1 – 8 of 8Thayla Zomer, Andy Neely and Paulo Savaget
How organisations interact with and respond to environmental pressures has been a long-term interest of organisational scholars. Still, it remains an under-theorised phenomenon…
Abstract
Purpose
How organisations interact with and respond to environmental pressures has been a long-term interest of organisational scholars. Still, it remains an under-theorised phenomenon from a project perspective. So far, there is limited understanding of how projects, which are composed by a constellation of organisations, “respond” to institutional pressures that are exerted on them. This research takes the perspective of projects as adopters/implementers of institutional pressures and analyses how they interact with, and respond to, such pressures. More specifically, this research explores how construction projects respond to the pressure of a Building Information Modelling (BIM) mandate.
Design/methodology/approach
Multiple in-depth case studies were conducted to explore the practical implementation of a BIM mandate in the UK and understand how the construction projects responded to the coercive pressures to implement a new policy mandate for process digitalisation. Multiple sources were employed for data collection and the data were analysed inductively. The findings identify a hybrid response comprising four distinct ways that projects might respond to an institutional pressure.
Findings
We find that projects decouple both from the content and from the intended purpose of a policy, i.e. there are two variance of a policy-practice decoupling phenomenon in projects. The findings also reveal the underlying conditions leading to decoupling.
Originality/value
We advance decoupling literature so that it better applies to the temporary, distributed and interdependent work conducted via projects. Second, we define decoupling in projects as a provisional and fragmented process of wayfinding through heterogeneous institutional spaces, and discuss the potential policy-practice assemblages in projects, influenced by how, if and when project members' activities decouple from the many and often contradicting institutional pressures they face. Third, we discuss how the qualitatively different forms of decoupling that we identified in our work may act as part of a legitimation process in ambiguous situations whereby projects might share a resemblance of conformity with institutional pressures when they are de facto only partially conforming to them.
Details
Keywords
Lama Abu Alieh, M. Reza Hosseini, Igor Martek, Wei Wu and Mehrdad Arashpour
A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction…
Abstract
Purpose
A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction industry. In response, Australian universities have tried to integrate the teaching of BIM into construction-related curricula, but with limited success. The acknowledged impediment is the lingering mismatch between what universities offer and what industry actually needs. However, the exact nature of that mismatch has yet to be identified. This study addresses that knowledge gap. It assesses both the current status of BIM competencies among university graduates and explores how BIM education at Australian universities may be improved to deliver BIM work readiness, as required by the industry.
Design/methodology/approach
This paper employed a qualitative research approach, utilizing 17 semi-structured interviews with experts in the Australian BIM industry. The Person-Organization (PO) fit theory, which emphasizes the congruence between individual and organizational characteristics, was utilized as a theoretical framework to examine the compatibility between “demand” and “ability” perspectives. The resulting data were analysed using this theoretical framework to gain insights into the PO fit perspectives in relation to BIM industry practices.
Findings
Findings reveal that graduates are generally competent regarding the use of BIM software. However, employers require much more than software skills, and expect recruits to have the capability to implement BIM as a process according to information management standards. Specifically, graduates are significantly deficient in matters of BIM protocols, collaboration and coordination, information workflows as well as completion and handover procedures.
Originality/value
This study is the first of its kind that bridges the gap between industry expectations and university education, in the Australian context, moving beyond the common discourse in education literature, which is exclusively focused on assessing students’ perceptions about BIM.
Details
Keywords
Maria Unuigbe and Sambo Lyson Zulu
The UK Government has committed to achieving net-zero emissions by 2050, being the first major nation to do so. While laudable, it raises the question, “are future built…
Abstract
Purpose
The UK Government has committed to achieving net-zero emissions by 2050, being the first major nation to do so. While laudable, it raises the question, “are future built environment professionals (BEPs) equipped for this?” Although studies related to students’ perspectives exist, they broadly focus on sustainability-related pedagogical aspects, with limited studies conducted in the built environment (BE). This study makes the case that it is timely to investigate this from an emerging perspective using the term “low-carbon future” (LCF), given that it is germane to achieving net-zero emissions and is at the forefront of academic and practice discourse. Therefore, this paper aims to investigate the knowledge level of UK BE students’ in higher education institutions (HEIs) specific to the term LCF.
Design/methodology/approach
This is a systematic scoping study review of published papers related to sustainability in BE curricula in the UK HEI context.
