Article
Publication date: 27 January 2023

Lalitha Ukwatte, Tehmina Khan, Pavithra Siriwardhane and Sarath Lal Ukwatte Jalathge

The purpose of this paper is to explore issues relating to imposing a ban on the importation of asbestos-contaminated building materials (ACBMs) in the Australian context to…

Abstract

Purpose

The purpose of this paper is to explore issues relating to imposing a ban on the importation of asbestos-contaminated building materials (ACBMs) in the Australian context to better understand the multiple accountabilities and consequences.

Design/methodology/approach

This study undertakes a qualitative content analysis of the multiple accountabilities and stakeholder expectations using the lens of actor–network theory. This study further explores the weaknesses and complexities associated with implementing a complete ban on asbestos, ensuring that only asbestos-free building materials are imported to Australia. This study uses data collected from 15 semi-structured interviews with stakeholders, responses from the Australian Border Force to a questionnaire and 215 counter accounts from the media, the Australian Government, industry organizations, non-governmental organizations and social group websites during the period from 2003 to 2021.

Findings

This study reveals that stakeholders' expectations of zero tolerance for asbestos have not been met. This assertion has been backed by evidence of asbestos contamination in imported building materials throughout recent years. Stakeholders say that the complete prevention of the importation of ACBMs has been delayed because of issues in policy implementations, opaque supply chain activities, lack of transparency and non-adherence to mandatory and self-regulated guidelines.

Practical implications

Stakeholders expect public and private sector organizations to meet their accountabilities through mandatory adoption of the given policy framework.

Originality/value

This research provides a road map to identify the multiple accountabilities, their related weaknesses and the lack of implementation of the necessary protocol, which prevents a critical aspect of legislation from being effectively implemented.

Details

Meditari Accountancy Research, vol. 32 no. 1
Type: Research Article
ISSN: 2049-372X

Keywords

Article
Publication date: 4 January 2024

Dirk H.R. Spennemann

Invented in late 1890s, asbestos cement sheeting rose to prominence during the post-Second World War period as a building material for low-cost housing by state housing…

Abstract

Purpose

Invented in late 1890s, asbestos cement sheeting rose to prominence during the post-Second World War period as a building material for low-cost housing by state housing commissions and low-income families (“fibro homes”). The adverse health effects of asbestos fibres in the building industry and home renovation activities are well documented. Fibro homes of the 1950s and 1960s are increasingly coming under the gaze of heritage studies, which brings to the fore the question of how to deal with the asbestos cement sheeting most are clad with.

Design/methodology/approach

This paper provides the first systematic review to assess the literature (126 papers were identified in Google Scholar and scanned for content) on the conservation management of asbestos cement sheeting in heritage properties.

Findings

Overall, engagement with the conservation management of asbestos cement sheeting in heritage properties was low, with only two sources dealing with asbestos cement sheeting in any level of detail. The studies note that if asbestos cement sheeting is in good condition, it should be left alone. Numerous conservation and repair options do exist, in particular the application of (coloured) sealants that extend the life of asbestos cement sheets and asbestos cement roofing.

Originality/value

This paper represents the first systematic review to assess conservation management options for asbestos cement sheeting in heritage properties.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 29 August 2023

Sarath Lal Ukwatte Jalathge, Hang Tran, Lalitha Ukwatte, Tesfaye Lemma and Grant Samkin

This study aims to investigate disclosure of asbestos-related liabilities in corporate accounts and counter-accounts to examine whether and how accounting contributes to corporate…

Abstract

Purpose

This study aims to investigate disclosure of asbestos-related liabilities in corporate accounts and counter-accounts to examine whether and how accounting contributes to corporate accountability for asbestos-contaminated products.

Design/methodology/approach

This study uses the Goffmanesque perspective on impression management to examine instances of concealed asbestos-related liabilities in corporate accounts vis-à-vis the revealing of such liabilities in counter-accounts.

Findings

The findings show counter-accounts provide significant information on liabilities originating from the exposure of employees and consumers to asbestos. By contrast, the malleability of accounting tools enables companies to eschew accounting disclosures. While the frontstage positive performance of companies served an impression management role, their backstage concealing actions enabled companies to cover up asbestos-related liabilities. These companies used three categories of mechanisms to avoid disclosure of asbestos-related liabilities: concealing via a “cloak of competence”, impression management via epistemic work and a silent strategy of concealment frontstage with strategic reorganisation backstage.

