Search results

1 – 10 of over 4000
Article
Publication date: 26 March 2024

Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An and Xueying Bao

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects…

Abstract

Purpose

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.

Design/methodology/approach

This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.

Findings

The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.

Originality/value

The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 March 2024

Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…

Abstract

Purpose

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.

Design/methodology/approach

Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.

Findings

Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.

Originality/value

The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 February 2024

Sara S. Badran and Ayman Bahjat Abdallah

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in…

Abstract

Purpose

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in Jordan. This study focuses on six key project performance outcomes, namely cost, time, quality, client satisfaction, innovation and responsiveness.

Design/methodology/approach

The present study employed a quantitative approach to achieve the research objectives. Accordingly, a multi-item survey questionnaire was prepared to gather data from 392 project managers from construction companies in Jordan. The study’s model showed acceptable levels regarding reliability, validity, fit indices and discriminant validity. In order to test the hypotheses of this study, path analysis was employed using Amos 24.0 software.

Findings

LPM demonstrated a remarkably high positive impact on cost performance. It also positively affected quality performance and client satisfaction. However, LPM insignificantly affected time, innovation and responsiveness performance measures. On the other hand, APM showed a notably high positive impact on innovation and responsiveness. The findings also revealed that APM positively impacted quality performance and client satisfaction. In addition, APM negatively impacted cost performance and insignificantly impacted time performance.

Originality/value

This study is one of the first comprehensive studies to empirically examine the impact of both LPM and APM on various project performance outcomes in the construction industry in the context of a developing country. It reveals some similarities and differences between LPM and APM with regard to their impacts on project management outcomes. The findings are expected to guide managers in selecting the appropriate project management approach based on the desired performance outcomes. Accordingly, it offers important implications for project managers in construction companies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 March 2023

Titus Ebenezer Kwofie, Florence Akyaa Ellis, Michael Nii Addy, Samuel Amos-Abanyie, Clinton Aigbavboa and Samuel Owusu Afram

The link between relationship typologies and effectiveness of conflict resolution approaches remains to be tested despite its significance in conflict management in construction…

Abstract

Purpose

The link between relationship typologies and effectiveness of conflict resolution approaches remains to be tested despite its significance in conflict management in construction project delivery. By using the four relationships attributes based on the group attachment theory, the purpose of the study was to explore the cluster of relationships among project teams and organisations and the performance of conflict management strategies across these clusters in the Ghanaian construction industry.

Design/methodology/approach

Using a deductive questionnaire survey in the Ghanaian construction industry, a total of 137 responses were gathered and analyzed using cluster analysis, mean scores and ANOVA to reveal the relationship clusters and performance of conflict management strategies across these clusters.

Findings

The results revealed eight relationship clusters that exist among project teams and organisations with distinct influence of roles & tasks function, cognition, emotions and behavior attributes across the relationship clusters. In the aspect of the effectiveness of conflict management strategies, it was noted that the performance of these strategies were significantly different across the groups. For instance, integrating as a conflict management strategy was deemed to be effective in resolving conflict in unitary, adversarial, pluralist, mutuality, collaborative and partnering relationship clusters. In the case of coopetitive and coercive relationships, the performance of integrating as a conflict management strategy was less effective. This study thus has empirically proved that, different relationship clusters of teams and organizations exist within the Ghanaian construction industry, and that they perform different roles & tasks functions, cognition, emotions and behavioural attributes in their formation. Additionally, the performance effectiveness of conflict management strategies differed across the relationship clusters.

Originality/value

By aligning the relationship attributes to the dynamics of relationship clusters experienced in project teams and organisations, relationship quality, suitability and effectiveness of conflict management strategies can be optimized. The findings can inform project teams and stakeholders to develop fit-for-purpose relationship attributes among teams and organisations to enhance team effectiveness, relationship quality and conflict management in the industry.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 3
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 1 April 2024

Zoubeir Lafhaj, Slim Rebai, Olfa Hamdi, Rateb Jabbar, Hamdi Ayech and Pascal Yim

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of…

Abstract

Purpose

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of construction project monitoring and management. This research aims to enhance efficiency, transparency and trust within the dynamic and collaborative environment of the construction industry by leveraging the decentralized, secure and immutable nature of blockchain technology.

