Search results

1 – 10 of 396
Open Access
Article
Publication date: 29 February 2024

Francisco Liñán, Inmaculada Jaén and Ana M. Domínguez-Quintero

This paper integrates the action phase theory (APT) and the theory of planned behaviour (TPB) to analyse the dynamic mechanisms involved in the configuration of goals and…

Abstract

Purpose

This paper integrates the action phase theory (APT) and the theory of planned behaviour (TPB) to analyse the dynamic mechanisms involved in the configuration of goals and implementation intentions throughout the entrepreneurship process.

Design/methodology/approach

The empirical analysis compares individuals in different phases of this process (not yet decided, potential and nascent entrepreneurs). A large sample of adults from Spain is analysed. Structural equation models and multi-group analysis (MGA) serve to test the hypotheses.

Findings

The results confirm that perceived behavioural control (PBC) is the most influential antecedent of entrepreneurial goal intention (EGI) in pre-actional phases (undecided and potential entrepreneurs), whilst attitude towards entrepreneurship (ATE) takes this role during nascency. Subjective norms (SNs) are more important in Phase 1 (establishing the goal) and in Phase 3 (performing nascent behaviour).

Originality/value

This study contributes to both the TPB and the APT. It provides the most relevant insight into the mental process that leads to starting up and helps explain certain previous conflicting results found in the literature. Additionally, it has important implications not only for theory building but also for support bodies and for entrepreneurship educators.

Details

International Journal of Entrepreneurial Behavior & Research, vol. 30 no. 11
Type: Research Article
ISSN: 1355-2554

Keywords

Open Access
Article
Publication date: 11 July 2023

Oscar Y. Moreno Rocha, Paula Pinto, Maria C. Consuegra, Sebastian Cifuentes and Jorge H. Ulloa

This study aims to facilitate access to vascular disease screening for low-income individuals living in remote and conflict areas based on the results of a pilot trial in…

Abstract

Purpose

This study aims to facilitate access to vascular disease screening for low-income individuals living in remote and conflict areas based on the results of a pilot trial in Colombia. Also, to increase the amount of diagnosis training of vascular surgery (VS) in civilians.

Design/methodology/approach

The operation method includes five stages: strategy development and adjustment; translation of the strategy into a real-world setting; operation logistics planning; strategy analysis and adoption. The operation plan worked efficiently in this study’s sample. It demonstrated high sensibility, efficiency and safety in a real-world setting.

Findings

The authors developed and implemented a flow model operating plan for screening vascular pathologies in low-income patients pro bono without proper access to vascular health care. A total of 140 patients from rural areas in Colombia were recruited to a controlled screening session where they underwent serial noninvasive ultrasound assessments conducted by health professionals of different training stages in VS.

Research limitations/implications

The plan was designed to be implemented in remote, conflict areas with limited access to VS care. Vascular injuries are critically important and common among civilians and military forces in regions with active armed conflicts. As this strategy can be modified and adapted to different medical specialties and geographic areas, the authors recommend checking the related legislation and legal aspects of the intended areas where we will implement this tool.

Practical implications

Different sub-specialties can implement the described method to be translated into significant areas of medicine, as the authors can adjust the deployment and execution for the assessment in peripheral areas, conflict zones and other public health crises that require a faster response. This is necessary, as the amount of training to which VS trainees are exposed is low. A simulated exercise offers a novel opportunity to enhance their current diagnostic skills using ultrasound in a controlled environment.

Social implications

Evaluating and assessing patients with limited access to vascular medicine and other specialties can decrease the burden of vascular disease and related complications and increase the number of treatments available for remote communities.

Originality/value

It is essential to assess the most significant number of patients and treat them according to their triage designation. This management is similar to assessment in remote areas without access to a proper VS consult. The authors were able to determine, classify and redirect to therapeutic interventions the patients with positive findings in remote areas with a fast deployment methodology in VS.

Plain language summary

Access to health care is limited due to multiple barriers and the assessment and response, especially in peripheral areas that require a highly skilled team of medical professionals and related equipment. The authors tested a novel mobile assessment tool for remote and conflict areas in a rural zone of Colombia.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 14 no. 2
Type: Research Article
ISSN: 2042-6747

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 30 August 2022

Petteri Annunen, Juho Tella, Sini Pekki and Harri Haapasalo

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the…

1912

Abstract

Purpose

This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the elements for creating the maintenance capability and the process to be used in construction life cycle projects for buildings.

Design/methodology/approach

An inductive and qualitative research method was used to construct the proposed process based on the literature and 18 interviews in two large construction companies.

Findings

The results indicate that the maintenance phase is usually overlooked during the design and construction phases, and capabilities are not systematically built. In particular, processes are lacking in data management, causing severe problems in maintenance.

Originality/value

This study presents a process including key requirements and activities for creating maintenance capability in conjunction with the design and construction phases, which is novel to the literature. The validated process can be adapted based on the needs of the construction company.