Practical implications

This study has policy relevance as regulators need to consider the limits of corporate disclosures as an accountability tool. The findings may also initiate academic and practitioner conversations about accounting standards for long-term liabilities.

Originality/value

This study highlights the strategies companies use both frontstage and backstage to avoid disclosing asbestos-related liabilities. Through analysis of accounts and counter-accounts, this study identifies the limits of accounting as an accountability tool regarding asbestos-induced diseases and deaths.

Details

Meditari Accountancy Research, vol. 32 no. 1
Type: Research Article
ISSN: 2049-372X

Keywords

Book part
Publication date: 16 November 2023

M. Paola Ometto, Michael Lounsbury and Joel Gehman

How do radical technological fields become naturalized and taken for granted? This is a fundamental question given both the positive and negative hype surrounding the emergence of…

Abstract

How do radical technological fields become naturalized and taken for granted? This is a fundamental question given both the positive and negative hype surrounding the emergence of many new technologies. In this chapter, we study the emergence of the US nanotechnology field, focusing on uncovering the mechanisms by which leaders of the National Nanotechnology Initiative managed hype and its concomitant legitimacy challenges which threatened the commercial viability of nanotechnology. Drawing on the cultural entrepreneurship literature at the interface of strategy and organization theory, we argue that the construction of a naturalizing frame – a frame that focuses attention and practice on mundane, “rationalized” activity – is key to legitimating a novel and uncertain technological field. Leveraging the insights from our case study, we further develop a staged process model of how a naturalizing frame may be constructed, thereby paving the way for a decrease in hype and the institutionalization of new technologies.

Details

Organization Theory Meets Strategy
Type: Book
ISBN: 978-1-83753-869-0

Keywords

Open Access
Article
Publication date: 25 April 2022

Hooman Sadeh, Claudio Mirarchi, Farzad Shahbodaghlou and Alberto Pavan

Occupational Safety and Health Administration (OSHA) of the U.S. government ensures that all health and safety regulations, protecting the workers, are enforced. OSHA officers…

1459

Abstract

Purpose

Occupational Safety and Health Administration (OSHA) of the U.S. government ensures that all health and safety regulations, protecting the workers, are enforced. OSHA officers conduct inspections and assess fines for non-compliance and regulatory violations. Literature discussion on the economic impact of OSHA inspections with COVID-19 related citations for the construction sector is lacking. This study aims to investigate the relationships between the number of COVID-19 cases, construction employment and OSHA citations and it further evaluates the total and monthly predicted cost impact of OSHA citations associated with COVID-19 violations.

Design/methodology/approach

An application of multiple regression analysis, a supervised machine learning linear regression model, based on K-fold cross validation sampling and a probabilistic risk-based cost estimate Monte Carlo simulation were utilized to evaluate the data. The data were collected from numerous websites including OSHA, Centers for Disease Control and the World Health Organization.

Findings

The results show that as the monthly construction employment increased, there was a decrease in OSHA citations. Conversely, the cost impact of OSHA citations had a positive relationship with the number of COVID-19 cases. In addition, the monthly cost impact of OSHA COVID-19 related citations along with the total cost impact of citations were predicted and analyzed.

Originality/value

The application of the two models on cost analysis provides a thorough comparison of predicted and overall cost impact, which can assist the contractors to better understand the possible cost ramifications. Based on the findings, it is suggested that the contractors include contingency fees within their contracts, hire safety managers to implement specific safety protocols related to COVID-19 and request a safety action plan when qualifying their subcontractors to avoid potential fines and citations.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 December 2023

Udani Chathurika Edirisinghe, Md Moazzem Hossain and Manzurul Alam

This study aims to explore the managerial conception of the determinants and barriers of sustainability integration into management control systems (MCS) of manufacturing…

Abstract

Purpose

This study aims to explore the managerial conception of the determinants and barriers of sustainability integration into management control systems (MCS) of manufacturing companies in Sri Lanka. Although existing literature has explored the factors that influence the adoption of specific management controls to handle environmental and social issues, the role of management conception has been underrepresented. Specifically, literature is scarce in identifying contextual and organisational factors that influence corporates beyond mere adoption of controls but to integrate with regular controls, especially in developing countries such as Sri Lanka.

