1 – 10 of 49Bankole Osita Awuzie, Zwelinzima P. Mcwari, Progress Shingai Chigangacha, Clinton Ohis Aigbavboa, Theo C. Haupt and Lovelin Obi
An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project…
Abstract
Purpose
An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project failure has continued unabated despite this shift by public-sector entities. Also, there appears to be limited literature focussed on seeking to provide the rationale governing the decision to outsource or insource consultancy services by public-sector organisations. The purpose of this study was to appraise the performance of public-sector projects in which consultancy services have been outsourced or insourced. These are the gaps which this study was undertaken to fill.
Design/methodology/approach
A grounded theory methodology (GTM) research design was adopted based on the nature of evidence sought and gathered from a Provincial Department of Public Works and Infrastructure (PDPWI) in South Africa. Data was obtained from a mixture of semi-structured interviews and project-specific documents spanning a five-year period and was analysed according to the procedures associated with GTM. Accordingly, open coding, axial coding and pattern matching were carried out at several intervals to develop categories and themes.
Findings
The findings of the study showed the absence of a structured approach within the PDPWI for facilitating decisions pertaining to outsourcing or insourcing consultancy services within construction projects. Furthermore, the study established that both approaches yielded similar results across all performance facets of cost, time and quality. In addition, a detailed insight into the steps required for the successful application of GTM in built environment research has been provided in the study.
Originality/value
Limited studies have been undertaken to compare the impact of either outsourced or insourced services on the organisational and project performance. This was the gap to which the study reported in this paper was undertaken to contribute.
Details
Keywords
Beatriz Campos Fialho, Ricardo Codinhoto and Márcio Minto Fabricio
Facilities management (FM) plays a key role in the performance of businesses to ensure the comfort of users and the sustainable use of natural resources over operation and…
Abstract
Purpose
Facilities management (FM) plays a key role in the performance of businesses to ensure the comfort of users and the sustainable use of natural resources over operation and maintenance. Nevertheless, reactive maintenance (RM) services are characterised by delays, waste and difficulties in prioritising services and identifying the root causes of failures; this is mostly caused by inefficient asset information and communication management. While linking building information modelling and the Internet of Things through a digital twin has demonstrated potential for improving FM practices, there is a lack of evidence regarding the process requirements involved in their implementation. This paper aims to address this challenge, as it is the first to statistically characterise RM services and processes to identify the most critical RM problems and scenarios for digital twin implementation. The statistical data analytics approach also constitutes a novel practical approach for a holistic analysis of RM occurrences.
Design/methodology/approach
The research strategy was based on multiple case studies, which adopted university campuses as objects for investigation. A detailed literature review of work to date and documental analysis assisted in generating data on the FM sector and RM services, where qualitative and statistical analyses were applied to approximately 300,000 individual work requests.
Findings
The work provides substantial evidence of a series of patterns across both cases that were not evidenced prior to this study: a concentration of requests within main campuses; a balanced distribution of requests per building, mechanical and electrical service categories; a predominance of low priority level services; a low rate of compliance in attending priority services; a cumulative impact on the overall picture of five problem subcategories (i.e. Building-Door, Mechanical-Plumbing, Electrical-Lighting, Mechanical-Heat/Cool/Ventilation and Electrical-Power); a predominance of problems in student accommodation facilities, circulations and offices; and a concentration of requests related to unlisted buildings. These new patterns form the basis for business cases where maintenance services and FM sectors can benefit from digital twins. It also provides a new methodological approach for assessing the impact of RM on businesses.
Practical implications
The findings provide new insights for owners and FM staff in determining the criticality of RM services, justifying investments and planning the digital transformation of services for a smarter provision.
Originality/value
This study represents a unique approach to FM and provides detailed evidence to identify novel RM patterns of critical service provision and activities within organisations for efficient digitalised data management over a building’s lifecycle.
