Search results

1 – 6 of 6
Open Access
Article
Publication date: 28 June 2024

Vikas Swarnakar and Malik Khalfan

This study aims to present state-of-the-art research on circular economy (CE) implementation in construction and demolition waste management (CDWM) within the construction sector.

Abstract

Purpose

This study aims to present state-of-the-art research on circular economy (CE) implementation in construction and demolition waste management (CDWM) within the construction sector.

Design/methodology/approach

A mixed-method (scientometric and critical analysis) review strategy was adopted, involving scientometric and critical analysis to uncover the evolutionary progress within the research area, investigate key research themes in the field, and explore ten issues of CE in CDWM. Moreover, avenues for future research are provided for researchers, practitioners, decision-makers, and planners to bring innovative and new knowledge to this field.

Findings

A total of 212 articles were analyzed, and scientometric analysis was performed. The critical analysis findings reveal extensive use of surveys, interviews, case studies, or mixed-method approaches as study methodologies. Furthermore, there is limited focus on the application of modern technologies, modeling approaches, decision support systems, and monitoring and traceability tools of CE in the CDWM field. Additionally, no structured framework to implement CE in CDWM areas has been found, as existing frameworks are based on traditional linear models. Moreover, none of the studies discuss readiness factors, knowledge management systems, performance measurement systems, and life cycle assessment indicators.

Practical implications

The outcomes of this study can be utilized by construction and demolition sector managers, researchers, practitioners, decision-makers, and policymakers to comprehend the state-of-the-art, explore current research topics, and gain detailed insights into future research areas. Additionally, the study offers suggestions on addressing these areas effectively.

Originality/value

This study employs a universal approach to provide the current research progress and holistic knowledge about various important issues of CE in CDWM, offering opportunities for future research directions in the area.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 4 June 2020

Soo Yong Kim, Minh V. Nguyen and Van Truong Luu

The purpose of this paper is twofold: first, to develop a performance evaluation framework for construction and demolition waste management (CDWM); second, to investigate feasible…

1339

Abstract

Purpose

The purpose of this paper is twofold: first, to develop a performance evaluation framework for construction and demolition waste management (CDWM); second, to investigate feasible and effective strategies to improve the CDWM performance.

Design/methodology/approach

A review of the literature highlighted a lack of comprehensive research to evaluate CDWM performance of key project stakeholders, like owners, contractors and consultants. After the identification of 22 performance variables through a pilot study, a first questionnaire survey was conducted to investigate the views of respondents toward CDWM performance. The 132 responses were analyzed using factor analysis to determine specific CDWM performance factors, which formed a conceptual performance evaluation framework of CDWM. Furthermore, a practical index (PI) was proposed to integrate the feasibility and effectiveness of CDWM strategies. The values of PI were employed to prioritize CDWM strategies from data collected in a second questionnaire survey.

Findings

The validated results from factor analysis revealed that the conceptual performance evaluation framework of CDWM consists of six factors; and the attitude toward CDWM emerged as the foremost critical factor. The prioritization of PI values indicated that raising CDWM awareness among construction stakeholders was the most feasible and effective strategy for CDWM.

Originality/value

This CDWM performance evaluation framework is one of the first to holistically evaluate CDWM from key stakeholder perspectives. In addition, the PI firstly enables quantitative integration of the feasibility and effectiveness of CDWM strategies.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 April 2021

Maryam Eghbali-Zarch, Reza Tavakkoli-Moghaddam, Kazem Dehghan-Sanej and Amin Kaboli

The construction industry is a key driver of economic growth. However, the adverse impacts of construction and demolition waste (CDW) resulted from the active construction

Abstract

Purpose

The construction industry is a key driver of economic growth. However, the adverse impacts of construction and demolition waste (CDW) resulted from the active construction projects on the economy, environment, public health and social life necessitates an appropriate control and management of this waste stream. Developing and promoting the construction and demolition waste management (CDWM) hierarchy program at the strategic level is essential.

Design/methodology/approach

This study aims to propose a hybrid decision model that hybridizes the Integrated Determination of Objective Criteria Weights (IDOCRIW) and weighted aggregated sum product assessment (WASPAS) under a fuzzy environment.

Findings

The proposed method ranks the potential strategic alternatives by the sustainable development criteria to improve the performance of CDWM. As indicated in the results, the fuzzy approach in the decision-making process enables the transformation of linguistic variables into fuzzy numbers that show uncertainty and ambiguity in real-world systems. Moreover, the close correlation between the final ranking of the proposed methodology and the average priority order of the strategic alternatives obtained by five different multi-criteria decision-making (MCDM) methods implies the validity of the model performance.

Practical implications

This proposed model is an appropriate tool to effectively decide on the development of CDWM from a strategic point of view. It aims to establish an MCDM framework for the evaluation of effective strategies for CDWM according to the indices of sustainable development. Implementing proper operational plans and conducting research in CDWM has the highest priority, and enacting new and more stringent laws, rules and regulations against the production of CDW has secondary priority. This study contributes to the field by optimizing the CDWM by applying the top-priority strategies resulted from the proposed fuzzy hybrid MCDM methodology by the decision-makers or policy-makers to reach the best managerial strategic plan.

Originality/value

In the proposed methodology, the IDOCRIW technique is utilized and updated with the triangular fuzzy numbers for the first time in the literature to derive the weights of sustainable development criteria. The fuzzy WASPAS method is utilized for evaluation and providing a final ranking of the strategic alternatives.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 July 2019

Ruchini Senarath Jayasinghe, Nicholas Chileshe and Raufdeen Rameezdeen

The purpose of this paper is to explore the synergies among reverse logistics supply chain (RLSC), quality management (QM) and information management (IM) concepts to enhance the…

1574

Abstract

Purpose

The purpose of this paper is to explore the synergies among reverse logistics supply chain (RLSC), quality management (QM) and information management (IM) concepts to enhance the effectiveness of demolition waste management (DWM) practices.