Design/methodology/approach

A multiple case study approach has been used to identify the management conception of barriers and enablers for sustainability control integration. The analysis is conducted based on a theoretical framework extending the work of Gond et al. (2012) and George et al. (2016). To obtain an in-depth and multifaceted view, semi-structured interviews were conducted with managers in charge of different functional departments of five manufacturing companies.

Findings

The findings identified managers’ perceived factors, such as environmental impact, stakeholder pressure (customer, competitor and regulatory authorities) and top management commitment, showing a clear difference between strongly and weakly integrated companies. Contrary to the literature, domestic regulatory pressure and multinational ownership do not sufficiently drive MCS sustainability integration.

Practical implications

The findings have implications for managers and practitioners to anticipate the potential barriers and determinants of sustainability integration and provide guidance to take proper measures to deal with them when designing and implementing their MCS.

Originality/value

The study adds value to the literature by presenting a theoretical framework based on the triangulation of different theories to recognise the significance of management idea in sustainable integration. Furthermore, because sustainable integration of MCS is a novel idea, this research is one of the earlier attempts to highlight problems from the perspective of developing countries.

Details

Qualitative Research in Accounting & Management, vol. 21 no. 2
Type: Research Article
ISSN: 1176-6093

Keywords

Article
Publication date: 24 January 2022

Samin Mahdavian, Ming Lu and Estacio Pereira

Previous research regarding shaping factors and major causes behind accidents in the construction field is reviewed. In particular, a hypothetical model is established to…

Abstract

Purpose

Previous research regarding shaping factors and major causes behind accidents in the construction field is reviewed. In particular, a hypothetical model is established to correlate activity time, cost and safety in the context of construction activity acceleration planning. Two demonstration cases are presented to illustrate the proposed theoretical model in the context of critical activity expedition planning. Further, a third case uses a 100-activity project to perform the global level total project time and cost analysis, identifying specific activity acceleration plans that would materialize the shortened total project time at the lowest total project cost.

Design/methodology/approach

This research proposes a safety-centric application framework to guide construction acceleration planning at both activity and project levels while taking sufficient preventive measures against safety hazards and accidents. As planning construction acceleration by factoring in safety constraints inevitably drives up cost, it is imperative to control increases in activity costs at the local level in connection with schedule acceleration planning while at the same time not compromising on safety. This research also addresses this critical question through performing global level total project time and cost analysis.

Findings

An application framework is proposed for guiding a planner through identifying accident shaping factors, obeying schedule acceleration rules and accounting for safety-related costs in attempts to mitigate hazardous situations on-site at both activity level (local) and project level (global), resulting in (1) minimizing the increase of total project cost in schedule acceleration while at the same time not compromising on safety at individual activities; (2) producing specific execution plans on each individual activity in terms of the amount of time to crash and the associated activity cost.

Originality/value

This study is original in developing theories and methods for evaluating the impact of safety constraints upon construction time and cost in activity acceleration planning and project time-cost analysis. The research fills a gap in knowledge in terms of how to factor in sufficient safety constraints while achieving project time and cost objectives on construction acceleration planning at both activity and project levels.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 February 2024

Grant Samkin, Dessalegn Getie Mihret and Tesfaye Lemma

We develop a conceptual framework as a basis for thinking about the impact of extractive industries and emancipatory potential of alternative accounts. We then review selected…

Abstract

Purpose

We develop a conceptual framework as a basis for thinking about the impact of extractive industries and emancipatory potential of alternative accounts. We then review selected alternative accounts literature on some contemporary issues surrounding the extractive industries and identify opportunities for accounting, auditing, and accountability research. We also provide an overview of the other contributions in this special issue.

Design/methodology/approach

Drawing on alternative accounts from the popular and social media as well as the alternative accounting literature, this primarily discursive paper provides a contemporary literature review of identified issues within the extractive industries highlighting potential areas for future research. The eight papers that make up the special issue are located within a conceptual framework is employed to illustrate each paper’s contribution to the field.

Findings

While accounting has a rich literature covering some of the issues detailed in this paper, this has not necessarily translated to the extractive industries. Few studies in accounting have got “down and dirty” so to speak and engaged directly with those impacted by companies operating in the extractive industries. Those that have, have focused on specific areas such as the Niger Delta. Although prior studies in the social governance literature have tended to focus on disclosure issues, it is questionable whether this work, while informative, has resulted in any meaningful environmental, social or governance (ESG) changes on the part of the extractive industries.

