Search results

1 – 10 of 223
Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 3 April 2024

Michael Nii Addy, Evans Teye Addo, Sulemana Fatoama Abdulai, Titus Ebenezer Kwofie, Clinton Ohis Aigbavboa and Anita Odame Adade-Boateng

E-procurement has the advantage of improving the overall performance of construction project delivery. The purose of this study is to uncover the factors influencing e-procurement…

Abstract

Purpose

E-procurement has the advantage of improving the overall performance of construction project delivery. The purose of this study is to uncover the factors influencing e-procurement acceptance in the public sector of Ghana’s construction industry (GCI). Using an extended unified theory of acceptance and use of technology (UTAUT 2), variables that promote the acceptance of e-procurement in GCI were explored.

Design/methodology/approach

Data was collected using a mixed method strategy. In the first stage, a semi-structured interview was used to collect, assess and optimize the UTAUT2 model. Thematic analysis was used on the qualitative data, leading to modification of the proposed UTAUT2 model. The study subsequently used a questionnaire survey using the extended UTAUT2 model. Survey data was analyzed using structural equation modelling (SEM), leading to the identification and validation of factors that facilitate e-procurement acceptance in Ghanaian construction as well as the impact of these factors.

Findings

The findings of the study reveal that five independent constructs of the proposed UTAUT2 model significantly affects the behavioural intention of practitioners to accept and use e-procurement in the construction industry in Ghana.

Practical implications

The study will be of utility to government agencies, contracting organizations and other construction stakeholders in developing policy and programmes to support e-procurement acceptance within the sector.

Originality/value

This is a new extended UTAUT2 model that is applicable to technology acceptance within the public sector in sub-Saharan Africa.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 28 May 2024

Christopher Amoah

The South African Government announced the black economic empowerment (BEE) legislation in 2003 in the public procurement systems. The legislation was deemed a catalyst for the…

Abstract

Purpose

The South African Government announced the black economic empowerment (BEE) legislation in 2003 in the public procurement systems. The legislation was deemed a catalyst for the emancipation of the previously disadvantaged citizens due to the apartheid government policies that secluded them from economic activities. This study aims to explore the challenges of black construction professionals with the BEE as a procurement policy.

Design/methodology/approach

This study adopted a qualitative research approach. Thirty-five black construction professionals were contacted for interviews, of which 21 responded. Due to the COVID-19 restriction, participants were interviewed using telephone interview techniques. The information received was analysed using the thematic contents analysis method.

Findings

The findings revealed the challenges confronting black construction professionals regarding the BEE policy as corrupt practices (leading to the award of contracts to unqualified people), fronting of contractors and individuals for unqualified firms, preventing the participation of experienced and foreign firms, poor policy implementation with no monitoring mechanism and loss of tender due to strict requirements.

Social implications

Urgent attention is needed to review the BEE policy implementation process by the South African government to address the challenges enumerated by the policy beneficiaries to ensure the achievement of the policy objectives.

Originality/value

This study has identified the challenges of the BEE policy; thus, the government can institute measures to address the hindrances thwarting the beneficiaries from realising the policy objectives.

Details

Journal of Public Procurement, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1535-0118

Keywords

Article
Publication date: 16 May 2024

Oscar Kwame Kwasafo, Emmanuel Adinyira and Kofi Agyekum

This paper investigates the impact of green construction procurement practices (GCPPs) on circular economy (CE) success by identifying environmentally sustainable procurement…

Abstract

Purpose

This paper investigates the impact of green construction procurement practices (GCPPs) on circular economy (CE) success by identifying environmentally sustainable procurement practices that can promote a CE in the construction industry. The goal was to promote circularity in construction through GCPPs.

Design/methodology/approach

A quantitative research approach was adopted and purposively selected 100 respondents for a cross-sectional questionnaire survey. Data from the questionnaire survey were analysed using mean score ranking, One-sample t-test and regression analysis.

Findings

The study found that using on-site systematic waste management, project stakeholder commitment and support for green practices and environmental requirements in technical specifications, significantly impact CE success in construction, with a 12.8% variance in CE when green procurement is practised. This implies that GCPPs have positive repercussions on CE success, where the CE success is expected to change as GCPPs levels increase.

Practical implications

The study provides insights into green procurement, promoting its use in infrastructure development and aiding clients, particularly in the government sector with insights into the challenges and practices involved in green procurement. Practitioners can also benefit from better implementing CE strategies to draft and manage contracts for infrastructure projects that prioritize circularity.

Originality/value

The limited impact of GCPPs on advancing CE principles in construction suggests policy and practice must strengthen procurement requirements to fully leverage spending and drive the sector’s transition towards a circular model. Also, novel insight is provided into the most effective types of GCPPs for promoting CE success, aiding policymakers in optimizing construction procurement strategies.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 21 May 2024

Chelteau Barajei, Emmanuel Bamfo-Agyei, Prince Antwi-Agyei, Musah Osumanu Doumbia and Mac Nyameche

The procurement reforms carried out by the Government of Ghana have led to the creation of the Public Procurement Authority and the passage of the Public Procurement (Amended) Act…

Abstract

Purpose

The procurement reforms carried out by the Government of Ghana have led to the creation of the Public Procurement Authority and the passage of the Public Procurement (Amended) Act 2016. Nevertheless, many obstacles could prevent an open and fair competition during the procurement of works. This significantly affects the success of Ghanaian construction projects. Therefore, this paper aims to explore the factors to enhance the success of the contractor selection phase of the Ghanaian public labor-based construction project.

