Search results

1 – 10 of 402
Open Access
Article
Publication date: 7 April 2015

Yujun Cao, Xin Li, Zhixiong Zhang and Jianzhong Shang

This paper aims to clarify the predicting and compensating method of aeroplane assembly. It proposes modeling the process of assembly. The paper aims to solve the precision…

1519

Abstract

Purpose

This paper aims to clarify the predicting and compensating method of aeroplane assembly. It proposes modeling the process of assembly. The paper aims to solve the precision assembly of aeroplane, which includes predicting the assembly variation and compensating the assembly errors.

Design/methodology/approach

The paper opted for an exploratory study using the state space theory and small displacement torsor theory. The assembly variation propagation model is established. The experiment data are obtained by a real small aeroplane assembly process.

Findings

The paper provides the predicting and compensating method for aeroplane assembly accuracy.

Originality/value

This paper fulfils an identified need to study how the assembly variation propagates in the assembly process.

Details

Assembly Automation, vol. 35 no. 2
Type: Research Article
ISSN: 0144-5154

Keywords

Open Access
Article
Publication date: 11 February 2019

Peter Burggraef, Johannes Wagner, Matthias Dannapfel and Sebastian Patrick Vierschilling

The purpose of this paper is to investigate the benefit of pre-emptive disruption management measures for assembly systems towards the target dimension adherence to delivery times.

2496

Abstract

Purpose

The purpose of this paper is to investigate the benefit of pre-emptive disruption management measures for assembly systems towards the target dimension adherence to delivery times.

Design/methodology/approach

The research was conducted by creating simulation models for typical assembly systems and measuring its varying throughput times due to changes in their disruption profiles. Due to the variability of assembly systems, key influence factors were investigated and used as a foundation for the simulation setup. Additionally, a disruption profile for each simulated process was developed, using the established disruption categories material, information and capacity. The categories are described by statistical distributions, defining the interval between the disruptions and the disruption duration. By a statistical experiment plan, the effect of a reduced disruption potential onto the throughput time was investigated.

Findings

Pre-emptive disruption management is beneficial, but its benefit depends on the operated assembly system and its organisation form, such as line or group assembly. Measures have on average a higher beneficial impact on group assemblies than on line assemblies. Furthermore, it was proven that the benefit, in form of better adherence to delivery times, per reduced disruption potential has a declining character and approximates a distinct maximum.

Originality/value

Characterising the benefit of pre-emptive disruption management measures enables managers to use this concept in their daily production to minimise overall costs. Despite the hardly predictable influence of pre-emptive disruption measures, these research results can be implemented into a heuristic for efficiently choosing these measures.

Details

Journal of Modelling in Management, vol. 14 no. 1
Type: Research Article
ISSN: 1746-5664

Keywords

Open Access
Book part
Publication date: 1 May 2019

Djordje Popovic and Carin Rösiö

The purpose of the study was to investigate the alignment between current product and manufacturing systems and how it could be achieved.

Abstract

Purpose

The purpose of the study was to investigate the alignment between current product and manufacturing systems and how it could be achieved.

Design/Methodology/Approach

Case study research method was chosen for the collection and analysis of empirical data. The data was of qualitative nature and was collected using research techniques such as observations through video recordings of processes, documents and open and semi-structured interviews.

Findings

The variation of outer side sub-element of the exterior wall element was found to not be aligned with its corresponding assembly. A hybrid assembly of outer side sub-elements characterised by flexibility and reconfigurability can be developed.

Research Limitations/Implications

The study is limited to the exterior wall element and corresponding manufacturing system.

Practical Implications

The presented approach was formulated with the aim to be used both for the analysis of existing products and manufacturing systems as well as for the design of new manufacturing systems.