Details
Keywords
Yongjian Ke, Zhe Cheng, Jingxiao Zhang and Yong Liu
Despite the widespread study and application of public-private partnerships (PPPs) since the 1980s, the field lacks a universally accepted definition that captures the concept's…
Abstract
Purpose
Despite the widespread study and application of public-private partnerships (PPPs) since the 1980s, the field lacks a universally accepted definition that captures the concept's complexity. This study aims to offer a definition and foster a more substantive and comprehensive discourse on PPPs to improve communication and understanding between academics and practitioners from diverse disciplines and legislative backgrounds.
Design/methodology/approach
Grounded in the family-resemblance concept proposed by German philosopher Ludwig Wittgenstein, this study conducts a comprehensive literature review to identify core and non-core elements frequently cited in PPP descriptions. The authors used these findings to develop the PPP sunflower model as a structured framework for defining PPPs.
Findings
The analysis elucidates six core elements consistently present in PPP descriptions: clarity of roles and responsibilities, appropriate risk allocation and sharing, injection of expertise and resources, cooperation and teamwork, a bundle of services, and long-term contracts. Coupled with identified non-core elements, these core components comprise the PPP sunflower model, a structured framework for defining PPPs that accommodates their multi-faceted nature.
Originality/value
The PPP sunflower model distinguishes itself as a unique contribution to the PPP literature. It offers a rigorous theoretical framework that can elucidate the complexity of PPPs for various stakeholders. The model serves as a practical tool for evaluating the authenticity and viability of PPP projects. The study's novelty lies in its adoption of the family-resemblance concept, thereby providing a comprehensive, multi-dimensional framework that enhances the understanding of PPPs across different disciplines and legislative contexts.
Details
Keywords
This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of…
Abstract
Purpose
This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of promoting the adoption of PPP housing scheme in Nigeria.
Design/methodology/approach
The research design adopts the census sampling approach by using well-structured questionnaires distributed to stakeholders involved in PPP-procured mass housing projects, i.e. consultants, in-house professionals, contractors and the organized private sector, registered with PPP departments in the Federal Capital Territory Development Authority, Abuja, Nigeria. Sixty-three risk factors, nine risk allocation criteria and nine project delivery indices were submitted for the respondents to rank on a Likert scale of 7. Two hypotheses were formulated to test whether the risk allocation criteria impacted PPP mass housing delivery or otherwise. The study adopts partial least square-structural equation modeling to model the effect of risk on risk allocation criteria on project delivery indices and risk severity.
Findings
The finding shows that project risk allocation criteria have less effect on project delivery indices than on risk severity. The study concludes that risk allocation principles do not directly affect the delivery of PPP-procured mass housing projects. This is evident by the path coefficient of 0.724 values, which is not statistically significant at a 5% alpha protection value. The study concludes that allocating critical risk factors influences the performance of PPP-procured mass housing projects, as the path coefficient of 0.360 is also not significantly far from 0 and at a 5% alpha protection value.
Originality/value
The study is one of the recent studies conducted in PPP-procured mass housing projects in Nigeria owing to the novelty of procurement option in the sector. It highlights the risk factors that can jeopardize the PPP-procured mass housing project objectives. The study is of immense value to PPP actors in the sector by providing the necessary information required to formulate risk response methods to minimize the impact of the risk factors in PPP mass housing projects.
Details
Keywords
Nur Azliani Haniza Che Pak, Suhaiza Ismail and Norhayati Mohd Alwi
The purpose of this paper is to help better understand the translation process of the management control system (MCS) of privatised solid waste management (SWM) towards creating a…
Abstract
Purpose
The purpose of this paper is to help better understand the translation process of the management control system (MCS) of privatised solid waste management (SWM) towards creating a stable network.
Design/methodology/approach
Drawing on the actor network theory (ANT), the case of a privatised SWM was studied. Data were collected from all entities involved in the privatisation process of SWM, which include Department A, Corporation X and the private sector concessionaire. Six documents were reviewed, 20 interviews were conducted and two observations were carried out.