Design/methodology/approach

A quantitative research approach was adopted by this study. Data was collected through a self-administered questionnaire to 377 respondents across Ghana. The data was then analyzed using structural equation modeling.

Findings

This study revealed that external, project procedures and project management factors impact the Ghanaian labor-based contractor selection phase success.

Research limitations/implications

This study is limited to the contractor selection phase of Ghanaian public labor-based projects and developing nations with similar socioeconomic characteristics.

Social implications

Strict adherence to this study’s findings will enable the government to undertake more infrastructure projects to raise the standard of living for its populace.

Originality/value

Although several studies have been conducted to improve the success of construction projects in developing nations, very little focus has been placed on the success factors of the contractor selection phase of public construction projects. These findings are vital in discovering for the first-time factors influencing the success of the tender stage of public labor-based projects in Ghana and developing nations with similar socioeconomic characteristics.

Details

Journal of Public Procurement, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1535-0118

Keywords

Open Access
Article
Publication date: 19 April 2024

Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…

Abstract

Purpose

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.

Design/methodology/approach

The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.

Findings

The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.

Practical implications

The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.

Originality/value

This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.

Details

LBS Journal of Management & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-8031

Keywords

Article
Publication date: 22 March 2024

Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…

Abstract

Purpose

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.

Design/methodology/approach

Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.

Findings

Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.

Originality/value

The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 15 April 2024

Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…

Abstract

Purpose

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.

Design/methodology/approach

The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.

Findings

The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.

Originality/value

This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 May 2024

Terence Y.M. Lam and Keith S. Gale

Construction framework agreements are identified by the UK Government’s Construction Strategy 2025 as an integrated procurement path to improve construction industry efficiency…

Abstract

Purpose

Construction framework agreements are identified by the UK Government’s Construction Strategy 2025 as an integrated procurement path to improve construction industry efficiency. However, criticisms from the industry have arisen from the lack of transparency and incorrect application of such frameworks. This paper aims to examine the client and supplier relationships within a framework agreement to discover what behaviour change drivers should be applied in the framework process to achieve the desired project outcomes.

Design/methodology/approach

A triangulation approach was adopted. An initial literature review on organisational behaviour and job performance theories was conducted followed by a qualitative expert review survey of client construction managers to confirm the project outcomes desired by public-sector clients and the associated behaviour change drivers. This was followed by a qualitative multiple-case study investigation of eight typical framework projects to form a commonality of views to explain the impact of behaviour change drivers on project outcomes.

Findings

Results from both qualitative studies demonstrated that improvements in project outcomes of time, cost, quality, sustainability and closer relationships can be driven by two sets of behaviour drivers: client organisational behaviour change drivers (setting up incentive and risk-sharing procurement approach, effective communication through development of stronger relationships and performance monitoring using contract key performance indicators) and supplier contextual behaviour change drivers (motivating conscientious behaviour and attitude towards self-improvement and innovations, supporting shared culture of providing services aligning with the client needs, promoting learning and development amongst all suppliers and most importantly providing trust and collaboration to the client).

Research limitations/implications

The investigation was based on an expert review with eight multiple-case studies conducted within the geographical area of England. Further research should be conducted nationwide so that the findings can become more robust and benefit the entire public sector.

Practical implications

It is suggested that framework managers should apply the supplier contextual performance drivers as selection criteria in the procurement process, whilst the client organisational performance drivers should be applied in the whole procurement and construction monitoring process to drive project outcomes aligned with the government construction policy objectives.

Originality/value

This research demonstrates that the project behaviour of clients and suppliers can be shifted within the construction framework environment to yield the desired project outcomes. This can be achieved by applying the client organisational behaviour drivers and the supplier contextual behaviour change drivers in tandem to optimise the framework process.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 30 April 2024

Elaine Pinto Varela Alberte and Gabriel de Oliveira Novelli

This paper aims to analyze practices, processes and outcomes related to construction supply chain management (CSCM) in Brazil to identify opportunities and direct actions and…

Abstract

Purpose

This paper aims to analyze practices, processes and outcomes related to construction supply chain management (CSCM) in Brazil to identify opportunities and direct actions and strategies to improve the Brazilian sector through blockchain technology (BT).

Design/methodology/approach

The study collected empirical data through semi-structured interviews with consumers and distributors to identify how the CSCM functions today. The interviews were structured and analyzed around the following topics: processes, digitalization, quality and weakness of the activities performed. The opportunities for using BT in CSCM were identified by crossing these results with evidence in the bibliography.

Findings

The study identified deficiencies, gaps and good practices applied to information management in the sector. Also, it analyzed the features, drivers and barriers of BT from a practical perspective. The findings suggested that BT is feasible and promising, reducing costs and enhancing process transparency. The need to overcome cultural and economic barriers is a challenging task.

Originality/value

This study brings a new perspective on using BT in CSCM, relating it to the demands and particularities of the construction sector in Brazil. The study identifies a limited panorama of chronic CSCM concerns, given BT’s infinite opportunities. And it motivates a gradual transition toward installing a new technological culture based on BT that focuses on priority care for the sector’s chronic deficiencies. The results can guide practical actions for the successful insertion of BT in the CSCM, laying the foundations for significant future research.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Access

Year

Last 3 months (223)

Content type

Earlycite article (223)
1 – 10 of 223