that included a literature review, a pilot study, a questionnaire survey and statistical analysis. After a thorough examination of the literature, nine essential SKM factors were identified and tested by a questionnaire survey following a pilot study. A total of 310 questionnaires were filled out and returned for analysis (exploratory and confirmatory factor analysis).

Findings

The study established that SKM is a unidimensional construct since all the variables extracted unto one underlying component with total variance explained (TVE), accounting for 58.938% of the total Variance in the measure of SKM in efficient CWM. Additionally, the reliability and validity test results satisfied the recommended thresholds, thus justifying the factorability of the construct. Furthermore, the hypothesis test revealed that SKM has a statistically significant impact on efficient CWM, implying that increasing SKM will have a beneficial impact on efficient CWM.

Research limitations/implications

The study is limited to material waste management in the construction industry and the outcome was determined solely by a field survey in Ghana. Extending the study to other jurisdictions would have improved its findings and made them easier to generalise.

Practical implications

The study’s findings are helpful for practitioners and researchers, especially regarding the influence of the eight SKM variables on efficient CWM.

Social implications

The study’s findings will reduce pollution, thus enhancing public health and encouraging social inclusion through the creation of jobs in the waste management chain.

Originality/value

The uniqueness of this study is anchored on the fact that no CWM study has considered all the eight SKM variables measured in this study at the same time. Also, this study has contributed to the literature by establishing the determinants of SKM in efficient CWM in Ghana.

Details

Smart and Sustainable Built Environment, vol. 12 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 15 May 2017

Jurbe Joseph Molwus, Bilge Erdogan and Stephen Ogunlana

Stakeholder management plays a significant role in successfully delivering construction projects. However, being able to carry out effective stakeholder management in construction…

2379

Abstract

Purpose

Stakeholder management plays a significant role in successfully delivering construction projects. However, being able to carry out effective stakeholder management in construction is contingent upon understanding the interrelationships among critical success factors (CSFs) for stakeholder management in construction and how they are related to project success (PS). This would enable the persons responsible for stakeholder management to know the logical process for addressing the CSFs in order to get stakeholder management right. The understanding of this relationship has not been addressed. The purpose of this paper is to investigate the interrelationships between the CSFs for stakeholder management and PS in construction.

Design/methodology/approach

From an extensive literature review, 23 CSFs for stakeholder management in construction were identified. A conceptual structural equation model (SEM) of the relationships between CSFs was developed (including measurement and structural models) using the groupings of the CSFs for stakeholder management in construction. A questionnaire survey was used to collect data from construction industry practitioners. The data so collected were analysed using SEM in analysis of moment structures (AMOS).

Findings

The SEM analysis of data collected resulted in the best fitting measurement model comprising 16 CSFs as indicators of four latent variables, namely, stakeholder characteristics and project characteristics (SCPC); stakeholder analysis (SA); stakeholder dynamics (SD); and stakeholder engagement/empowerment (SE). Furthermore, it was found that only SE has a direct positive impact on PS. The other three constructs SCPC, SA and understanding SD collectively impact on PS through the construct, SE.

Research limitations/implications

The research reported in this paper was carried out in the UK; hence, the findings may have portrayed the UK construction professionals’ opinion. However, the theoretical principles on which the research was based are general and similar research could be replicated in different countries whose construction procurement processes and industries are structured like those of the UK or otherwise.

Practical implications

The main contribution of this study to existing knowledge is an empirical evidence of the interrelationships among the CSFs for stakeholder management in construction through their latent variables which is portrayed in the best fitting structural model showing the relationships between the constructs of CSFs for stakeholder management and PS. This should serve as a guide to construction project management team or responsible professionals for undertaking stakeholder management in construction projects.

Originality/value

The paper contributes to theory by empirically identifying the interrelationships among the CSFs for stakeholder management linking to PS which will serve as a guide to construction professionals.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 July 2019

Muhammad Irfan, Muhammad Jamaluddin Thaheem, Hamza Farooq Gabriel, Muhammad Sohail Anwar Malik and Abdur Rehman Nasir

The purpose of this research is to quantify the effect of stakeholder conflicts on project constraints in the construction industry using ordinal regression analysis. For this…

1987

Abstract

Purpose

The purpose of this research is to quantify the effect of stakeholder conflicts on project constraints in the construction industry using ordinal regression analysis. For this purpose, the most significant project constraints and factors that cause stakeholder conflicts found in the literature are measured.

Design/methodology/approach

Factors causing stakeholder conflicts and project constraints are extracted through a content analysis of the published literature. Further, a questionnaire survey is conducted involving 170 professionals to assess the effect of conflicts on project constraints. Finally, to obtain a more objective assessment, a statistical model is developed, and to highlight the most severe factors causing conflict and impacting project constraints, ordinal regression analysis is performed.

Findings

The results show that in the construction industry, all project constraints are affected by stakeholder conflicts. Factors that result in stakeholder conflicts indicated a positive relationship with cost, time and resources. This means that any increase or decrease in the effect of stakeholder conflicts will directly influence these three project constraints. Similarly, a negative relationship was observed between stakeholder conflicts and quality, workforce productivity, protection of environment and safety regulations in the construction industry, indicating that increase in the effect of stakeholder conflicts will decrease these four project constraints and vice versa. The results for cumulative ordinal regression model highlight that lack of communication, poor quality of completed works and change orders and rework have intense effects on project constraints collectively.

