Article
Publication date: 2 January 2024

Emma Mihocic, Koorosh Gharehbaghi, Per Hilletofth, Kong Fah Tee and Matt Myers

In successfully meeting city and metropolitan growth, sustainable development is compulsory. Sustainability is a must-focus for any project, particularly for large and mega rail…

Abstract

Purpose

In successfully meeting city and metropolitan growth, sustainable development is compulsory. Sustainability is a must-focus for any project, particularly for large and mega rail infrastructure. This paper aims to investigate to what degree social, environmental and economic factors influence the government when planning sustainable rail infrastructure projects. To respond to such a matter, this paper focuses on two Australian mega-rail projects: the South West Rail Link (SWRL) and the Mernda Rail Extension (MRE).

Design/methodology/approach

As the basis of an experimental evaluation framework strengths, weaknesses, opportunities and threats (SWOT) and factor analysis were used. These two methods were specifically selected as comparative tools for SWRL and SWRL projects, to measure their overall sustainability effect.

Findings

Using factor analysis, in the MRE, the factors of network capacity, accessibility, employment and urban planning were seen frequently throughout the case study. However, politics and economic growth had lower frequencies throughout this case study. This difference between the high-weighted factors is likely a key element that determined the SWRL to be more sustainable than the MRE. The SWOT analysis showed the strengths the MRE had over the SWRL such as resource use and waste management, and natural habitat preservation. These two analyses have shown that overall, calculating the sustainability levels of a project can be subjective, based on the conditions surrounding various analysis techniques.

Originality/value

This paper first introduces SWRL and MRE projects followed by a discussion about their overall sustainable development. Both projects go beyond the traditional megaprojects' goal of improving economic growth by developing and enhancing infrastructure. Globally, for such projects, sustainability measures are now considered alongside the goal of economic growth. Second, SWOT and factor analysis are undertaken to further evaluate the complexity of such projects. This includes their overall sustainable development vision alignment with environmental, economic and social factors.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 25 December 2023

Isaac Akomea-Frimpong, Jacinta Rejoice Ama Delali Dzagli, Kenneth Eluerkeh, Franklina Boakyewaa Bonsu, Sabastina Opoku-Brafi, Samuel Gyimah, Nana Ama Sika Asuming, David Wireko Atibila and Augustine Senanu Kukah

Recent United Nations Climate Change Conferences recognise extreme climate change of heatwaves, floods and droughts as threatening risks to the resilience and success of…

Abstract

Purpose

Recent United Nations Climate Change Conferences recognise extreme climate change of heatwaves, floods and droughts as threatening risks to the resilience and success of public–private partnership (PPP) infrastructure projects. Such conferences together with available project reports and empirical studies recommend project managers and practitioners to adopt smart technologies and develop robust measures to tackle climate risk exposure. Comparatively, artificial intelligence (AI) risk management tools are better to mitigate climate risk, but it has been inadequately explored in the PPP sector. Thus, this study aims to explore the tools and roles of AI in climate risk management of PPP infrastructure projects.

Design/methodology/approach

Systematically, this study compiles and analyses 36 peer-reviewed journal articles sourced from Scopus, Web of Science, Google Scholar and PubMed.

Findings

The results demonstrate deep learning, building information modelling, robotic automations, remote sensors and fuzzy logic as major key AI-based risk models (tools) for PPP infrastructures. The roles of AI in climate risk management of PPPs include risk detection, analysis, controls and prediction.

Research limitations/implications

For researchers, the findings provide relevant guide for further investigations into AI and climate risks within the PPP research domain.

Practical implications

This article highlights the AI tools in mitigating climate crisis in PPP infrastructure management.

Originality/value

This article provides strong arguments for the utilisation of AI in understanding and managing numerous challenges related to climate change in PPP infrastructure projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 February 2024

Ozan Okudan, Gökhan Demirdöğen and Zeynep Işık

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also…

Abstract

Purpose

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also investigates how to select the most convenient infrastructure project for suspension.

Design/methodology/approach

The proposed framework includes an extensive set of factors and a novel comparison mechanism that can reveal the most convenient infrastructure project to be suspended. A comprehensible literature review and focus group discussion (FGD) sessions were conducted to identify factors that should be considered for suspension. Then, the neutrosophic analytic hierarchy process (N-AHP) method was used to determine the relative importance of the factors. Finally, the proposed comparison mechanism was demonstrated through a hypothetical case study and Technique for order of preference by similarity to ideal solution (TOPSIS) analysis.

Findings

Results showed that suspension decisions cannot be made merely based on “financial” factors. Instead, the other aspects, namely “Technical and managerial” and “Social and Environmental”, should also be taken into consideration. Second, factors related to the initial investment, cost of refinancing, cash flow, permits and approvals, insufficiency of bidders, degradation of the components, reputation, impact on stakeholders and criticality of the infrastructure were particularly elaborated as the most significant, needing the utmost attention of the decision-makers. Lastly, the results demonstrated that the proposed comparison mechanism has considerable potential to identify the most convenient infrastructure project for suspension.