Details

Journal of Facilities Management , vol. 22 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79482

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 29 February 2024

Erlend Vik and Lisa Hansson

As part of a national plan to govern professional and organizational development in Norwegian specialist healthcare, the country’s hospital clinics are tasked with constructing…

Abstract

Purpose

As part of a national plan to govern professional and organizational development in Norwegian specialist healthcare, the country’s hospital clinics are tasked with constructing development plans. Using the development plan as a case, the paper analyzes how managers navigate and legitimize the planning process among central actors and deals with the contingency of decisions in such strategy work.

Design/methodology/approach

This study applies a qualitative research design using a case study method. The material consists of public documents, observations and single interviews, covering the process of constructing a development plan at the clinical level.

Findings

The findings suggest that the development plan was shaped through a multilevel translation process consisting of different contending rationalities. At the clinical level, the management had difficulties in legitimizing the process. The underlying tension between top-down and bottom-up steering challenged involvement and made it difficult to manage the contingency of decisions.

Practical implications

The findings are relevant to public sector managers working on strategy documents and policymakers identifying challenges that might hinder the fulfillment of political intentions.

Originality/value

This paper draws on a case from Norway; however, the findings are of general interest. The study contributes to the academic discussion on how to consider both the health authorities’ perspective and the organizational perspective to understand the manager’s role in handling the contingency of decisions and managing paradoxes in the decision-making process.

Details

Journal of Health Organization and Management, vol. 38 no. 9
Type: Research Article
ISSN: 1477-7266

Keywords

Open Access
Article
Publication date: 7 May 2024

Yazeed A. Alragabah and Mohd. Ahmed

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…

Abstract

Purpose

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.

Design/methodology/approach

This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.

Findings

The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.

Research limitations/implications

This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.

Originality/value

Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.

Details

Frontiers in Engineering and Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 3 July 2023

Siraj Ahmed, Jukka Majava and Kirsi Aaltonen

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…

3616

Abstract

Purpose

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.

Design/methodology/approach

A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).

Findings

The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.

Originality/value

Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 23 April 2024

Anna Kadefors, Kirsi Aaltonen, Stefan Christoffer Gottlieb, Ole Jonny Klakegg, Pertti Lahdenperä, Nils O.E. Olsson, Lilly Rosander and Christian Thuesen

Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level…

Abstract

Purpose

Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level learning in this field. This paper employs an institutional perspective to analyze how legitimacy for relational contracting has been produced and challenged in Denmark, Finland, Norway and Sweden, including implications for dissemination and learning.

Design/methodology/approach

A collaborative case study design is used, where longitudinal accounts of the developments in relational contracting over more than 25 years in four Nordic countries were developed by scholars based in each country. The descriptions are underpinned by literature sources from research, practice and policy.

Findings

The countries share similar problem perceptions that have triggered the de-institutionalization of traditional contracting practices. Models and policies developed elsewhere are important sources of knowledge and legitimacy. Most countries have seen pendulum movements, where dissemination of relational contracting is followed by backlashes when projects fail to meet projected outcomes. Before long, however, relational contracting tends to re-emerge under new labels and in slightly new forms. Such a proliferation of concepts presents further obstacles to learning. Successful institutionalization is found to rely on realistic goals in combination with broad competence development at the organizational and industry levels.

Practical implications

In seeking inspiration from other countries, policymakers should go beyond contract models to also consider strategies to manage industry-level learning.

Originality/value

The paper provides a unique longitudinal cross-country perspective on the field of relational contracting. As such, it contributes to the small stream of literature on long-term institutional change in the construction sector.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 24 October 2022

Suzana Sukovic, Jamaica Eisner and Kerith Duncanson

Effective use of data across public health organisations (PHOs) is essential for the provision of health services. While health technology and data use in clinical practice have…

Abstract

Purpose

Effective use of data across public health organisations (PHOs) is essential for the provision of health services. While health technology and data use in clinical practice have been investigated, interactions with data in non-clinical practice have been largely neglected. The purpose of this paper is to consider what constitutes data, and how people in non-clinical roles in a PHO interact with data in their practice.

Design/methodology/approach

This mixed methods study involved a qualitative exploration of how employees of a large PHO interact with data in their non-clinical work roles. A quantitative survey was administered to complement insights gained through qualitative investigation.

Findings

Organisational boundaries emerged as a defining issue in interactions with data. The results explain how data work happens through observing, spanning and shifting of boundaries. The paper identifies five key issues that shape data work in relation to boundaries. Boundary objects and processes are considered, as well as the roles of boundary spanners and shifters.

Research limitations/implications

The study was conducted in a large Australian PHO, which is not completely representative of the unique contexts of similar organisations. The study has implications for research in information and organisational studies, opening fields of inquiry for further investigation.

Practical implications

Effective systems-wide data use can improve health service efficiencies and outcomes. There are also implications for the provision of services by other health and public sectors.

Originality/value

The study contributes to closing a significant research gap in understanding interactions with data in the workplace, particularly in non-clinical roles in health. Research analysis connects concepts of knowledge boundaries, boundary spanning and boundary objects with insights into information behaviours in the health workplace. Boundary processes emerge as an important concept to understand interactions with data. The result is a novel typology of interactions with data in relation to organisational boundaries.

Details

Global Knowledge, Memory and Communication, vol. 73 no. 4/5
Type: Research Article
ISSN: 2514-9342

Keywords

Access

Only content I have access to

Year

Last month (396)

Content type

1 – 10 of 396