Findings
The findings reveal that LCF remains at a nascent stage, with no study specifically addressing it. It indicates a knowledge gap that could impact the grounding students require to address current and future sustainability challenges.
Research limitations/implications
The review focused on a specific term, which, while relevant, is very niche. A review of other emerging terms, considering LCF as a theme, and/or empirical data from diverse stakeholders in UK HEIs could enrich the results.
Practical implications
This study provides significant insight into the status of sustainability inclusion in the BE curriculum. It would serve as a reference for stakeholders involved in equipping future BEPs with the requisite knowledge and skills to deal with sustainability challenges that will be consequential beyond the UK context. It would also inform future research.
Social implications
Sustainability-informed and equipped BEPs will be influential in shaping their immediate surroundings and how people engage with them, which will contribute to developing a more equitable and sustainable society.
Originality/value
Beyond contributing to the discourse on sustainability literacy in UK HEI from an emerging concept perspective, this study would be useful as possibly the first of its kind. Therefore, it fills the theoretical gap and proffers recommendations that would be beneficial for curriculum development.
Details
Keywords
This study aims to explore the opinions of Built Environment Professionals (BEP) on the usage of fourth-generation digital technologies in the construction industry.
Abstract
Purpose
This study aims to explore the opinions of Built Environment Professionals (BEP) on the usage of fourth-generation digital technologies in the construction industry.
Design/methodology/approach
This study adopts a qualitative research approach and conducts semi-structured interviews with Black, Asian and Minority Ethnic (BAME) professionals to explore the adoption and utilisation of fourth-generation digital technologies in the construction industry. The semi-structured interviews allowed the participants to elaborate on their experiences, and thematic analysis was employed to identify and analyse significant themes related to the topic.
Findings
Accounts from BAME construction professionals reveal that the increased popularity of fourth-generation digital technologies, also known as Industry 4.0 technologies, does not necessarily result in increased usage. This is because many of these new technologies have not been embraced and are unpopular in certain circles. A more significant revelation is the impact of BAME community settings on determining the career pathways of most individuals, which often do not support the construction or digital technology pathways within the construction industry.
Research limitations/implications
Research targeting ethnic minorities may not necessarily yield a large response due to the sensitivity of the issues raised. However, conducting a nationwide research with a larger sample size drawn from various locations in the UK could achieve more robust findings and uncover additional issues. Meanwhile, the results of this research can serve as a framework for more extensive investigations.
Practical implications
The research offers valuable recommendations to industry and academia regarding the need to address the specific challenges faced by the BAME community in terms of digital technology adoption. These issues are often overlooked in most discussions about digital technology.
Originality/value
The study provides critical recommendations that are relevant to Further and Higher Education (HE) institutions, industries, construction organisations, government bodies, etc. Recommendations include a call for collaboration between educational institutions, industry partners and local communities to facilitate awareness and orientation programmes within the community.
Details
Keywords
Sara Rashidian, Robin Drogemuller, Sara Omrani and Fereshteh Banakar
The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving…
Abstract
Purpose
The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving collaboration and delivering construction projects has been acknowledged by construction academics and professionals. Once organizations have fully embraced BIM, IPD and LC integration, a measurement tool such as a maturity model (MM) for benchmarking their progress and setting realistic goals for continuous improvement will be required. In the context of MMs literature, however, no comprehensive analysis of these three construction management methods has been published to reveal the current trends and common themes in which the models have approached each other.
Design/methodology/approach
Therefore, this study integrates systematic literature review (SLR) and thematic analysis techniques to review and categorize the related MMs; the key themes in which the interrelationship between BIM, IPD and LC MMs has been discussed and conceptualized in the attributes; the shared characteristics of the existing BIM, IPD and LC MMs, as well as their strengths and limitations. The Preferred Reporting Items for Systematic Reviews (PRISMA) method has been used as the primary procedure for article screening and reviewing published papers between 2007 and 2022.
Findings
Despite the growth of BIM, IPD and LC integration publications and acknowledgment in the literature, no MM has been established that holistically measures BIM, IPD and LC integration in an organization. This study identifies five interrelated and overlapping themes indicative of the collaboration of BIM, IPD and LC in existing MMs' structure, including customer satisfaction, waste minimization, Lean practices and cultural and legal aspects. Furthermore, the MMs' common characteristics, strengths and limitations are evaluated to provide a foundation for developing future BIM, IPD and LC-related MMs.