Design/methodology/approach

This paper employs a comprehensive approach encompassing the formulation of the COPULA model, the development of a digital solution using the ethereum blockchain and extensive testing to assess performance in terms of execution cost, time, integrity, immutability and security. A case analysis is conducted to demonstrate the practical application and benefits of blockchain technology in real-world construction project monitoring scenarios.

Findings

The findings reveal that the COPULA framework effectively addresses critical issues such as centralization, privacy and security vulnerabilities in construction project management. It facilitates seamless data exchange among stakeholders, ensuring real-time transparency and the creation of a tamper-proof communication channel. The framework demonstrates the potential to significantly enhance project efficiency and foster trust among all parties involved.

Research limitations/implications

While the study provides promising insights into the application of blockchain technology in construction project monitoring, future research could explore the integration of COPULA with existing project management methodologies to broaden its applicability and impact. Further investigations into the solution’s scalability and adaptation to various construction project types and sizes are also suggested.

Originality/value

This research offers a comprehensive blockchain solution specifically tailored for the construction industry. Unlike prior studies focusing on theoretical aspects, this paper presents a practical, end-to-end solution encompassing model formulation, digital implementation, proof-of-concept testing and validation analysis. The COPULA framework marks a significant advancement in the digital transformation of construction project monitoring, providing a novel approach to overcoming longstanding industry challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 8 April 2024

Hasith Chathuranga Victar and Anuradha Samarajeewa Waidyasekara

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address…

Abstract

Purpose

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address these issues, this study explores the application of Circular Economy (CE) strategies in minimising waste generation and optimising resource utilisation in Sri Lankan construction industry. The research focuses on the construction and building renovation and use and operate stages of the building project life cycle, recognising their significance in waste generation and resource consumption.

Design/methodology/approach

The research employed a qualitative approach, utilising the Delphi technique through three rounds of expert interviews. Seventeen experts were involved in the first round, followed by fifteen in the second round, and twelve in the final round. The collected data was analysed using manual content analysis methods.

Findings

The research findings revealed fifteen C&D WM issues in the construction and building renovation stage in Sri Lanka, along with suitable strategies to overcome each of them. Similarly, eight C&D WM issues were identified for the use and operate stage of the building, and corresponding strategies were provided to address each issue. By adopting CE strategies such as modular design and material reuse, construction projects can optimise the project's timeline, cost, and quality factors. These strategies enable efficient resource allocation, reduce waste generation, and contribute to the overall sustainability of the project. The impact of CE strategies on mitigating these issues within the project management iron triangle was also discussed.

Originality/value

This paper entails delving into how construction, building renovation, and operation stages of a building's life cycle intersect with CE strategies, which profoundly influence operational efficiency and long-term sustainability. By incorporating principles such as energy efficiency, water conservation, and circular product design, the paper illuminates how these strategies facilitate decreased energy usage, enhanced resource management, and diminished waste production throughout the building's lifespan.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 12 February 2024

Lerato Aghimien, Clinton Ohis Aigbavboa and Douglas Aghimien

In the quest for better construction workforce management, this chapter explored the background of workforce management and related theories, models, and practices. Through a…

Abstract

In the quest for better construction workforce management, this chapter explored the background of workforce management and related theories, models, and practices. Through a review, the chapter provided meaning to the concept of construction and workforce management. The chapter concluded that while the construction industry worldwide is important to the economic growth of the countries where it operates, the industry’s management of its workforce is challenged by several problems. These problems include the nature of the industry, skill shortage, unhealthy working environment, and poor image of the industry, among others. Also, while the construction industry is rich in diversity, this has been a major source of problems for workforce management. The chapter further revealed that to improve workforce management and attain better-performing construction organisations, careful recruitment, effective training, providing a safe working environment, putting policies to promote diversity, and ensuring innovativeness, among others, are essential.

Details

Construction Workforce Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-83797-019-3

Keywords

Open Access
Article
Publication date: 4 August 2023

Christopher Amoah

In addressing the housing deficits for the less privileged citizens, the South African government began constructing social housing after coming to power in 1994. However, the…

1036

Abstract

Purpose

In addressing the housing deficits for the less privileged citizens, the South African government began constructing social housing after coming to power in 1994. However, the construction of these houses is bedevilled with many issues; prominent among them are poor quality of the constructed houses. This study seeks to develop a quality management framework for achieving quality and efficiency in public-sector housing construction, a hallmark of the country's procurement goals.