Originality/value

A small number of studies have been undertaken to examine the emergence of project constraints in the developing countries. And even more, its relationship with stakeholder conflicts in the construction industry is limited. This research highlights the most significant project constraints and factors that result in stakeholder conflicts in the construction industry. Therefore, this study adds to the existing body of knowledge by developing an ordinal regression model that will help decision-makers and top management control this enigma of stakeholder conflicts in the construction industry.

Details

International Journal of Conflict Management, vol. 30 no. 4
Type: Research Article
ISSN: 1044-4068

Keywords

Article
Publication date: 28 April 2020

Ibrahim Yahaya Wuni and Geoffrey Qiping Shen

Prefabricated prefinished volumetric construction (PPVC) projects are industrialized building systems that are co-created. Thus, effective management of the involved stakeholders…

Abstract

Purpose

Prefabricated prefinished volumetric construction (PPVC) projects are industrialized building systems that are co-created. Thus, effective management of the involved stakeholders is required to ensure project success. However, knowledge of how best to manage the diverse stakeholders in PPVC projects is limited. This research identified and prioritized the success factors or key result areas (KRAs) for the effective stakeholder management (SM) in PPVC projects.

Design/methodology/approach

A quantitative research design was implemented involving a literature review and structured questionnaire survey with international PPVC experts. The research identified and statistically analysed 12 KRAs for SM in PPVC projects.

Findings

Analysis showed that the top three KRAs for SM in PPVC projects include: effective working collaboration, communication and information sharing among participants; effective coordination of the PPVC supply chain segments; and early involvement of relevant stakeholders in the PPVC project. A factor analysis clustered the 12 KRAs into stakeholder analysis and early involvement, effective communication and information sharing and stakeholder interest integration and conflict management.

Practical implications

The paper identified and prioritized the KRAs required for the effective SM in PPVC projects. To practitioners, the results may serve as decision support on the key areas to focus to ensure effective SM in PPVC projects and may guide the efficient allocation of limited resources.

Originality/value

This research constitutes the first exclusive attempt at identifying and benchmarking the generic KRAs required for effective SM in PPVC projects and contributes to the SM body of knowledge in industrialized construction.

Details

Built Environment Project and Asset Management, vol. 10 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 18 May 2020

Ashish Goel, L.S. Ganesh and Arshinder Kaur

Past research recommends integration of social sustainability (SS) considerations in construction project feasibility study for benefitting a larger group of project stakeholders…

1688

Abstract

Purpose

Past research recommends integration of social sustainability (SS) considerations in construction project feasibility study for benefitting a larger group of project stakeholders. However, there is a lack of empirical evidence to this effect, especially from the developing economies. The purpose of this study is to address this knowledge gap through a SS-centric analysis of feasibility study reports using a stakeholder salience perspective.

Design/methodology/approach

Feasibility study reports for 61 projects were obtained from various government organizations in India. The SS considerations were identified in the reports using a combination of quantitative and qualitative assessments. The former was based on content analysis and the latter was conducted using “VOSviewer” text analysis software.

Findings

SS considerations related to occupational health and safety, workers' employment practices and proactive involvement of communities and end-users were found to be inadequately addressed in the reports. Based on occurrences of the SS considerations, project-affected community was found to be the most salient stakeholder, followed by the end-users and the construction workers. Statistical analysis revealed significant relationship between the SS considerations and the type of project as well as the type of project delivery system.

Originality/value

This study contributes to better understanding of integrating SS considerations in feasibility study of construction projects. Its results provide useful inputs to decision-makers for orienting construction projects, right from the early phases, towards benefitting the disadvantaged and weaker stakeholders irrespective of their salience attributes. In developing economies, such interventions may improve quality of lives of a large number of project stakeholders and also cultivate a positive societal image of the construction industry as a respectful, ethical and employee friendly industry.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 March 2015

Essam Almahmoud and Hemanta Kumar Doloi

This paper aims to propose a framework that puts the stakeholders at the forefront of achieving sustainability in the social context. This research, thus, argues that the social…

3916

Abstract

Purpose

This paper aims to propose a framework that puts the stakeholders at the forefront of achieving sustainability in the social context. This research, thus, argues that the social sustainability outcomes in construction are best achieved by taking into account the satisfactions of the stakeholders.

Design/methodology/approach

Based on sustainability and equity theories, a dynamic assessment model has been developed to evaluate the contributions of projects in a social context. Multiple stakeholders and their differing interests associated with the construction projects have been integrated using social network analysis. The mapping of the relationships between the project stakeholders, with respect to their relative stakes and seven social core functions, have been integrated in the assessment model.

Findings

The findings of this research suggest that the degree of satisfying the needs of diverse stakeholders is highly significant in achieving social sustainability performance of projects. Using a case study from Saudi Arabia, the applicability and significance of the assessment model has been demonstrated. The application of the model provides the opportunity to identify any problems and to enhance the overall performance of projects in the social context.

Research limitations/implications

The functionality and efficacy of the model need to be further tested outside the Saudi Arabian region.

Originality/value

The research is original in the sense that for the first time, a novel approach has been developed, putting the stakeholders at the forefront of achieving sustainability outcomes in construction projects.

Details

Facilities, vol. 33 no. 3/4
Type: Research Article
ISSN: 0263-2772

Keywords