Search results
1 – 10 of over 14000Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar
Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…
Abstract
Purpose
Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.
Design/methodology/approach
Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.
Findings
Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.
Originality/value
The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.
Details
Keywords
The purpose of this study is to enhance material conservation and further the knowledge of efficient material management practices on construction sites. This study investigated…
Abstract
Purpose
The purpose of this study is to enhance material conservation and further the knowledge of efficient material management practices on construction sites. This study investigated contractors’ material management practices on construction sites in Nigeria. The factors influencing material conservation on construction sites were also examined.
Design/methodology/approach
Data were collected through a survey of 125 contractors who were administered with structured questionnaire, which resulted in 82 valid returned questionnaire. Data collected was analyzed using frequency, importance, utility and severity indexes.
Findings
This study found checking materials delivered to a site for specification, use of security personnel to safeguard materials and analysis of materials as key material management practices used on construction sites. Critical factors influencing material management are materials double-handling, management of surplus materials, subsequent design changes, excessive paperwork and not receiving materials at the expected time.
Practical implications
The implementation of the material management practices identified in this study will support contractors to efficiently manage materials on construction sites. The factors influencing material conservation reported in this study will also help contractors understand the critical factors that may affect material management in their construction sites and make better plans for future projects.
Originality/value
This study has reported key issues confronting contractors on the conservation of materials on construction site and various material management practices suitable for application in a wide range of infrastructure projects. This is significant because the construction industry is recording outrageous cost and time overruns of infrastructure projects, which are vital to economic prosperity of nations. The issues and panaceas presented in this study had received scant consideration in construction literature in the sub-Sahara Africa. This study represents a novel synthesis and adds value to knowledge in a manner that has not been reported in previous studies.
Details
Keywords
Solmaz Ahmadzadeh Amid, Esmatullah Noorzai and Mahmood Golabchi
Because the construction industry is one of the largest waste producers, understanding the primary reasons for waste production is essential. The goal of this study is to identify…
Abstract
Purpose
Because the construction industry is one of the largest waste producers, understanding the primary reasons for waste production is essential. The goal of this study is to identify the major causes of waste production over the project life cycle in Iran's construction industry and to propose effective solutions based on modern technologies like BIM.
Design/methodology/approach
After identifying the primary causes of construction and demolition waste production through interviews and literature analysis, solutions based on building information modeling (BIM) were provided. Then, using questionnaires and exploratory factor analysis (EFA), the areas impacting waste reduction were found.
Findings
The findings suggest that “prefabrication” is the best approach for improving time and quality, while “detection and prediction of errors in the design and construction phases” is the most cost-effective technique for addressing cost and environmental issues.
Originality/value
Cost, time, quality and environmental concerns may all be influenced by effective waste management throughout the project life cycle. Furthermore, utilizing state-of-the-art technologies has far-reaching implications for reducing material waste, resulting in more environmental-friendly construction.
Details
Keywords
Hasith Chathuranga Victar and Anuradha Samarajeewa Waidyasekara
Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address…
Abstract
Purpose
Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address these issues, this study explores the application of Circular Economy (CE) strategies in minimising waste generation and optimising resource utilisation in Sri Lankan construction industry. The research focuses on the construction and building renovation and use and operate stages of the building project life cycle, recognising their significance in waste generation and resource consumption.
Design/methodology/approach
The research employed a qualitative approach, utilising the Delphi technique through three rounds of expert interviews. Seventeen experts were involved in the first round, followed by fifteen in the second round, and twelve in the final round. The collected data was analysed using manual content analysis methods.
Findings
The research findings revealed fifteen C&D WM issues in the construction and building renovation stage in Sri Lanka, along with suitable strategies to overcome each of them. Similarly, eight C&D WM issues were identified for the use and operate stage of the building, and corresponding strategies were provided to address each issue. By adopting CE strategies such as modular design and material reuse, construction projects can optimise the project's timeline, cost, and quality factors. These strategies enable efficient resource allocation, reduce waste generation, and contribute to the overall sustainability of the project. The impact of CE strategies on mitigating these issues within the project management iron triangle was also discussed.
Originality/value
This paper entails delving into how construction, building renovation, and operation stages of a building's life cycle intersect with CE strategies, which profoundly influence operational efficiency and long-term sustainability. By incorporating principles such as energy efficiency, water conservation, and circular product design, the paper illuminates how these strategies facilitate decreased energy usage, enhanced resource management, and diminished waste production throughout the building's lifespan.
Details
Keywords
Muhammad Usman Shahid, Muhammad Jamaluddin Thaheem and Husnain Arshad
The construction industry struggles in environmental and economic performance due to waste generation. Several studies have measured this waste in the construction industry of…
Abstract
Purpose
The construction industry struggles in environmental and economic performance due to waste generation. Several studies have measured this waste in the construction industry of developing countries like India, Brazil, China, Nigeria and Iran, and proposed strategies to enhance the overall efficiency. But no such work exists in Pakistan's context. The construction industry of Pakistan contributes significantly to the country's gross domestic product (GDP). And with several mega projects in progress to overcome the energy crises and improve the infrastructure of the country, the absence of proper waste management policies and plans calls for empirical research. Therefore, this study quantifies and benchmarks material waste in the local context, its impact on project cost and the effect of multiple subcontracting arrangements on waste generation. It also proposes a conceptual waste management plan (WMP) for local conditions which can be generalized for developing countries.