Practical implications
This paper examines the current status of research and the knowledge gaps around BIM, IPD and LC MMs. In addition, the highlighted major themes serve as a foundation for academics who intend to develop integrated BIM, IPD, and LC MMs. This will enable researchers to build upon these themes and establish a comprehensive list of maturity attributes fulfilling the BIM, IPD and LC requirements and principles. In addition, the MMs' BIM, IPD and LC compatibility themes, which go beyond themes' intended characteristics in silos, increase industry practitioners' awareness of the underlying factors of BIM, IPD and LC integration.
Originality/value
This review article is the first of a kind to analyze the interaction of IPD, BIM and LC in the context of MMs in current AEC literature. This study concludes that BIM, IPD and LC share several joint cornerstones according to the existing MMs.
Details
Keywords
Ashutosh Dash and Rahul Pramani
The primary objectives of the case study are to get the participants exposed to the issues of working capital which even profitable companies face on a day-to-day basis; give the…
Abstract
Learning outcomes
The primary objectives of the case study are to get the participants exposed to the issues of working capital which even profitable companies face on a day-to-day basis; give the participants an understanding of how to balance the, at times, conflicting objectives of increasing profits and sales through favorable credit terms; and expose them to the impact of increase in inventory levels and average collection period on margins in a period of slow growth. They will also learn about the concept of factoring and its uses.
Case overview/synopsis
The case study is about a group of companies engaged in education, steel fabrication and oil businesses owned by a single proprietor. The company was based in Fatehnagar which was part of Hyderabad district in the state of Telangana, India, and the case study traces the origins of the group from 1960s to 2021. The group was invested the surplus cash flows from the oil business to initiate and expand other businesses during this period. The economic downturn due to the COVID-19 pandemic had hit the company, particularly its oldest business – Noble Chemical Agency. The oil business was facing issues related to its growth and profitability, and the uncertainty around COVID-19-related restrictions had only augmented the fears of the management. The case study looks at issues and the dilemma which the owner of the company faced. The case study highlights various issues related to working capital management, especially related to receivables management and inventory levels faced by businesses during the slow-growth phase. It demonstrates how working capital management issues, if not resolved in time, can lead to insolvency of even a successful company with a sound business model.
Complexity academic level
The case study is meant for teaching in postgraduate management programs (Master of Business Administration and Postgraduate Diploma in Management) in the following courses: corporate finance/financial management course in the first year (the case study should be taught towards the end of the course); and management accounting courses in first year (the case study should be positioned in the middle of these courses). The case study can also be used to highlight issues related to working capital and small business management in a Management Development Programme (MDP) course for “Finance fundamentals for non-finance executives”.
Supplementary materials
Teaching notes are available for educators only.
Subject code
CSS 1: Accounting and finance.
Details
Keywords
Henrik Gislason, Jørgen Hvid, Steffen Gøth, Per Rønne-Nielsen and Christian Hallum
An increasing number of Danish municipalities wish to minimize tax avoidance due to profit shifting in their public procurement. To facilitate this effort, this study aims to…
Abstract
Purpose
An increasing number of Danish municipalities wish to minimize tax avoidance due to profit shifting in their public procurement. To facilitate this effort, this study aims to develop a firm-level indicator to assess the potential risk of profit shifting (PS-risk) from Danish subsidiaries of multinational corporations to subsidiaries in low-tax jurisdictions.
Design/methodology/approach
Drawing from previous research, PS-risk is assumed to depend on the maximum difference in the effective corporate tax rate between the Danish subsidiary and other subsidiaries under the global ultimate owner, in conjunction with the tax regulations relevant to profit shifting. The top 400 contractors in Danish municipalities from 2017 to 2019 are identified and their relative PS-risk is estimated by combining information about corporate ownership structure with country-specific information on corporate tax rates, tax regulations and profit shifting from three independent data sets.
Findings
The PS-risk estimates are highly significantly positively correlated across the data sets and show that 17%–23% of the total procurement sum of the Danish municipalities has been spent on contracts with corporations having a medium to high PS-risk. On average, PS-risk is highest for large non-Scandinavian multinational contractors in sectors such as construction, health and information processing.
Social implications
Danish public procurers may use the indicator to screen potential suppliers and, if procurement regulations permit, to ensure high-PS-risk bidders document their tax practices.
Originality/value
The PS-risk indicator is novel, and to the best of the authors’ knowledge, the analysis provides the first estimate of PS-risk in Danish public procurement.