Originality/Value

So far, this is the first study in the context of timber house building where the alignment between product and manufacturing systems was investigated by considering product variety and flexibility of manufacturing systems.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 30 September 2022

Ye Shen, Bo Li, Wei Tian, Jinjun Duan and Mingxuan Liu

With the increasing requirements for intelligence in the field of aviation manufacturing, manual assembly can hardly adapt to the trend of future production. The purpose of this…

Abstract

Purpose

With the increasing requirements for intelligence in the field of aviation manufacturing, manual assembly can hardly adapt to the trend of future production. The purpose of this study is to realize the semi-automatic assembly of the movable airfoil by proposing a human-robot collaborative assembly strategy based on adaptive admittance control.

Design/methodology/approach

A logical judgment system for operating intentions is introduced in terms of different situations of the movements; hence, a human cognition-based adaptive admittance control method is developed to curb the damage of inertia; then virtual limit walls are raised on the periphery of the control model to ensure safety; finally, simulated and experimental comparisons with other admittance control methods are conducted to validate the proposed method.

Findings

The proposed method can save at least 28.8% of the time in the stopping phase which effectively compensates for inertia during the assembly process and has high robustness concerning data disturbances.

Originality/value

Due to the human-robot collaboration to achieve compliant assembly of movable airfoils can preserve human subjectivity while overcoming the physical limits of humans, which is of great significance to the investigation of intelligent aircraft assembly, the proposed method that reflects the user's naturalness and intuitiveness can not only enhance the stability and the flexibility of the manipulation, but also contribute to applications of industrial robots in the field of human-robot collaboration.

Details

Journal of Intelligent Manufacturing and Special Equipment, vol. 3 no. 2
Type: Research Article
ISSN: 2633-6596

Keywords

Open Access
Article
Publication date: 12 January 2024

Patrik Jonsson, Johan Öhlin, Hafez Shurrab, Johan Bystedt, Azam Sheikh Muhammad and Vilhelm Verendel

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

1533

Abstract

Purpose

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Design/methodology/approach

A mixed-method case approach is applied. Explanatory variables are identified from the literature and explored in a qualitative analysis at an automotive original equipment manufacturer. Using logistic regression and random forest classification models, quantitative data (historical schedule transactions and internal data) enables the testing of the predictive difference of variables under various planning horizons and inaccuracy levels.

Findings

The effects on delivery schedule inaccuracies are contingent on a decoupling point, and a variable may have a combined amplifying (complexity generating) and stabilizing (complexity absorbing) moderating effect. Product complexity variables are significant regardless of the time horizon, and the item’s order life cycle is a significant variable with predictive differences that vary. Decoupling management is identified as a mechanism for generating complexity absorption capabilities contributing to delivery schedule accuracy.

Practical implications

The findings provide guidelines for exploring and finding patterns in specific variables to improve material delivery schedule inaccuracies and input into predictive forecasting models.

Originality/value

The findings contribute to explaining material delivery schedule variations, identifying potential root causes and moderators, empirically testing and validating effects and conceptualizing features that cause and moderate inaccuracies in relation to decoupling management and complexity theory literature?

Details

International Journal of Operations & Production Management, vol. 44 no. 13
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 17 June 2019

Stephen Fox, Olli Aranko, Juhani Heilala and Päivi Vahala

Exoskeletons are mechanical structures that humans can wear to increase their strength and endurance. The purpose of this paper is to explain how exoskeletons can be used to…

19257

Abstract

Purpose

Exoskeletons are mechanical structures that humans can wear to increase their strength and endurance. The purpose of this paper is to explain how exoskeletons can be used to improve performance across five phases of manufacturing.

Design/methodology/approach

Multivocal literature review, encompassing scientific literature and the grey literature of online reports, etc., to inform comprehensive, comparative and critical analyses of the potential of exoskeletons to improve manufacturing performance.

Findings

There are at least eight different types of exoskeletons that can be used to improve human strength and endurance in manual work during different phases of production. However, exoskeletons can have the unintended negative consequence of reducing human flexibility leading to new sources of musculoskeletal disorders (MSD) and accidents.