Design/methodology/approach
This paper uses a mixed research approach by leveraging Saunders's research onion model. To benchmark the current wastage practices, quantitative data of material waste in the Pakistani construction industry are gathered through document review of accounting systems, inventory and payment records of 40 completed building projects. Using the data, the waste rate of different materials is measured along with their impact on cost. Additionally, the role of subcontracting arrangements in waste generation is also investigated. Also, semi-structured interviews are conducted with project managers of high- and low-performing construction organizations to propose a conceptual WMP for the local industry and developing countries.
Findings
The highest wasteful materials by quantity are wood, sand and concrete blocks, and those by cost are wood, bricks and steel. By quantity, 123% more material was used on average than the actual productive work. Also, the labor only (L-O) subcontracting arrangement causes maximum waste. Moreover, the difference between the highest (155%) and lowest wasting company (104%) is 51%, highlighting the proactive and resistive waste management culture and approach by the worst- and best-performing companies. Further, the impact of waste quantities is more than 2% of the project cost. Finally, a conceptual model consisting of measures at the project, industry and national levels is also proposed as a guide for developing countries.
Practical implications
The findings of this benchmarking study can help improve the project planning, execution and monitoring, and control practices by providing a better understanding of the material waste potential. This will help economize the construction industry and improve its sustainability.
Originality/value
This is the first benchmarking study that quantitatively measures material waste in the construction industry of Pakistan. It highlights that costly as well as sustainability-implicating materials are frequently wasted in the local construction projects. Also, this study correlates the wastage with subcontracting arrangements. Additionally, an original conceptual WMP is proposed that could help the industry improve its performance. The findings could help the construction professionals identify the loopholes in their material management practices and not only save money but also ensure better sustainability.
Details
Keywords
Hasith Chathuranga Victar, B.A.K.S. Perera, Asha Dulanjalie Palihakkara and Kaveesha Gihani Dewagod
The construction industry is shifting towards becoming more circular by reducing waste, reusing building materials and embracing regenerative solutions for energy generation and…
Abstract
Purpose
The construction industry is shifting towards becoming more circular by reducing waste, reusing building materials and embracing regenerative solutions for energy generation and biodiversity conservation. Thus, construction professionals must perform diversified services to achieve a circular built environment (CBE). Implementing resource planning and waste management in CBE has already posed challenges to the quantity surveying profession; thus, quantity surveyors (QSs) should be equipped with new roles and competencies to tackle challenges in achieving a CBE. Hence, this study aimed to investigate the functions and competencies of QSs at the design and building material sourcing stages in achieving a CBE according to 3R principles.
Design/methodology/approach
The research apprehended a qualitative approach, including two expert interview rounds adhering to the Delphi technique with 14 and 11 experts per each round. Manual content analysis was incorporated to analyse the collected data.
Findings
The research findings revealed the important roles and competencies of QSs in achieving a CBE. In addition, essential functions and competencies were categorised according to the 3R principles (reduce, reuse, recycle) to successfully implement CBE during the Design and Building Material Sourcing stages. According to the 3R principles of CBE, cost control, cost planning, feasibility studies, measurement and quantification, risk management, value engineering and innovations and technologies were well-received by most interviewees as essential roles of QSs during the Design and Building Material Sourcing stages. Further, basic/mandatory competencies (personal, interpersonal, professional practice and business skills), economic analysis, BIM management, cost management and risk management are highly regarded by experts for QS as important competencies to achieve CBE.
Originality/value
With new construction trends, QSs must enhance their conventional roles and competencies and search for new skills and competencies. Those skills and competencies could be linked to the CE concept, either directly or indirectly. Since QS holds a prominent place in sustainable construction in CBE, adapting to changes in the construction industry such as CBE is timely for QSs. Further, there is a shortage of literature regarding QSs' roles and competencies in achieving a CBE; thus, this study will contribute by identifying new avenues for QSs in achieving a CBE in the practice and the research.
Details
Keywords
The improper evaluation and information management of circular economy (CE) (i.e. design, planning, supply chain, waste pile and material hazard) is critical for public health and…
Abstract
Purpose
The improper evaluation and information management of circular economy (CE) (i.e. design, planning, supply chain, waste pile and material hazard) is critical for public health and is a major problem in the waste management of precast concrete (PC) building manufacture and construction and demolition wastes industry. The CE model is particularly problematic for PC building construction projects where the standard practices for the total number of waste building materials are not appropriate and do not match the safe disposal design specification, such as the recent number increase in the Malaysian illegal construction waste pile during the Movement Control Order (11 March 2021, about 5 out of 29 landfills related to states enforcing Act 672). The study aims to develop a framework application (i.e. Building Information Modelling [BIM]) that supports intelligent waste recycling management and sophisticated CE model system solutions.
