Yuan Chen and John M. Kamara

The purpose of this paper is to develop a model for the use of mobile computing in the management of on‐site construction information and communication.

4847

Abstract

Purpose

The purpose of this paper is to develop a model for the use of mobile computing in the management of on‐site construction information and communication.

Design/methodology/approach

The research strategy contains three steps: a pilot study for the first stage, a survey that investigated the information needs of particular users and the nature of on‐site information, and finally the development of a model and the validation and evaluation by operational scenarios.

Findings

The developed model explores how mobile computing can be used on construction sites to manage on‐site information. This model, firstly, identifies the key factors of mobile computer, wireless network, mobile application, construction personnel, construction information, and construction site; secondly it describes the relationships and interactions among these factors. Based on the model, the selection process for mobile computing strategy includes the clarification of information management process, the creations of overview for mobile computing solution, the identification of mobile computing strategy, and the selection of appropriate mobile computing technology.

Originality/value

The developed model explores the general concepts and the internal relationships at the two areas of mobile computing and construction site information management. The application of the model can help users to select mobile computing strategies for managing on‐site construction information based on the characteristics of their projects.

Details

Engineering, Construction and Architectural Management, vol. 15 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 March 2007

Harriet K. Eliufoo

This paper aims to explore how the gendered division of labour in construction sites in Zanzibar influences earnings, resource ownership and wellbeing of female and male…

1312

Abstract

Purpose

This paper aims to explore how the gendered division of labour in construction sites in Zanzibar influences earnings, resource ownership and wellbeing of female and male construction workers.

Design/methodology/approach

Case studies were made in five construction sites in Zanzibar where informal interviews and questionnaires were used to collect information; a total of 150 construction workers participated.

Findings

Finds that through the gendered division, women are subordinated; and that the social position of women, subjects women to a vicious cycle that hampers acquisition of construction skills.

Research limitations/implications

The research has limited itself to Zanzibar, a society with an influence of Arab culture. Future research in other cultures could be of interest in order to investigate the influence of culture on such studies.

Practical implications

Women need to acquire technical training that would improve their employment situation. Women working on construction sites should not consider themselves as compelled to be in a “fit‐in situation” rather they should reject discriminatory values. The acquisition of construction skills and training should be a strong initiative from women themselves.

Originality/value

This paper establishes how gendered divisions of labour in construction sites influences earning, resource ownership and wellbeing of female and male site workers.

Details

Women in Management Review, vol. 22 no. 2
Type: Research Article
ISSN: 0964-9425

Keywords

Content available
Article
Publication date: 25 April 2023

Benjamin Jowett, David John Edwards and Mohamad Kassem

This study aims to develop a taxonomy of requirements for mobile BIM technologies (MBT), clarify the relating terms and concepts, and identify the interactions between MBT…

Abstract

Purpose

This study aims to develop a taxonomy of requirements for mobile BIM technologies (MBT), clarify the relating terms and concepts, and identify the interactions between MBT features and the construction management functions on sites.

Design/methodology/approach

A positivist approach with elements of interpretivism is adopted to allow to capture what is perceived as “reality” in relation to individuals’ interpretation and experience in the use and implementation of MBT. This is achieved by using a mixed qualitative-quantitative approach that can capture the various understandings of MBT. The research methods included a longitudinal case study over 12 months, two project workshops, expert interviews and an industry survey that together helped to investigate MBT at project, enterprise and industry levels.

Findings

The MBT requirements taxonomy included requirements relating to both project and organisation. Project requirements addressed MBT functionalities for sites and information management, while organisation requirements focused on the integration of MBT solutions with the enterprise from information technology, legal and security perspectives. A detailed matrix showing the interactions between five key MBT features and seven construction management functions was also developed.

Research limitations/implications

The two constructs developed by this study can help researchers to structure their investigation of key uses of MBT applications and their benefits. It can be used by researchers aiming to investigate integrated approaches to the digitalisation of construction sites, such as those enabled by Digital Twins. The interaction matrix can aid researchers in evaluating the intersections between the MBT functionalities and the site construction management functions (e.g. theoretical analysis of interactions from Lean Construction, benefit evaluation perspective). More broadly, the two constructs can support research and practice investigating the development of data-driven approaches on construction sites.

Practical implications

The developed MBT taxonomy can guide construction organisations in selecting suitable MBT for Field BIM for their projects. It can also act as a baseline against which varying MBT solutions can be compared.

Originality/value

Constructs such as taxonomies for MBTs; an understanding of MBT capabilities and use within the industry; and a lack of delineation between related terms, such as Mobile BIM, Field BIM, Site BIM, Cloud BIM and Mobile Apps, were lacking in the literature. This study contributed to addressing this gap.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 September 2022

R.V.K. Vigneshwar and S. Shanmugapriya

Proper prediction of productivity can enable the enhanced estimation, realistic scheduling, and accurate cost forecasting of construction processes. Due to the existence of…

Abstract

Purpose

Proper prediction of productivity can enable the enhanced estimation, realistic scheduling, and accurate cost forecasting of construction processes. Due to the existence of different labor sources (unionized and non-unionized), the prediction of productivity is still a significant problem in India. Moreover, the construction procurement processes and on-site performance are the predominant elements that can result in improved project outcomes. Thereby, the consideration of labor constraints and site conditions will play an important role in productivity improvement.