Research limitations/implications

Findings are relevant to function allocation research concerned with manual production work. In particular, exoskeletons could exacerbate the traditional trade-off between human flexibility and robot consistency by making human workers less flexible.

Practical implications

The introduction of exoskeletons requires careful health and safety planning if exoskeletons are to improve human strength and endurance without introducing new sources of MSD and accidents.

Originality/value

The originality of this paper is that it provides detailed information about a new manufacturing technology: exoskeletons. The value of this paper is that it provides information that is comprehensive, comparative and critical about exoskeletons as a potential alternative to robotics across five phases of manufacturing.

Details

Journal of Manufacturing Technology Management, vol. 31 no. 6
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 8 August 2023

Elisa Verna, Gianfranco Genta and Maurizio Galetto

The purpose of this paper is to investigate and quantify the impact of product complexity, including architectural complexity, on operator learning, productivity and quality…

Abstract

Purpose

The purpose of this paper is to investigate and quantify the impact of product complexity, including architectural complexity, on operator learning, productivity and quality performance in both assembly and disassembly operations. This topic has not been extensively investigated in previous research.

Design/methodology/approach

An extensive experimental campaign involving 84 operators was conducted to repeatedly assemble and disassemble six different products of varying complexity to construct productivity and quality learning curves. Data from the experiment were analysed using statistical methods.

Findings

The human learning factor of productivity increases superlinearly with the increasing architectural complexity of products, i.e. from centralised to distributed architectures, both in assembly and disassembly, regardless of the level of overall product complexity. On the other hand, the human learning factor of quality performance decreases superlinearly as the architectural complexity of products increases. The intrinsic characteristics of product architecture are the reasons for this difference in learning factor.

Practical implications

The results of the study suggest that considering product complexity, particularly architectural complexity, in the design and planning of manufacturing processes can optimise operator learning, productivity and quality performance, and inform decisions about improving manufacturing operations.

Originality/value

While previous research has focussed on the effects of complexity on process time and defect generation, this study is amongst the first to investigate and quantify the effects of product complexity, including architectural complexity, on operator learning using an extensive experimental campaign.

Details

Journal of Manufacturing Technology Management, vol. 34 no. 9
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 7 December 2022

Milad Shabanian and Nicole Leo Braxtan

Thermomechanical behavior of intermediate-size beam-to-wall assemblies including Glulam-beams connected to cross-laminated timber (CLT) walls with T-shape steel doweled…

Abstract

Purpose

Thermomechanical behavior of intermediate-size beam-to-wall assemblies including Glulam-beams connected to cross-laminated timber (CLT) walls with T-shape steel doweled connections was investigated at ambient temperature (AT) and after and during non-standard fire exposure.

Design/methodology/approach

Three AT tests were conducted to evaluate the load-carrying capacity and failure modes of the assembly at room temperature. Two post-fire performance (PFP) tests were performed to study the impact of 30-min (PFP30) and 60-min (PFP60) partial exposure to a non-standard fire on the residual strength of the assemblies. The assemblies were exposed to fire in a custom-designed frame, then cooled and loaded to failure. A fire performance (FP) test was conducted to study the fire resistance (FR) during non-standard fire exposure by simultaneously applying fire and a mechanical load equal to 65% of the AT load carrying capacity.

Findings

At AT, embedment failure of the dowels followed by splitting failure at the Glulam-beam and tensile failure of the epoxy between the layers of CLT-walls were the dominant failure modes. In both PFP tests, the plastic bending of the dowels was the only observed failure mode. The residual strength of the assembly was reduced 14% after 30 min and 37% after 60 min of fire exposure. During the FP test, embedment failure of timber in contact with the dowels was the only major failure mode, with the maximum rate of displacement at 51 min into the fire exposure.

Originality/value

This is the first time that the thermomechanical performance of such an assembly with a full-contact connection is presented.