Design/methodology/approach
Thus, the development of a new BIM-based programming algorithm approach is proposed for optimising CE in accordance with the needs of the current PC building construction schemes. As a precursor to this study, the concepts of CE practices are reviewed and the main features of BIM tools and techniques currently being employed on such projects are presented.
Findings
Sophisticated CE system solutions are described as an essential component of this optimisation to reduce the amount of waste generated at the end of the life cycle of PC building construction projects and to better manage the resources used throughout it.
Originality/value
Finally, the potential for a research framework for developing such a system in the future is presented.
Details
Keywords
Moses Muhwezi, Henry Mutebi, Samuel Ssekajja Mayanja, Benjamin Tukamuhabwa, Sheila Namagembe and Robert Kalema
Procuring relief products and services is a challenging process for humanitarian organizations (HOs), yet it accounts for approximately 65% of relief operations’ costs (Moshtari…
Abstract
Purpose
Procuring relief products and services is a challenging process for humanitarian organizations (HOs), yet it accounts for approximately 65% of relief operations’ costs (Moshtari et al., 2021). This paper aims to examine how procurement internal controls, materials and purchasing procedure standardization influence information integration and procurement performance.
Design/methodology/approach
In this study, partial least square structural equation models and multigroup analysis were used to analyze data collected from 170 HOs.
Findings
Procurement internal controls and material and purchasing procedure standardization fully mediate between information integration and procurement performance.
Research limitations/implications
The study focuses only on HOs. Since humanitarian procurement projects take place over a period of several years, it is difficult to capture the long-term effects of information integration, procurement internal controls, material and purchasing procedure standardization and procurement performance. In this regard, a longitudinal study could be undertaken, provided that the required resources are available.
Practical implications
Procurement managers should implement information integration practices within acceptable procurement internal controls and standardize material and purchasing procedures to boost procurement performance.
Originality/value
By integrating information through procurement internal controls and standardizing material and purchasing procedures, procurement performance in a humanitarian setting can be systematically optimized.
Details
Keywords
Anurag Tiwari and Priyabrata Mohapatra
The purpose of this study is to formulate a new class of vehicle routing problem with an objective to minimise the total cost of raw material collection and derive a new approach…
Abstract
Purpose
The purpose of this study is to formulate a new class of vehicle routing problem with an objective to minimise the total cost of raw material collection and derive a new approach to solve optimization problems. This study can help to select the optimum number of suppliers based on cost.
Design/methodology/approach
To model the raw material vehicle routing problem, a mixed integer linear programming (MILP) problem is formulated. An interesting phenomenon added to the proposed problem is that there is no compulsion to visit all suppliers. To guarantee the demand of semiconductor industry, all visited suppliers should reach a given raw material capacity requirement. To solve the proposed model, the authors developed a novel hybrid approach that is a combination of block and edge recombination approaches. To avoid bias, the authors compare the results of the proposed methodology with other known approaches, such as genetic algorithms (GAs) and ant colony optimisation (ACO).
Findings
The findings indicate that the proposed model can be useful in industries, where multiple suppliers are used. The proposed hybrid approach provides a better sequence of suppliers compared to other heuristic techniques.
Research limitations/implications
The data used in the proposed model is generated based on previous literature. The problem derives from the assumption that semiconductor industries use a variety of raw materials.
Practical implications
This study provides a new model and approach that can help practitioners and policymakers select suppliers based on their logistics costs.
Originality/value
This study provides two important contributions in the context of the supply chain. First, it provides a new variant of the vehicle routing problem in consideration of raw material collection; and second, it provides a new approach to solving optimisation problems.
Details
Keywords
Georg Grossmann, Alice Beale, Harkaran Singh, Ben Smith and Julie Nichols
Cultural heritage archiving is experiencing an increase in digitalisations of artefacts in the last 15 years. The reason behind this trend is a demand for providing information…
Abstract
Cultural heritage archiving is experiencing an increase in digitalisations of artefacts in the last 15 years. The reason behind this trend is a demand for providing information about the artefact in a more accessible way to the audience, for example, through online delivery or virtual reality. Other reasons might be to simplify and automate the management of artefacts. Having a ‘digital copy’ of artefacts, allows one to search an archive and plan its storage and dissemination in a comprehensive manner. With the increased digitalisation comes an increased use of artificial intelligence [AI] applications. AI can be very beneficial in classifying artefacts automatically through machine learning [ML] and natural language processing [NLP]. For example, an algorithm can identify the source and age of artefacts based on an image and can do this much faster for a large collection of photos than a human. Although AI provides many benefits, it also presents challenges: Sophisticated AI techniques require certain insights on how they work, need specialists to customise a solution, and require an existing large dataset to train an algorithm. Another challenge is that typical AI techniques are regarded as black boxes, which means they decide, but it is not obvious why a decision has been made. This chapter describes a project in collaboration with the South Australian Museum [SAM] on the application of AI to extract material lists from a description of artefacts. A large dataset to train an algorithm did not exist, and hence, a customised approach was required. The outcome of the project was the application of NLP in combination with easy-to-customise rules that can be applied by non-IT specialists. The resulting prototype achieved the extraction of materials from a large list of artefacts within seconds and a flexible solution that can be applied on other collections in the future.
Details