Search results

11 – 20 of over 1000
Article
Publication date: 11 August 2023

Charles Frommweiler and Erik Poirier

The building commissioning (BCx) phase is a critical stage in a building's lifecycle. It is also a complex process that involves a large number of actors and activities. While the…

Abstract

Purpose

The building commissioning (BCx) phase is a critical stage in a building's lifecycle. It is also a complex process that involves a large number of actors and activities. While the use of building information modeling (BIM) in the commissioning phase of building equipment and systems could be beneficial, few studies have investigated the processes behind its implementation. The research presented in this paper aims to investigate the implementation of BIM for the commissioning phase within a general contracting company through action-research.

Design/methodology/approach

Through direct involvement with the research partner, a large general contractor, a diagnosis on the current limitations of the commissioning process was conducted. An action plan to implement BIM for commissioning was developed and implemented in two pilot projects. Evaluation was performed through on-site observations and informal discussions with field staff. Learning was specified through the development of a formal protocol for BIM-enabled BCx.

Findings

This action-research project helped the partner organization identify the challenges and a way forward to formalize its BIM-enabled BCx process. The action plan aimed at countering the lack of knowledge about the status of equipment and system commissioning as well as the lack of standardization. The research team co-developed and tested a formal protocol, including BIM-enabled processes and technologies to address these observed problems. A complete implementation ecosystem was structured and deployed. Preliminary feedback indicated that improvements were obtained using a BIM-enabled approach over a traditional approach.

Originality/value

While past studies have investigated the BCx process, this study identified current challenges considering recent advances in BIM and focused on a large general contractor. This work provides an in-depth account of a large general contractor attempting to streamline its BCx process. The results of the study could help guide practitioners in implementing more streamlined BIM-enabled BCx processes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 February 2021

Eymen Cagatay Bilge and Hakan Yaman

Integrated project delivery (IPD) and building information modeling (BIM) has begun to be used in real estate development projects over the past decade to improve collaboration…

1480

Abstract

Purpose

Integrated project delivery (IPD) and building information modeling (BIM) has begun to be used in real estate development projects over the past decade to improve collaboration, communication and efficiency. However, the use of BIM and IPD in projects does not always imply that the information is well used and managed. This study aims to explain how information management should be carried out in BIM and IPD projects, what activities should be managed by the information manager and which stakeholder should play this role and why?

Design/methodology/approach

This study provides a framework on the subject by conducting a comprehensive systematic review in the field of real estate development, BIM, IPD and information management. In this context, the Web of Science and Scopus databases have been systematically reviewed, n = 45 out of a total of n = 1,356 articles and additionally, the BIM documents and standards prepared by public institutions and organizations and industry reports have been examined in detail.

Findings

The framework for information management roles was established by reviewing the literature. According to this framework, information management activities of information managers are listed in the table that covers all phases of real estate development. The owner should undertake this role as it is the entity that oversees the built asset from planning to the management of that facility.

Originality/value

In terms of acquiring information management roles, there is no research on BIM and IPD projects and who will take over this role. This study desired to close this gap in the literature.

Details

Construction Innovation , vol. 21 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 31 October 2023

Chukwuka Christian Ohueri, San Chuin Liew, Jibril Adewale Bamgbade and Wallace Imoudu Enegbuma

The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to…

Abstract

Purpose

The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to significantly enhance multidiscipline team collaboration. However, the practical execution of green BIM is characterized by issues such as duplication of work, information silos and poor cross-party coordination. Besides, there are limited studies on the specific components that are critical to driving green BIM collaborative design. This study aims to establish the critical components of green BIM collaborative design to enable the multidiscipline team to effectively use diverse software to collaboratively exchange accurate information, thus ensuring informed decision-making in the sustainable building design process.

Design/methodology/approach

Data were obtained by using a questionnaire to survey 360 respondents comprising mainly architects and engineers (civil, mechanical and electrical) in Malaysia. Subsequently, data were analyzed via confirmatory factor analysis. Afterward, a measurement model was established and used to test the 11 hypotheses of this study.