Details

Journal of Structural Fire Engineering, vol. 14 no. 3
Type: Research Article
ISSN: 2040-2317

Keywords

Open Access
Article
Publication date: 25 April 2024

Ilse Valenzuela Matus, Jorge Lino Alves, Joaquim Góis, Paulo Vaz-Pires and Augusto Barata da Rocha

The purpose of this paper is to review cases of artificial reefs built through additive manufacturing (AM) technologies and analyse their ecological goals, fabrication process…

1393

Abstract

Purpose

The purpose of this paper is to review cases of artificial reefs built through additive manufacturing (AM) technologies and analyse their ecological goals, fabrication process, materials, structural design features and implementation location to determine predominant parameters, environmental impacts, advantages, and limitations.

Design/methodology/approach

The review analysed 16 cases of artificial reefs from both temperate and tropical regions. These were categorised based on the AM process used, the mortar material used (crucial for biological applications), the structural design features and the location of implementation. These parameters are assessed to determine how effectively the designs meet the stipulated ecological goals, how AM technologies demonstrate their potential in comparison to conventional methods and the preference locations of these implementations.

Findings

The overview revealed that the dominant artificial reef implementation occurs in the Mediterranean and Atlantic Seas, both accounting for 24%. The remaining cases were in the Australian Sea (20%), the South Asia Sea (12%), the Persian Gulf and the Pacific Ocean, both with 8%, and the Indian Sea with 4% of all the cases studied. It was concluded that fused filament fabrication, binder jetting and material extrusion represent the main AM processes used to build artificial reefs. Cementitious materials, ceramics, polymers and geopolymer formulations were used, incorporating aggregates from mineral residues, biological wastes and pozzolan materials, to reduce environmental impacts, promote the circular economy and be more beneficial for marine ecosystems. The evaluation ranking assessed how well their design and materials align with their ecological goals, demonstrating that five cases were ranked with high effectiveness, ten projects with moderate effectiveness and one case with low effectiveness.

Originality/value

AM represents an innovative method for marine restoration and management. It offers a rapid prototyping technique for design validation and enables the creation of highly complex shapes for habitat diversification while incorporating a diverse range of materials to benefit environmental and marine species’ habitats.

Details

Rapid Prototyping Journal, vol. 30 no. 11
Type: Research Article
ISSN: 1355-2546

Keywords

Open Access
Article
Publication date: 9 September 2020

Jagjit Singh Srai, Gary Graham, Patrick Hennelly, Wendy Phillips, Dharm Kapletia and Harri Lorentz

The emergence of distributed manufacturing (DM) is examined as a new form of localised production, distinct from previous manifestations of multi-domestic and indigenous…

9331

Abstract

Purpose

The emergence of distributed manufacturing (DM) is examined as a new form of localised production, distinct from previous manifestations of multi-domestic and indigenous production.

Design/methodology/approach

Supply network (SN) configuration and infrastructural provisioning perspectives were used to examine the literature on established localised production models as well as DM. A multiple case study was then undertaken to describe and explore the DM model further. A maximum variation sampling procedure was used to select five exemplar cases.

Findings

Three main contributions emerge from this study. First, the research uniquely brings together two bodies of literature, namely SN configuration and infrastructure provisioning to explore the DM context. Second, the research applies these theoretical lenses to establish the distinctive nature of DM across seven dimensions of analysis. Third, emerging DM design rules are identified and compared with the more established models of localised production, drawing on both literature and DM case evidence.

Practical implications

This study provides a rich SN configuration and infrastructural provisioning view on DM leading to a set of design rules for DM adoption, thus supporting practitioners in their efforts to develop viable DM implementation plans.

Originality/value

The authors contribute to the intra- and inter-organisational requirements for the emerging DM context by providing new perspectives through the combined lenses of SN configuration and infrastructural provisioning approaches.

Details

International Journal of Operations & Production Management, vol. 40 no. 6
Type: Research Article
ISSN: 0144-3577

Keywords

1 – 10 of 402