Research limitations/implications

The extensive extractive industries literature both from within and outside the accounting discipline makes a comprehensive review impractical. Drawing on both the accounting literature and other disciplines, this paper identifies areas that warrant further investigation through alternative accounts.

Originality/value

This paper and other contributions to this special issue provide a basis and an agenda for accounting scholars seeking to undertake interdisciplinary research into the extractive industries.

Details

Meditari Accountancy Research, vol. 32 no. 1
Type: Research Article
ISSN: 2049-372X

Keywords

Article
Publication date: 3 January 2022

Mohammad Hashim Ibrahimkhil and Laith Hadidi

The aim of this paper is to assess the safety level of construction sites in Afghanistan following the US Army Corps of Engineers (USACE) safety practices and compare this with…

Abstract

Purpose

The aim of this paper is to assess the safety level of construction sites in Afghanistan following the US Army Corps of Engineers (USACE) safety practices and compare this with other construction sites in Afghanistan that follow local government safety guidelines. The USACE oversees and funds many infrastructure projects in Afghanistan, and these projects are supposed to follow the same standards implemented in the USA, including safety standards. The local government of Afghanistan also funds infrastructure projects in Afghanistan; however, these do not follow USACE best practices. This research explores the question of whether the USACE standards provide a safer construction site. The effect of the USACE standards on safety practices in construction projects is also investigated in the Afghanistan construction industry.

Design/methodology/approach

A literature review and other safety checklists were used to develop a safety checklist containing 104 items (questions) in 17 categories. Subsequently, the checklist was used to assess the safety performance of 57 construction projects (25 USACE projects, and 32 governmental projects). Utilizing quantitative analysis, the Spearman rank correlation coefficient (Rho) and Mann–Whitney tests were carried out for correlation and statistical disparity between USACE and governmental projects.

Findings

The safety performance level of Afghan government projects was found to be poor in relation to other developing countries, while in USACE projects it was excellent. In addition, fire prevention, safety administration, PPE, heavy equipment, and handling and storage of materials for all types of contractors were the most overlooked aspects of Afghan Government projects.

Practical implications

The findings clearly demonstrate the deficiencies in construction sites observed during this study and also support the adoption of USACE standards in Afghanistan projects.

Originality/value

To the best of the authors’ knowledge, this study is the first to investigate the safety of construction sites in Afghanistan. The study also demonstrates the benefits of adopting international standards (USACE) to improve the safety of construction sites in a developing country such as Afghanistan. The findings provide evidence of the safety of the Afghanistan construction industry compared to other developing countries. These findings will contribute to the Afghan Government's efforts to track injury statistics.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 January 2024

Christine R. Martell

Inflation and federal monetary efforts to control it with interest rate hikes have very real and overwhelmingly negative consequences on US local governments following the onset…

Abstract

Purpose

Inflation and federal monetary efforts to control it with interest rate hikes have very real and overwhelmingly negative consequences on US local governments following the onset of COVID-19. This study explores the post-pandemic inflationary environment of US local governments; examines the impacts of inflation and high interest rates on local government revenue, operating costs, capital costs, and debt service; reviews local government inflation management strategies, including the use of intergovernmental revenue; and assesses ongoing threats to local government financial health and financial resilience.

Design/methodology/approach

This study uses trend and literature analysis to comment on current issues local governments face.

Findings

The study finds that the growth of property values and resulting stability of property tax revenue has been important to local government revenues; that local governments bear very real burdens as operating and capital costs increase; and that the combination of high inflation and interest rates affects local government debt issuance by negatively affecting credit quality and interest costs, leading to municipal market contraction. Local governments have benefitted tremendously from intergovernmental revenue, but would be ill-advised to rely on it.

Practical implications

Vulnerabilities owing from revenue mismatch with the economy; inadequate affordable housing, inequality, and social issues; a changing workforce and tight labor market; climate change; and federal fiscal contraction—all of which are exacerbated by high inflation and interest rates—require local governments to act strategically, boldly and collaboratively to achieve fiscal health and financial resilience, and to realize positive returns of investments in people and capital.

Originality/value

This work is unique in addressing the post-pandemic impact of inflation and interest rates on local governments.

Details

Journal of Public Budgeting, Accounting & Financial Management, vol. 36 no. 2
Type: Research Article
ISSN: 1096-3367

Keywords