Findings

A covariance-based structural equation model of the critical components for successful BIM-based sustainable building design collaboration was established.

Practical implications

The research findings will guide the multidisciplinary team to collaboratively exchange accurate information in green BIM practices.

Originality/value

To the best of the authors’ knowledge, this research is the first attempt in the literature to provide a pragmatic approach for practitioners to combine the established critical components of green BIM to collaboratively exchange heterogeneous sustainability criteria and efficiently design buildings with high sustainability performance, particularly in emerging countries like Malaysia.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 26 December 2023

Dat Tien Doan, Ali Ghaffarianhoseini, Nicola Naismith, Amirhosein Ghaffarianhoseini and John Tookey

In New Zealand, building information modelling (BIM) prevalence is still in its early stages and faces many challenges. This research aims to develop a BIM adoption framework to…

Abstract

Purpose

In New Zealand, building information modelling (BIM) prevalence is still in its early stages and faces many challenges. This research aims to develop a BIM adoption framework to determine the key factors affecting the success of a BIM project.

Design/methodology/approach

Both primary and secondary data were employed in this research, including 21 semi-structured interviews and industry guidelines from the three most well-known global building excellence models (BEMs). The data were analysed through content analysis due to its recognised benefits as a transparent and reliable approach.

Findings

Leadership, clients and other stakeholders, strategic planning, people, resources, process and results were identified as seven main categories along with 39 indicators in the BIM adoption framework. Based on the interviewees' perspectives, leadership is considered the most significant category, impacting all of the remaining categories.

Practical implications

Using the developed framework will enhance comprehension of BIM, offering directives for those embracing BIM. This will aid construction stakeholders in being better equipped for BIM projects. Having a skilled BIM manager can lead to the success of construction projects.

Originality/value

This research contributed to the existing body of knowledge by providing the categories with specific factors that assist BIM practitioners in assessing their BIM performance for further BIM practice improvement.

Article
Publication date: 9 August 2018

Ozan Koseoglu, Mehmet Sakin and Yusuf Arayici

The purpose of this paper is to develop a solid understanding of how integrated building information modeling (BIM) is implemented in a mega project such as the (Istanbul Grand…

2567

Abstract

Purpose

The purpose of this paper is to develop a solid understanding of how integrated building information modeling (BIM) is implemented in a mega project such as the (Istanbul Grand Airport IGA) construction project, which is the main case study in the research methodology.

Design/methodology/approach

The paper examines and identifies the lean efficiency gains achieved in the IGA project and highlights the synergies between BIM and lean concepts based on the facts and figures from the case study analysis. In complex projects, there is a vital need for a comprehensive approach that would enable successful managing of design and construction information via accurate modeling, collaboration and integration throughout the project lifecycles covering various disciplines.

Findings

The research findings in the paper make a significant impact in understanding the strategic perception for BIM as a new way of working methodology for the construction industry in Turkey, since the IGA project has become not only a key learning hub for the Turkish construction industry, but also a global landmark for digital construction and project delivery. In addition it proves the mutual synergies between BIM and lean practices.

Originality/value

The IGA project is a mega-scale airport construction project with features beyond building industry challenges, and it should be designed and constructed with tight deadlines and budgets and be operated afterwards in an effective and efficient way. Can lean and BIM help for timely and on-budget completion of the project and could they support the management of the airport facility after handover? The paper also discusses the lean and BIM implementation in the project in relation to the BIM Level 3 requirements.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 January 2017

Kathryn Davies, Dermott J. McMeel and Suzanne Wilkinson

Although the potential of Building Information Modelling (BIM) to generate process and performance improvement in the construction industry has been widely documented, very few…

1113

Abstract

Purpose

Although the potential of Building Information Modelling (BIM) to generate process and performance improvement in the construction industry has been widely documented, very few projects operate in a wholly BIM environment. The purpose of this paper is to explore the factors that lead to hybrid practice in BIM across disciplines or project stages, and accommodations that must be reached within BIM project frameworks to allow for it.