Design/methodology/approach

This study investigates the factors affecting construction site productivity. A total of 28 factors are grouped under 7 categories as follows: labor constraints, safety and quality procurements, material and equipment (ME), site management, project working condition, delay controls, construction methods and techniques, and external factors. Furthermore, by involving these factors, the questionnaire survey was conducted among Indian construction practitioners. As a result, 204 responses were received and the data were analyzed using a reliability test, relative importance index (RII), and analysis of variance (ANOVA).

Findings

The result of this study highlighted the importance of strategic construction management activities in terms of effective planning of ME, planning and realistic scheduling of construction activities, proper communication, information sharing, etc. Thus, this study provides a clear insight to the Indian construction practitioners in determining the effect of these site factors on the successful execution of their projects.

Originality/value

In this paper, the problem of construction productivity in India and its causes are explained effectively. This study examines the preference of labor contract, labor source, and most importantly, the factors affecting site productivity. Moreover, the other lagging issues regarding the management of construction activities are also described in detail.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 September 2019

Kweku Bedu Simpson and Aloysius Sam

This paper aims to investigate the contemporary strategies for Health and Safety (H&S) management practices at the construction sites in Ghana.

Abstract

Purpose

This paper aims to investigate the contemporary strategies for Health and Safety (H&S) management practices at the construction sites in Ghana.

Design/methodology/approach

The study used a mixed method approach in conducting a cross-sectional survey at 28 active construction sites in the Kumasi and Accra metropolises of Ghana using questionnaires and interview guide by using purposive, convenience and snowball sampling techniques. Data were collected from 170 survey respondents and 18 interview participants comprising artisans and management staff.

Findings

On H&S management practices, the study found that most construction sites have policies for H&S delivery and are duly followed and enforced. Nonetheless, construction workers moderately agreed that there was reward for; the avoidance and reduction of accidents and illnesses, good H&S behaviour and provision for insurance and hospital claims. It was also revealed that most of the construction sites adopt either one or a combination of mandatory H&S standards. Generally, most workers possessed a fairly positive perception about the H&S management practices at their sites and were either satisfied or very satisfied with its performance.

Research limitations/implications

Generalizing the findings beyond the study areas is limited because of the use of the non-probability sampling techniques.

Originality/value

This study focused on the active construction sites in the study areas to investigate their H&S practices against the backdrop of numerous publications describing the general H&S situation in Ghana as poor. It revealed the current H&S performance of the construction sites for the benefit of the construction industry, researchers and the academia.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 17 April 2008

Chih‐Yao Huang, Ching‐Piao Chen, Rong‐Kwei Li and Chih‐Hung Tsai

The steel bars account for a high percentage of material costs for the current construction projects. At the present time, most of the construction projects for the factories of…

Abstract

The steel bars account for a high percentage of material costs for the current construction projects. At the present time, most of the construction projects for the factories of thin‐film transistor liquid crystal display (TFT‐LCD) complete the transactions of steel bars when the suppliers ship the steel bars to the temporary storage/processing sites. This paper applies the buy‐in concept in the Theory of Constraint (TOC) on the supply chain of steel bars. In this study, suppliers are required to establish warehouses at the construction sites and complete the transactions when the formed and processed steel bars are shipped into the factory sites. The aim is to find a win‐win solution to meet with the expectations from constructors as they hope that there is no need to build up inventories but supply is ready at any time. Also, this paper compares and analyzes the traditional supply/inventory model of steel bars and the Demand‐Pull (D‐P) model under the TOC framework. It is proved that Vendor Management Inventory (VMI) in the D‐P model is able to more effectively manage steel bars as a material.

Details

Asian Journal on Quality, vol. 9 no. 1
Type: Research Article
ISSN: 1598-2688

Keywords

Article
Publication date: 10 February 2021

Fei Jin Ying, Michael O’Sullivan and Ivo Adan

Materials supply is one of the important elements in construction operation and a major factor affecting the quality of construction projects. Many industries look to manage…

Abstract

Purpose

Materials supply is one of the important elements in construction operation and a major factor affecting the quality of construction projects. Many industries look to manage materials effectively by attempting to integrate logistics processes into logistics chains of suppliers and customers. Logistics processes, being crucial for successful completion of construction projects, but in fact, auxiliary, are often entrusted to external professionals specialised in logistic services, such as logistics centres. However, this tendency is yet to be developed in construction. The purpose of this paper is to develop a simulation framework for the examination of potential improvements of logistics performance using logistics centres.

Design/methodology/approach

A case study approach was adopted with computer simulation using Flexsim. Data of vehicle movements were collected during construction on-site from the start of construction to “hand-over” to the building owner.

Findings

The ideal location of a logistics centre is identified using vehicle movements data collected on the site. The potential improvements of the planned centre are then evaluated by simulating various scenarios of vehicle movements. The enclosed results from the simulations indicate that using a logistics centre will reduce waste for the construction project considered.