Design/methodology/approach

A systematic literature review was conducted using 70 articles published between the years of 2006 and 2017, which were subjected to descriptive and thematic analysis.

Findings

The descriptive analysis established that the RLSC concept was dealt within the majority of the publications (61 per cent), followed by concepts related to quality in RLSC (24 per cent). Only 14 per cent of the articles were based on IM concepts related to RLSC. Quality and information are interrelated in the effective implementation of RLSC. The thematic analysis demonstrated that there is a need for using quality parameters in a regulatory environment in an information-based environment. Based on the findings, future research directions were developed.

Research limitations/implications

The study encourages researchers to identify novel directions by combining these three concepts. The study developed a future research agenda regarding use of building information modelling (BIM) for existing buildings under novel technologies; analysis of secondary market demand and supply; and assessment of cost and safety management with quality in a BIM-enabled environment.

Practical implications

The practical implications include the application of sustainable management principles based on stakeholders and the regulatory environment.

Originality/value

Integration of the three concepts is an emerging area. This integration developed a robust approach to achieve QM in RLSC operations under a sound information flow enabling the optimisation of DWM.

Details

Benchmarking: An International Journal, vol. 26 no. 7
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 29 September 2023

Li Wang, Yanhong Lv, Tao Wang, Shuting Wan and Yanling Ye

The purpose of this research is to address the existing gap in the study of construction and demolition waste (C&DW) by focusing on its impact on human health throughout the…

Abstract

Purpose

The purpose of this research is to address the existing gap in the study of construction and demolition waste (C&DW) by focusing on its impact on human health throughout the entire life cycle. And this research provides a comprehensive assessment model that incorporates the release of gaseous pollutants and particulate matter during the whole life cycle of C&DW, thereby contributing to a more holistic understanding of its impact on human health.

Design/methodology/approach

The research was conducted in two stages. Firstly, the quantitative model framework of pollutants emitted by C&DW was established. Three types of pollutants were considered, namely nitrogen dioxide (NO2), sulfur dioxide (SO2) and inhalable particulate matter (PM10). Second, disability-adjusted life year (DALY) and willingness to pay (WTP) assessments were used to provide a monetary quantified health impact for pollutants released by C&DW.

Findings

The results show that the WTP value of PM10 is the highest among all pollutants and 8.68E+07 dollars/a, while the WTP value in the disposal stage accounts for the largest proportion compared to the generation and transportation stage. These findings emphasize the importance of PM10 and C&DW treatment stage for pollutant treatment.

Originality/value

The results of this study are of great significance for the management department to optimize the construction management scheme to reduce the total amount of pollutants produced by C&DW and its harm to human health. Meanwhile, this study fills the gap in existing research on the impact assessment of C&DW on human health throughout the whole life cycle, and provides reference and basis for future research and policy formulation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 May 2022

Ruchini Senarath Jayasinghe, Raufdeen Rameezdeen and Nicholas Chileshe

The reverse logistics supply chain (RLSC) for demolition waste management (DWM) is a complex process that inherits significant interdependent risks. However, studies on the RLSC…

Abstract

Purpose

The reverse logistics supply chain (RLSC) for demolition waste management (DWM) is a complex process that inherits significant interdependent risks. However, studies on the RLSC have not explicitly identified the risks of its inter-relationships by disentangling their effects on operational performance. Accordingly, this paper aims to identify and assess the inter-dependencies of the risks in the RLSC to improve quality-related operational performance.

Design/methodology/approach

A sequential exploratory mixed-method research approach, consisting of qualitative and quantitative methods, was employed. The qualitative approach involved 25 semi-structured interviews, whereas the 18 subsequent structured interviews were conducted with stakeholders in the entire RLSC as part of the quantitative method. These were used to identify the cause and effect relationships of the identified risks. The data were analysed using thematic analysis, and the Bayesian belief network (BBN) technique was used to develop a conceptual risk model.

Findings

In total 20 risks in four RLSC sub-processes, namely, dismantling and on-site process, off-site resource recovery process, marketing of secondary products and residue disposal, emerged. Among cause and effect relationships of identified risk factors, inferior quality of secondary products was found to have the strongest relationship with customer satisfaction. Under-pricing of dismantling job, improper landfill operations and inadequacy of landfill levy are independent risks that initiate other risks down the supply chain. The aggregate effects of these risks affect customer dissatisfaction of the end-product, as well as health and safety risks in on-site, off-site and residue disposal.

Research limitations/implications

This study only identify the cause and effect relationships of the identified risks within the RLSC for DWM operations. It has not targeted a specific construction material or any secondary production, which could be practiced through a case study in future research.

Practical implications

The results encourage the investigation of RLSC process quality by maintaining the relationship between recycler and customer to enable a safe workplace environment. Hence, the role of relevant practitioners and government is inseparable in supporting decision-making. Future research could discuss the impact of those inter-related risks in relation to time- or cost-related operational performance criteria.

Originality/value

This study contributes to the field through presenting the first major study on the identification and assessment of the inter-dependencies of the risks in the RLSC in South Australia. The RLSC process mapping had been identified as a tactical and operational management approach. However, the risk management process is a strategic management approach. Therefore, the integration of both process mapping and the risk management approaches in one platform is germane to construction management research.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 6 of 6