Design/methodology/approach

In-depth semi-structured interviews were carried out with 38 BIM specialists from Australia and New Zealand, representing a variety of construction industry disciplines and roles. Data on current practice and experiences in BIM were analysed using a thematic approach within a qualitative framework.

Findings

Hybrid BIM practice is shown to be a common experience for practitioners in New Zealand and Australia. It is presented as a valid model of BIM adoption; both as a development stage in the process towards more complete BIM implementation, and also as an adoption model in its own right.

Research limitations/implications

The paper is based on data from New Zealand and Australia, which are currently developing BIM markets. Although surveys have demonstrated many similarities in BIM adoption processes internationally, results may be less applicable to more mature markets.

Practical implications

The paper suggests that instead of regarding hybrid BIM negatively as an unsuccessful implementation, companies should seek to identify and manage the causes and effects of hybridisation in order to improve project outcomes.

Originality/value

This paper addresses the management of transitional stages of BIM implementation, which is often overlooked in research.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 April 2021

Mehran Oraee, M. Reza Hosseini, David Edwards and Eleni Papadonikolaki

The purpose of this paper is to present a modified model for collaboration in BIM-based construction networks (BbCNs). Though BIM is increasingly adopted and implemented across…

1381

Abstract

Purpose

The purpose of this paper is to present a modified model for collaboration in BIM-based construction networks (BbCNs). Though BIM is increasingly adopted and implemented across the construction industry, the problems associated with the lack of collaboration among teams in BbCNs remain a major hindrance to reaping the full potential of BIM. Previous studies have been conceptual in nature. This paper, therefore, attempts to modify and validate existing conceptual models that describe collaboration in BbCNs.

Design/methodology/approach

To modify the conceptual model for collaboration in BbCNs, qualitative data through semi-structured interviews with BIM experts in the industry were collected and analysed using qualitative methods including the use of NVivo software.

Findings

The proposed model includes influential factors and their sub-factors to collaboration in BbCNs, as well as considering their indicators. Findings reveal that several overlooked concepts, particularly unfavourable BIM contractual arrangements, act as the root causes of the unwillingness of team members in BbCNs to engage in collaborative efforts.

Research limitations/implications

The study's findings must be viewed in light of several limitations. First, the interviewees in this study were based in Australia hence their perceptions of BIM collaboration are reflective of the sociotechnical setting of BIM-enabled projects in this country. Also, the findings are based on the perception of experts in the field, rather than analysis of performance measures or quantitative assessment of associations among collaboration outcomes and various factors. This, however, provides the field with fertile grounds for future research.

Practical implications

The study benefits researchers by shifting the collaboration discourse in BIM-enabled projects from technology-related issues to the people and contractual-related domains. Moreover, the developed qualitative model provides industry professionals with a point of reference to improve collaboration on BIM-enabled projects.

Social implications

The study benefits researchers by shifting the collaboration discourse in BIM-enabled projects from technology-related issues to the people and contractual-related domains. Moreover, the developed qualitative model provides industry professionals with a point of reference to improve collaboration on BIM-enabled projects.

Originality/value

Arguments provided in this study highlight the necessity of considering the contractual arrangement of BIM-related projects and foster the willingness of team members to collaborate. This can be addressed using clear and comprehensive BIM execution plans and clearly explaining the role of BIM managers in the process.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 February 2020

Jingfeng Yuan, Xuewei Li, Yongjian Ke, Wei Xu, Zhao Xu and M. Skibnewski

Effective performance management (PM) in public–private partnership (PPP) projects is critical to realizing value for money (VFM). This study aims to provide an in-depth…

1016

Abstract

Purpose

Effective performance management (PM) in public–private partnership (PPP) projects is critical to realizing value for money (VFM). This study aims to provide an in-depth understanding of problems existing in PPP PM and possible avenues for improvement, presenting an experimental system to verify that building information modeling (BIM) and other information communication technologies can improve PPP PM.

Design/methodology/approach

The mixed research method adopted in this study combined empirical research with experimental research. Semistructured interviews were used to ascertain the current situation of PPP PM with the help of Nvivo software. A BIM-based performance management system (BPMS), which combines BIM with Web and Cloud technology, was then constructed to achieve performance monitoring, performance measurement, and performance-based payment. Finally, a case study was introduced to explain the function application of the proposed system.