Originality/value

The paper emphasises that creating a logistics centre for a project can improve construction logistics performance, by consolidating and optimizing both off-site and on-site logistics, especially when the site condition is prohibitive (small footprint with limited loading bay area). Establishing logistics centres may help find ways of making the overall construction project more effective by improving the management of materials.

Details

Construction Innovation , vol. 21 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 24 April 2020

Weiguang Jiang, Lieyun Ding and Cheng Zhou

Construction safety has been a long-term problem in the development of the construction industry. An increasing number of smart construction sites have been designed using…

1935

Abstract

Purpose

Construction safety has been a long-term problem in the development of the construction industry. An increasing number of smart construction sites have been designed using different techniques to reduce injuries caused by construction accidents and achieve proactive risk control. However, comprehensive smart construction site safety management solutions and applications have yet to be developed. Thus, this study proposes a smart construction site framework for safety management.

Design/methodology/approach

A safety management system based on a cyber-physical system is proposed. The system establishes risk data synchronization mapping between the virtual construction and physical construction sites through scene reconstruction design, data awareness, data communication and data processing modules. Personnel, mechanical and other risks on site will be warned and controlled.

Findings

The results of the case study have proved the management benefits of the system. On-site workers gradually realized that they should enter the construction site based on the standard process. And the number of people close to the construction hazard areas decreased.

Research limitations/implications

There are some limitations in the technology of smart construction site. The modeling speed can be faster, the data collection can be timelier, and the identification of unsafe behavior can be integrated into the system. Construction quality and efficiency issues in a virtual construction site will also be solved in further research.

Practical implications

In this paper, this system is actually applied in the mega project management process. More practical projects can use the management ideas and method of this paper to ensure on-site safety.

Originality/value

This study is among the first attempts to build a complete smart construction site based on CPS and apply it in practice. Personnel, mechanical, components, environment information will be displayed on the virtual construction site. It will greatly promote the development of the intellectualized construction industry in the future.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 January 2017

Micael Thunberg, Martin Rudberg and Tina Karrbom Gustavsson

This study aims to identify and categorise common on-site problems from a supply chain management (SCM) perspective and to trace the origin of these problems in the construction…

3629

Abstract

Purpose

This study aims to identify and categorise common on-site problems from a supply chain management (SCM) perspective and to trace the origin of these problems in the construction project process, the supply chain or in the intersection between these processes. This allows for identification of how on-site problems affect SCM in construction projects and how they can be mitigated.

Design/methodology/approach

A literature review in combination with semi-structured interviews was used to identify on-site problems. This enabled triangulation and strengthened both construct validity and internal validity.

Findings

On-site problems can be categorised in one of the four following categories: material flows, internal communication, external communication or complexity. The first category has its origin in the supply chain, the second in the construction project process, the third in the supply chain-construction process intersection on site and the fourth in the construction project as a whole. The findings conclude that on-site problems often originate from construction companies’ lack of supply chain orientation.

Research limitations/implications

It is suggested that supply chain planning (SCP) can facilitate on-site problem mitigation in construction project management. This extends the body of knowledge of SCP in construction project management and supports the development of effective on-site construction project management.

Practical implications

The results show that SCP can aid construction project management in handling on-site problems earlier in the project process.

Originality/value

The main value lies in extending the body of knowledge in construction project management research by applying an SCM perspective and by introducing SCP to support more effective construction project management.

Details

Construction Innovation, vol. 17 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 21 November 2016

Ketil Bråthen and Anita Moum

The majority of research on the implementation and use of Building Information Models (BIM) have focused on building design and pre-construction planning. There is only limited…

2453

Abstract

Purpose

The majority of research on the implementation and use of Building Information Models (BIM) have focused on building design and pre-construction planning. There is only limited research on the usage of BIM in the construction phase, especially by site workers. The purpose of this paper is to analyze the use of BIM by site workers through so-called “BIM-kiosks”. The kiosks allow workers to access BIM models on-site. The aim of this paper is to take a closer look on the introduction of BIM-kiosks and scrutinize how and for what purpose site workers use the kiosks.

Design/methodology/approach

This is a single case study of an ongoing real-world construction project. The case study is based on qualitative data which stems from observational studies, interviews as well as document studies.

Findings

Site workers find opportunities for 3D visualization useful and the BIM models are appraised for efficiently handling complex elements. The findings also indicate that the use of BIM-kiosks lead to a greater level of face-to-face collaboration between workers on-site. This may happen because workers meet, both planned and randomly, to discuss in front of the kiosks while using it for visualization.

Research limitations/implications

The research is limited to a single case. However, some of the recommendations may be relevant to other projects. In addition, the findings demonstrate some of the potential of using BIM on-site in upcoming construction projects.

Originality/value

Only a few studies have addressed the use of BIM among site workers. Thus, the findings provide practitioners and researchers insight into how current practices may be improved, as well as areas where more research is needed.

Details

Engineering, Construction and Architectural Management, vol. 23 no. 6
Type: Research Article
ISSN: 0969-9988