Search results

1 – 10 of 62
Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

1035

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 28 June 2022

Sahar Jawad, Ann Ledwith and Rashid Khan

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…

1718

Abstract

Purpose

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.

Design/methodology/approach

This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.

Findings

Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.

Practical implications

The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.

Originality/value

This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 18 May 2023

Anna Trubetskaya, Alan Ryan and Frank Murphy

This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment…

5626

Abstract

Purpose

This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment effectiveness (OEE) tool to enhance the process performance and establish Fourth Industrial Revolution (I4.0) platform in small and medium enterprises (SMEs).

Design/methodology/approach

This work utilised plan, do, check, act Lean methodology to create a digital twin of each machine in a smart manufacturing facility by taking the Lean tool OEE and digitally transforming it in the context of I4.0. To demonstrate the effectiveness of process digitisation, a case study was carried out at a manufacturing department to provide the data to the model and later validate synergy between Lean and I4.0 platform.

Findings

The OEE parameter can be increased by 10% using a proposed digital twin model with the introduction of a Level 0 into VM platform to clearly define the purpose of each data point gathered further replicate in projects across the value stream.

Research limitations/implications

The findings suggest that researchers should look beyond conversion of stored data into visualisations and predictive analytics to improve the model connectivity. The development of strong big data analytics capabilities in SMEs can be achieved by shortening the time between data gathering and impact on the model performance.

Originality/value

The novelty of this study is the application of OEE Lean tool in the smart manufacturing sector to allow SME organisations to introduce digitalisation on the back of structured and streamlined principles with well-defined end goals to reach the optimal OEE.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 12 April 2024

Aleš Zebec and Mojca Indihar Štemberger

Although businesses continue to take up artificial intelligence (AI), concerns remain that companies are not realising the full value of their investments. The study aims to…

Abstract

Purpose

Although businesses continue to take up artificial intelligence (AI), concerns remain that companies are not realising the full value of their investments. The study aims to provide insights into how AI creates business value by investigating the mediating role of Business Process Management (BPM) capabilities.

Design/methodology/approach

The integrative model of IT Business Value was contextualised, and structural equation modelling was applied to validate the proposed serial multiple mediation model using a sample of 448 organisations based in the EU.

Findings

The results validate the proposed serial multiple mediation model according to which AI adoption increases organisational performance through decision-making and business process performance. Process automation, organisational learning and process innovation are significant complementary partial mediators, thereby shedding light on how AI creates business value.

Research limitations/implications

In pursuing a complex nomological framework, multiple perspectives on realising business value from AI investments were incorporated. Several moderators presenting complementary organisational resources (e.g. culture, digital maturity, BPM maturity) could be included to identify behaviour in more complex relationships. The ethical and moral issues surrounding AI and its use could also be examined.

Practical implications

The provided insights can help guide organisations towards the most promising AI activities of process automation with AI-enabled decision-making, organisational learning and process innovation to yield business value.

Originality/value

While previous research assumed a moderated relationship, this study extends the growing literature on AI business value by empirically investigating a comprehensive nomological network that links AI adoption to organisational performance in a BPM setting.

Open Access
Article
Publication date: 2 May 2024

Jonas Molin and Zahra Ahmadi

The purpose of this study is to develop and validate the business streamlining (BS) model proposed in 2017.

Abstract

Purpose

The purpose of this study is to develop and validate the business streamlining (BS) model proposed in 2017.

Design/methodology/approach

This study/paper develops and validates the qualitatively generated BS model, a conceptual model of service sourcing relationships, by testing it quantitatively. A survey was sent to chief exective officers, chief purchasing officers or facility managers in 764 private or public companies in Sweden with an annual turnover exceeding € 10m. The categories were tested and analyzed by means of factor analysis.

Findings

The BS model for managing service sourcing processes was confirmed to be significant overall, meaning that it is applicable irrespective of service sourcing context. The efficiency pursuing (EP) was found to have an interlinking role that calls for a revision of the BS model. Furthermore, the four categories tended to load pairwise.

Research limitations/implications

Although this cross-sectional study confirms the relevance of the BS model for managing service-sourcing processes, further studies should examine both the relative significance of its categories in different service-sourcing contexts and why the four main categories tend to pair.

Practical implications

The results support that the model is flexible and adaptable to a wide range of service-sourcing circumstances. Irrespective of the relative complexity of facility management (FM) sourcing processes, the categories can be adapted to fit the service sourcing context. Thus, it can be used as a tool to analyze and facilitate strategic decision-making.

Originality/value

The paper validates that the BS model can represent the dynamics of different service-sourcing processes, regardless of the complexity of the context.

Details

Journal of Business & Industrial Marketing, vol. 39 no. 13
Type: Research Article
ISSN: 0885-8624

Keywords

Open Access
Article
Publication date: 22 September 2022

Samuel Foli, Susanne Durst and Serdal Temel

Acknowledging, on the one hand, the increasing fragility of supply chains and the number of risks involved in supply chain operations and, on the other hand, the role of small…

2977

Abstract

Purpose

Acknowledging, on the one hand, the increasing fragility of supply chains and the number of risks involved in supply chain operations and, on the other hand, the role of small- and medium-sized enterprises (SMEs) in supply chains and the high exposure of these firms to risks of different types, this study aims to examine the relationship between supply chain risk management (SCRM) and innovation performance in SMEs. Furthermore, the impact of technological turbulence on this relationship was studied to take into account recent technological changes.