Originality/value

Public infrastructure projects are often under pressure due to the inflationary state and economic stagnation of countries after major crises. The suspension decision for infrastructure projects necessitates comprehensible assessments to consider all consequences. Studies have widely investigated the contractual and legal aspects of project suspension in light of existing literature. However, little effort has been devoted to identifying the factors that decision-makers should consider before suspending a particular infrastructure project. Furthermore, existing literature does not investigate how to select the most convenient infrastructure project for suspension either. Thus, by developing a specific suspension framework for infrastructure projects by considering various factors, this study is the earliest attempt to examine the contract suspension mechanism of public infrastructure projects. In this respect, the study significantly contributes to the theory of contract management domain and has important managerial implications.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 27 February 2024

Maryam R. Nezami, Mark L.C. de Bruijne, Marcel J.C.M. Hertogh and Hans L.M. Bakker

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern…

Abstract

Purpose

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern infrastructures, requiring close collaboration of various infrastructure owners. To effectively manage and improve inter-organizational collaboration (IOC) in infrastructure construction projects, collaboration status should be assessed continually. This study identifies the assessment criteria, forming the foundation of a tool for assessing the status of IOC in interconnected infrastructure projects.

Design/methodology/approach

A systematic literature study and in-depth semi-structured interviews with practitioners in interconnected infrastructure construction projects in the Netherlands are performed to identify the criteria for assessing the status of IOC in infrastructure construction projects, based on which an assessment tool is developed.

Findings

The identified assessment criteria through the literature and the practitioner’s perspectives results in the designing and development of a collaboration assessment tool. The assessment tool consists of 12 criteria and 36 sub-criteria from three different categories of collaborative capacity: individual, relational, and organizational.

Originality/value

The assessment tool enables practitioners to monitor the status of IOC between infrastructure owners and assists them in making informed decisions to enhance collaboration. The assessment tool provides the opportunity to assess and analyze the status of collaboration based on three categories (i.e., individual, relational, and organizational).

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 December 2023

Isaac Akomea-Frimpong, Xiaohua Jin, Robert Osei Kyei, Portia Atswei Tetteh, Roksana Jahan Tumpa, Joshua Nsiah Addo Ofori and Fatemeh Pariafsai

The application of circular economy (CE) has received wide coverage in the built environment, including public-private partnership (PPP) infrastructure projects, in recent times…

Abstract

Purpose

The application of circular economy (CE) has received wide coverage in the built environment, including public-private partnership (PPP) infrastructure projects, in recent times. However, current studies and practical implementation of CE are largely associated with construction demolition, waste and recycling management. Few studies exist on circular models and success factors of public infrastructures developed within the PPP contracts. Thus, the main objective of this article is to identify the models and key success factors associated with CE implementation in PPP infrastructure projects.

Design/methodology/approach

A systematic review of the literature was undertaken in this study using forty-two (42) peer-reviewed journal articles from Scopus, Web of Science, Google Scholar and PubMed.

Findings

The results show that environmental factors, sustainable economic growth, effective stakeholder management, sufficient funding, utilization of low-carbon materials, effective supply chain and procurement strategies facilitate the implementation of CE in PPP infrastructure projects. Key CE business models are centered around the extension of project life cycle value, circular inputs and recycling and reuse of projects.

Research limitations/implications

Although the study presents relevant findings and gaps for further investigations, it has a limited sample size of 42 papers, which is expected to increase as CE gain more prominence in PPP infrastructure management in future.

Practical implications

The findings are relevant for decision-making by PPP practitioners to attain the social, economic and environmental benefits of transitioning to circular infrastructure management.

Originality/value

This study contributes to articulating the key models and measures toward sustainable CE in public infrastructure development.

Details

Built Environment Project and Asset Management, vol. 14 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 27 January 2022

Jones Nyame Aboagye, Ernest Kissi, Alex Acheampong and Edward Badu

This research aims to evaluate the status of project management best practices in the road infrastructure sector of Ghana through the inquiry of project managers’ competency.

Abstract

Purpose

This research aims to evaluate the status of project management best practices in the road infrastructure sector of Ghana through the inquiry of project managers’ competency.

Design/methodology/approach

Based on a thorough literature review on competency and project management best practices, a criterion for measuring best practices based on the competencies was identified. Using closed-ended questionnaires as a survey instrument, data was collected and analyzed using a one-sample t-test, Kendall’s concordance coefficient and simple regression.

Findings

The key finding reveals that in achieving project management best practices for the Ghanaian road infrastructure projects, project managers should straighten and strengthen their capability in terms of skills, personal characteristics and knowledge as ranked. An appropriate blend of these characteristics would be a necessary requirement for project managers. Through this, project managers and project-based road infrastructure organizations will be able to win the confidence of their stakeholders and attain improvements in cost-effectiveness, quality and time management.