Findings
The findings reveal that the control mechanism of SWM is complex, involving the interaction between human and non-human actors. Non-human actors include the key performance indicators (KPIs) and the concessionaire agreement (CA), which are the main control mechanisms towards creating a stable SWM network. Essentially, stability is achieved when the KPIs and CA can influence the activities of both intra- and inter-organisational relationships.
Originality/value
This paper provides a better understanding of the translation process of the MCS that adds to the stability of the network of a privatised SWM from the lens of the ANT.
Details
Keywords
Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…
Abstract
Purpose
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.
Design/methodology/approach
A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.
Findings
An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.
Research limitations/implications
The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.
Originality/value
This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.
Andrew Ebekozien, Clinton Aigbavboa and John Aliu
Research reveals that the built environment graduates are not matching the needs of the 21st century construction industry. Evidence shows that the built environment academics…
Abstract
Purpose
Research reveals that the built environment graduates are not matching the needs of the 21st century construction industry. Evidence shows that the built environment academics (BEA) struggle to reskill and upskill to meet the industry's demand. Studies about Nigeria's BEA's perceived barriers in meeting the 21st-century industry demands are scarce. Thus, the paper investigated the perceived barriers and measures to improve BEA in Nigeria's 21st-century world of teaching. The outcome intends to enhance teaching practices and increase employability in the built environment disciplines.
Design/methodology/approach
Data were sourced from elite virtual interviews across Nigeria. The participants were well informed about Nigeria's built environment education and the possible barriers hindering 21st-century teaching from improving employable graduates in the built environment professionals (BEP). The researchers adopted a thematic analysis for the collected data and supplemented the data with secondary sources.
Findings
The study shows that BEA needs to improve BEA's teaching mechanism. Improving BEA will enable the built environment graduates to meet the minimum standards expected by the 21st-century industry. Findings categorised the perceived 22 barriers facing BEA into internal stakeholders-related barriers, external stakeholders-related barriers, and common barriers. Also, findings proffered practicable measures to improve BEA in the workplace via improved industry collaboration and technological advancement.
Research limitations/implications
The research is restricted to the perceived barriers and measures to improve BEA in 21st-century teaching in Nigeria via a qualitative research design. Future research should validate the results and test the paper's proposed framework.
Practical implications
The paper confirms that the BEA requires stakeholder collaboration and technological advancement measures to improve teaching in the 21st century, leading to enhanced employability graduates. The paper would stir major stakeholders, especially BEA, and advance the quality of employable graduates in the Nigerian built environment professions.
Originality/value
The thematic network and proposed framework could be employed to stimulate Nigeria's BEA for better service delivery. This intends to create an enabling environment that will enhance stakeholders' collaboration and technological advancement for the BEA to produce better employable graduates in the 21st century.
Details
Keywords
Babatunde Fatai Ogunbayo, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Opeoluwa Israel Akinradewo and David Edwards
Maintenance policy is an element of building maintenance management that deals with organisation policy, planning and procedures, and delineates how maintenance units in an…
Abstract
Purpose
Maintenance policy is an element of building maintenance management that deals with organisation policy, planning and procedures, and delineates how maintenance units in an organisation will manage specific building components, auxiliary facilities and services. Given this contextual setting, this study investigates whether organisational maintenance policies (OMPs) utilised in developed countries are relevant in developing countries – using Nigeria as a case study exemplar.
Design/methodology/approach
An empirical research design (using deductive reasoning) was implemented for this research. Specifically, a Delphi study conducted revealed 23 elements that impact OMP development in Nigeria.
Findings
Of these twenty elements, six had a very high impact on maintenance management (VHI: 9.00–10.00), nine variables had a high impact (HI: 7.00–8.99) and eight other variables scored a medium impact (MI: 5.00–6.99). Emergent findings reveal that the elements of organisational maintenance policy that engender effective building maintenance management include preparation of safety procedure, optimisation of the maintenance policy, optimisation of the maintenance action plan, well-defined priority system, risk factor establishment, suitable maintenance procedures and a clearly delineated process.