Findings

The case demonstration verified is found to verify that the developed BIM-based execution framework for PPP PM can effectively guide stakeholders toward achieving mixed PM, promote effective PM, and improve work efficiency with the support of BIM and other information and communication technologies.

Originality/value

Through the development of a BPMS for PPP projects, the effectiveness and efficiency of PM are improved. Practical PM applications are also provided to different stakeholders, through which the key performance indicators and the behaviors of the government and private-sector partners can be monitored to form a more comprehensive and reasonable PM mechanism and promote the realization of VFM in PPP projects.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 May 2022

Mustafa Onur Savaşkan and Ozan Önder Özener

This article presents a case study on the Heritage Building Information Modeling (H-BIM) application in a historic village in Bursa, Turkey. The study addresses how tailor-made…

Abstract

Purpose

This article presents a case study on the Heritage Building Information Modeling (H-BIM) application in a historic village in Bursa, Turkey. The study addresses how tailor-made and highly structured H-BIM approaches can effectively be implemented in preservation applications for historic vernacular buildings in the rural architecture context.

Design/methodology/approach

Using inexpensive digital photogrammetry techniques tightly combined with an object-oriented BIM ontology, parametric meta-modeling and object/system propagation methods, the study employed a holistic H-BIM approach for capturing the materiality, building object behaviors and indigenous construction principles of a characteristic vernacular house that were synthesized in a parametric H-BIM model. The followed stages, steps and connected methods were systematized and articulated in a prototypical H-BIM implementation framework.

Findings

The study findings suggested that the developed parametric H-BIM approach can return effective results with the combined use of low-cost and practical digital photogrammetry with BIM methods. The flexibility and adaptability of the parametric H-BIM implementation framework facilitated the synthesis of a comprehensive H-BIM model and allowed an in-depth evaluation of local architectural heritage with its physical, spatial and environmental characteristics. The proposed H-BIM approach also provided significant documentation and system-specific assessment benefits for preserving the vernacular examples which are prone to extinction especially due to structural and systemic deterioration.

Originality/value

The study proposes a feasible, practical and replicable H-BIM implementation methodology for vernacular preservation applications. The knowledge-embedded H-BIM approach, flows and techniques presented in this study provide a holistic and systematic H-BIM framework – with the integrated use of digital photogrammetry and parametric meta-modeling methods – that has the potential for the democratization of H-BIM applications in education and practice.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 May 2019

Timothy Oluwatosin Olawumi and Daniel W.M. Chan

The increasing urbanization of the built environment has bolstered the need to promote green Building Information Modeling (BIM) initiative in new construction projects and the…

1567

Abstract

Purpose

The increasing urbanization of the built environment has bolstered the need to promote green Building Information Modeling (BIM) initiative in new construction projects and the rehabilitation of old premises. This study aims to explore and examine the key benefits of the implementation of BIM and sustainability practices in the built environment.

Design/methodology/approach

The study gathered the worldwide perceptions of 220 survey participants from 21 countries which were analyzed using descriptive and inferential analytical methods. The identified individual benefits of green BIM were further categorized into their underlying clusters using factor analysis.

Findings

The key benefits are related to enhancing project efficiency and productivity, ensuring real-time sustainable design and multi-design alternatives, facilitating the selection of sustainable materials and components, together with reducing material wastage and project’s environmental impact, among others. The study analyzed and compared the perceptions of the diverse groups of the respondents as well.

Practical implications

Effective blueprints and insightful recommendations for enhancing the various stakeholders’ capacities to implement green BIM in their construction projects were put forward to achieve the aim of sustainable smart urbanization.

Originality/value

The study identified salient benefits of the adoption of BIM and sustainability practices. The proper integration of these concepts and the execution of the recommended useful strategies by construction stakeholders, policymakers and local authorities will enable the built environment to reap the gains of its implementation.

Details

Construction Innovation, vol. 19 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

11 – 20 of over 1000