Design/methodology/approach

Telephone interviews were conducted with construction professionals involved in constructing government social houses across South Africa, chosen randomly. The data gathered were analysed using the content analysis method.

Findings

The study found that the most significant cause of poor quality government-constructed social housing is multifaceted, categorised into project management-related, procurement-related, contractor-related, corruption-related and political-related.

Practical implications

Failure to develop and implement a quality management framework on government-constructed social housing leads to poor quality social housing.

Originality/value

The study has identified quality-related issues and has developed a Quality Management (QM) framework for the stakeholders involved in the construction of the houses to guide them in the project implementation process to ensure project success and quality standards.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 5 December 2023

Lahiru Supun Deshan Rathnayaka, Buddha Koralage Malsha Nadeetharu and Udayangani Kulatunga

Documentation plays a key role in navigating the costs of construction projects. Traditional document management systems (TDMS) used in developing countries, however, hinder the…

Abstract

Purpose

Documentation plays a key role in navigating the costs of construction projects. Traditional document management systems (TDMS) used in developing countries, however, hinder the achievement of expected cost targets. Although the electronic document management system (EDMS) has been implemented to improve documentation, the Sri Lankan construction industry has failed to effectively adapt to it. Hence, this study aims to provide strategies for the effective application of EDMS to the cost management of Sri Lankan mega construction projects.

Design/methodology/approach

This study uses a qualitative approach followed by 12 semi-structured expert interviews. Quantity surveying experts were selected through judgemental sampling. Manual content analysis was used to analyse the data.

Findings

The EDMS is more suitable for megaprojects than traditional methods of documentation in terms of functionality, neutrality, interoperability, space, reversibility and delivery speed. However, there are contradictory views about cost and security. Furthermore, five transitional challenges of EDMS have been identified under the three key themes of cost, stakeholder perception and technical difficulties. Four reasons were also identified as causing these five challenges. Seven suggestions were made to deal with these transitional challenges and three key feasible solutions for the Sri Lankan construction industry regarding the EDMS were identified. Development of Sri Lankan software with low initial cost was highlighted as the most feasible solution.

Originality/value

This is a novel study to investigate the applicability of EDMS to cost management mechanisms of megaprojects in Sri Lanka. The findings reveal transitional challenges and appropriate feasible solutions for EDMS adaptation. This can be applied to the cost management of megaprojects in other developing countries as well.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 4 August 2022

Christopher Amoah and Hlatshwayo Nkosazana

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study…

5231

Abstract

Purpose

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study sought to identify effective management strategies to mitigate construction contract issues that might emerge during construction.

Design/methodology/approach

A quantitative research approach was adopted for the study. Structured questionnaires made up of close-ended questions were distributed to construction professionals in South Africa via the SurveyMonkey platform. The data were then analysed using descriptive statistics.

Findings

The findings indicate that the critical sources of contract-related disputes are ambiguous definitions of the contract parties' scope of their rights and obligations, lack of precise arrangements regarding the calculation of contractual penalties for failure to meet the deadline, lack of detailed specification of the works and specific milestones, lack of provisions regulating changes to the project documentation during the construction stage, an excessive amount of contractual penalties on contractor's side and lack of provisions regarding the rules of performing additional and replacement works and their settlement. However, for these disputes to be effectively managed, strategies such as reduction uncertainties in project's phases, setting up contingency plans, construction guarantee, extension of time claims, payment guarantee, retention and escalation clause should be implemented by the parties involved.

Research limitations/implications

Even though the empirical study focused on construction professionals in South Africa, the findings could be applied to other countries outside of South Africa.

Practical implications

To effectively manage and prevent contract disputes from averting project failures and losses to parties involved in the contract, construction professionals need to be aware of strategies that must be implemented before and during the project execution. If well implemented, these strategies will help a construction project be successful and experience fewer contractual disputes.

Originality/value

The study has identified the knowledge gap concerning suitable contract risk management strategies available for implementation to effectively prevent any contract parties from losing money, time and project failure.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

1 – 10 of over 4000