Practical implications
The study findings will guide policymakers in identifying the main elements required in maintenance policies development towards making national public asset preservation and economic gains. Also, the content of the future educational curriculum on maintenance management study will be more receptive to the body of knowledge and the built environment industry.
Originality/value
Cumulatively, the research presented illustrates that these elements replicate those adopted in other countries and that effective maintenance management of public buildings is assured when these elements are integral to the development of an OMP.
Details
Keywords
Mengdi Zhang, Aoxiang Chen, Zhiheng Zhao and George Q. Huang
This research explores mitigating carbon emissions and integrating sustainability in e-commerce logistics by optimizing the multi-depot pollution routing problem with time windows…
Abstract
Purpose
This research explores mitigating carbon emissions and integrating sustainability in e-commerce logistics by optimizing the multi-depot pollution routing problem with time windows (MDPRPTW). A proposed model contrasts non-collaborative and collaborative decision-making for order assignment among logistics service providers (LSPs), incorporating low-carbon considerations.
Design/methodology/approach
The model is substantiated using improved adaptive large neighborhood search (IALNS), tabu search (TS) and oriented ant colony algorithm (OACA) within the context of e-commerce logistics. For model validation, a normal distribution is employed to generate random demand and inputs, derived from the location and requirements files of LSPs.
Findings
This research validates the efficacy of e-commerce logistics optimization and IALNS, TS and OACA algorithms, especially when demand follows a normal distribution. It establishes that cooperation among LSPs can substantially reduce carbon emissions and costs, emphasizing the importance of integrating sustainability in e-commerce logistics optimization.
Research limitations/implications
This paper proposes a meta-heuristic algorithm to solve the NP-hard problem. Methodologies such as reinforcement learning can be investigated in future work.
Practical implications
This research can help logistics managers understand the status of sustainable and cost-effective logistics operations and provide a basis for optimal decision-making.
Originality/value
This paper describes the complexity of the MDPRPTW model, which addresses both carbon emissions and cost reduction. Detailed information about the algorithm, methodology and computational studies is investigated. The research problem encompasses various practical aspects related to routing optimization in e-commerce logistics, aiming for sustainable development.
Details
Keywords
Mastura Jaafar, Andrew Ebekozien, Daina Mohamad and Ahmad Salman
Managing biosphere reserves (BR) have become more challenging regarding the socio-cultural conflict between communities and BR administrators. For the past two decades, community…
Abstract
Purpose
Managing biosphere reserves (BR) have become more challenging regarding the socio-cultural conflict between communities and BR administrators. For the past two decades, community participation (CP) has become the central narrative for BR management practices in Asia. This paper aims to set out to analyse the current literature because of the paucity of systematic reviews on CP in Asian BR. Also, it proffers possible solutions to enhance biosphere performance.
Design/methodology/approach
In total, 31 related studies were identified from the Scopus, Web of Science databases and materials from organisations in the field of practice of territorial conservation. Three themes emerged from the review – willingness to participate, encumbrances and possible solutions.
Findings
Factors that influence community willingness to participate in a BR, encumbrances facing the community and possible policy solutions to enhance CP in a BR in Asia were the three themes that emerged from the review. The factors that influence community willingness were categorised into the level of participants in education, perceived waste of time, no confidence of the outcome, okay with current management, land owned, household size and gender factors.
Research limitations/implications
This paper’s recommendations were based on empirical literature reviewed systematically but do not compromise the robustness concerning BR management practices in Asia. It was established that to enrich the findings of this research, regional studies of CP in BR should be conducted, including primary source data using the mixed methods paradigm.
Practical implications
As part of the practical implications, recommendations were highlighted to enhance CP in BR. Also, the paper suggested that BR administrators should have two-way communication mechanisms, cross-sectoral participation and collaboration, implement locally-based solutions through full engagement of community members in decision-making.
Originality/value
This is probably the first systematic review paper on BR management practices in Asia. Filling the theoretical gap via systematic review was part of the significant contribution to CP in Asian BR.
Details