Research limitations/implications

This study provides project managers in the road infrastructure sector with relevant information on which criteria and variables are critical and are frequently required to manage such projects. This will be helpful for training programs and professional development of project managers in the road infrastructure sector.

Originality/value

The study provides a new direction and focuses for project managers in the road infrastructure industry toward best project management practices in developing countries. It also complements existing studies in this area which deepen the understanding of the subject area.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 16 February 2024

M.K.S. Al-Mhdawi, Alan O'connor, Abroon Qazi, Farzad Rahimian and Nicholas Dacre

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Abstract

Purpose

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Design/methodology/approach

In this research, a three-step systematic literature review methodology was employed to analyse 55 selected articles on Critical Infrastructure Risks (CIRs) from well-regarded and relevant academic journals published from 2011 to 2023.

Findings

The findings highlight a growing research focus on CIRs from 2011 to 2023. A total of 128 risks were identified and grouped into ten distinct categories: construction, cultural, environmental, financial, legal, management, market, political, safety and technical risks. In addition, literature reviews combined with questionnaire surveys were more frequently used to identify CIRs than any other method. Moreover, oil and gas projects were the subjects most often explored in the reviewed papers. Furthermore, it was observed that publications from Iran, the USA and China dominated CIRs research, making significant contributions, accounting for 49.65% of the analysed articles.

Research limitations/implications

This research specifically focuses on five types of CIPs (i.e. roadways, bridges, water supply systems, dams and oil and gas projects). Other CIPs like cyber-physical systems or electric power systems, were not considered in this research.

Practical implications

Governments and contracting firms can benefit from the findings of this study by understanding the significant risks associated with the execution of CIPs, irrespective of the nation, industry or type of project. The results of this investigation can offer construction professionals valuable insights to formulate and implement risk response plans in the early stages of a project.

Originality/value

As a novel literature review related to CIRs, it lays the groundwork for future research and deepens the understanding of the multi-faceted effects of these risks, as well as sets practical response strategies.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 13 June 2023

Rubaya Rahat, Piyush Pradhananga and Mohamed ElZomor

With the increasing demand for sustainable developments, higher education should focus on teaching both sustainable buildings and infrastructure systems. This study aims to…

Abstract

Purpose

With the increasing demand for sustainable developments, higher education should focus on teaching both sustainable buildings and infrastructure systems. This study aims to investigate the existing sustainable infrastructure (SI) teaching efforts in sustainability courses; identify best practices to integrate SI throughout bachelor’s and master’s programs under the construction management (CM) curricula; and propose guidelines for students to obtain Envision sustainability professional (ENV SP) credential during sustainability education.

Design/methodology/approach

This study conducted keywords search within the sustainability course descriptions under the American Council for Construction Education accredited CM curricula to locate SI topics. Additionally, this research collected inputs from the Envision Academic Committee members to develop a matrix representing the best practices for integrating SI in higher education and provided a guide with a step-by-step procedure to obtain ENV SP credentials.

Findings

This study identified a gap regarding the availability of SI education and offered best practices on how CM curricula might nurture such knowledge. Phase I highlighted that only two CM programs taught infrastructure sustainability, and three programs offered sustainability credentialing processes under a bachelor’s degree. Phase II developed a framework that offered a variety of pedagogical approaches and outlined the process for obtaining the ENV SP certificate for CM students in the freshman, sophomore, junior and senior years.

Originality/value

The findings of this study can facilitate CM education to create awareness among the future workforce and encourage them to establish skills pertaining to the economic, social and environmental implications while designing SI.

Details

International Journal of Sustainability in Higher Education, vol. 24 no. 8
Type: Research Article
ISSN: 1467-6370

Keywords

Article
Publication date: 6 February 2024

Luwei Zhao, Qing’e Wang, Bon-Gang Hwang and Alice Yan Chang-Richards

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification…

Abstract

Purpose

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification (MICMAC) to investigate the influencing factors of sustainable infrastructure vulnerability (SIV).

Design/methodology/approach

(1) Literature review and case study were used to identify the possible influencing factors; (2) a semi-structured interview was conducted to identify representative factors and the interrelationships among influencing factors; (3) ISM was adopted to identify the hierarchical structure of factors; (4) MICMAC was used to analyze the driving power (DRP) and dependence power (DEP) of each factor and (5) Semi-structured interview was used to propose strategies for overcoming SIV.

Findings

Results indicate that (1) 18 representative factors related to SIV were identified; (2) the relationship between these factors was divided into a five-layer hierarchical structure. The 18 representative factors were divided into driving factors, dependent factors, linkage factors and independent factors and (3) 12 strategies were presented to address the negative effects of these factors.

Originality/value

The findings illustrate the factors influencing SIV and their hierarchical structures, which can benefit the stakeholders and practitioners of an infrastructure project by encouraging them to take effective countermeasures to deal with related SIVs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 4000