Design/methodology/approach

Structural equation modelling was carried out on a sample of Turkish SMEs to test the hypotheses developed.

Findings

The findings presented allow the authors to better understand the link between SCRM and innovation performance in SMEs. More precisely, empirical evidence is provided about the impact of SCRM components such as maturity and ability on innovation performance. Furthermore, the findings show the impact of technological turbulence on both SCRM and innovation performance.

Originality/value

By focusing on SCRM in SMEs, this paper contributes to the body of knowledge with regard to SCRM in general and with regard to SMEs in particular; research on the latter has only started recently. Moreover, by having studied SMEs from a developing country (other than China), this paper helps to develop a broader and more diverse perspective of SCRM.

Details

Journal of Entrepreneurship in Emerging Economies, vol. 16 no. 3
Type: Research Article
ISSN: 2053-4604

Keywords

Open Access
Article
Publication date: 5 October 2023

Peter Dornheim and Ruediger Zarnekow

The human factor is the most important defense asset against cyberattacks. To ensure that the human factor stays strong, a cybersecurity culture must be established and cultivated…

1267

Abstract

Purpose

The human factor is the most important defense asset against cyberattacks. To ensure that the human factor stays strong, a cybersecurity culture must be established and cultivated in a company to guide the attitudes and behaviors of employees. Many cybersecurity culture frameworks exist; however, their practical application is difficult. This paper aims to demonstrate how an established framework can be applied to determine and improve the cybersecurity culture of a company.

Design/methodology/approach

Two surveys were conducted within eight months in the internal IT department of a global software company to analyze the cybersecurity culture and the applied improvement measures. Both surveys comprised the same 23 questions to measure cybersecurity culture according to six dimensions: cybersecurity accountability, cybersecurity commitment, cybersecurity necessity and importance, cybersecurity policy effectiveness, information usage perception and management buy-in.

Findings

Results demonstrate that cybersecurity culture maturity can be determined and improved if accurate measures are derived from the results of the survey. The first survey showed potential for improving the dimensions of cybersecurity accountability, cybersecurity commitment and cybersecurity policy effectiveness, while the second survey proved that these dimensions have been improved.

Originality/value

This paper proves that practical application of cybersecurity culture frameworks is possible if they are appropriately tailored to a given organization. In this regard, scientific research and practical application combine to offer real value to researchers and cybersecurity executives.

Details

Information & Computer Security, vol. 32 no. 2
Type: Research Article
ISSN: 2056-4961

Keywords

Open Access
Article
Publication date: 27 May 2024

Priscilla Huldt Navarro and Linnea Haag

The purpose of this paper is to explore how process management (PM) can support small- and medium-sized enterprises (SMEs) in pursuing sustained competitive advantage. For this…

Abstract

Purpose

The purpose of this paper is to explore how process management (PM) can support small- and medium-sized enterprises (SMEs) in pursuing sustained competitive advantage. For this purpose, a dynamic capabilities (DC) lens was used.

Design/methodology/approach

A narrative literature review and a multiple case study with an action research approach at two road freight transport companies were used.

Findings

PM provides structure and system thinking to support the development of competitive advantage. Concerning PM, management of knowledge, management style and process orientation are key factors for the generation of competitive advantage for SMEs.

Research limitations/implications

This study contributes to PM literature by studying its support for and implementation at SMEs. Furthermore, the study contributes to the literature on DC by providing concrete examples of activities linked to such capabilities.

Practical implications

This study contributes to practitioners by providing examples of implementing PM and identifying competitive advantage, connected with PM elements.

Social implications

This study has social and environmental implications for the quality of life of the Swedish people.

Originality/value

This paper contributes to clarifying the connection between the research fields of quality management and DC to explore how PM can support SMEs in pursuing sustained competitive advantage.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 26 March 2024

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Noor Alyani Nor Azazi and Okechukwu Dominic Saviour Duru

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle…

Abstract

Purpose

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle in the 21st century. Revit has been identified as a frequently used tool for delivering BIM in the built environment. Studies about BIM technology via Revit are scarce in training middle-level workforce higher education institutions. Thus, this study aims to investigate the relevance of BIM technology and offer measures to promote digitalisation in Nigeria’s built environment polytechnic undergraduates via Revit.

Design/methodology/approach

Given the unexplored nature of training the middle-level workforce in Nigeria, 37 semi-structured virtual interviews were conducted across Nigeria, and saturation was achieved. The participants were knowledgeable about construction-related BIM. The researchers used a thematic analysis for the collected data and honed them with secondary sources.

Findings

Improved visualisation of design, effective and efficient work productivity, automatic design and quantification, improved database management and collaboration and data storage in the centrally coordinated model, among others, emerged as BIM’s benefits. BIM technology via Revit is challenging, especially in Nigeria’s polytechnic education curriculum. The 24 perceived issues were grouped into government/regulatory agencies-related, polytechnic management-related and polytechnic undergraduate students-related hindrances in Nigeria’s built environment.

Research limitations/implications

This study is limited to BIM implications for Nigeria’s built environment polytechnic undergraduates.

Originality/value

This study contributes to the literature paucity in attempting to uncover perceived issues hindering the implementation of BIM technology via Revit in training Nigeria’s built environment polytechnic undergraduates via a qualitative approach.

Access

Only content I have access to

Year

Last week (62)

Content type

1 – 10 of 62