Search results

1 – 10 of 24
Open Access
Article
Publication date: 23 January 2024

Luís Jacques de Sousa, João Poças Martins, Luís Sanhudo and João Santos Baptista

This study aims to review recent advances towards the implementation of ANN and NLP applications during the budgeting phase of the construction process. During this phase…

Abstract

Purpose

This study aims to review recent advances towards the implementation of ANN and NLP applications during the budgeting phase of the construction process. During this phase, construction companies must assess the scope of each task and map the client’s expectations to an internal database of tasks, resources and costs. Quantity surveyors carry out this assessment manually with little to no computer aid, within very austere time constraints, even though these results determine the company’s bid quality and are contractually binding.

Design/methodology/approach

This paper seeks to compile applications of machine learning (ML) and natural language processing in the architectural engineering and construction sector to find which methodologies can assist this assessment. The paper carries out a systematic literature review, following the preferred reporting items for systematic reviews and meta-analyses guidelines, to survey the main scientific contributions within the topic of text classification (TC) for budgeting in construction.

Findings

This work concludes that it is necessary to develop data sets that represent the variety of tasks in construction, achieve higher accuracy algorithms, widen the scope of their application and reduce the need for expert validation of the results. Although full automation is not within reach in the short term, TC algorithms can provide helpful support tools.

Originality/value

Given the increasing interest in ML for construction and recent developments, the findings disclosed in this paper contribute to the body of knowledge, provide a more automated perspective on budgeting in construction and break ground for further implementation of text-based ML in budgeting for construction.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 12 September 2023

Pramod Malaka Silva, Niluka Domingo and Noushad Ali Naseem Ameer Ali

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous…

Abstract

Purpose

The construction industry is complex, human-intensive and driven by monetary values. Hence, disputes are widespread. Initial conflicts among parties may develop into a disastrous dispute that costs the project success and good relationships and affects stakeholders' expectations. There has been a focus on causes of construction-related disputes, and studies over the past three decades have attempted to identify a more comprehensive list of reasons for disputes. Some of these studies' limitations were geographical, project delivery methods and project types. The purpose of this study is to identify the most recent and conclusive list of causes of disputes based on current literature by undertaking a systematic literature review (SLR).

Design/methodology/approach

Considering the large number of studies that focused on causes of disputes, this study aims to develop a comprehensive list of causes, using a SLR, as it ensures that all previous articles in multiple databases are reviewed to produce a comprehensive outcome. A six-stage SLR was followed from background study to analysis and reporting.

Findings

Not surprisingly, the number of publications has increased over time, most from the Middle East region. The interconnected nature of the causes was widely emphasised. The SLR has produced eight common core causes of disputes. They are: poor contractual arrangements, employer-initiated scope changes, unforeseen site changes, poor contract understanding and administration, contractor’s quality of works, the inability of the contractor to achieve time targets, non- or delayed payments and poor quality of design. The majority of previous authors realised that disputes could be avoided by parties’ involvement during the early stages, avoiding being opportunistic and acting collaboratively.

Originality/value

Even though numerous studies have been carried out to identify the causes of disputes in the construction industry, none did a SLR. This study aggregates all the previous studies that focused on construction-related disputes systematically. Categorising causes based on the party primarily responsible help various stakeholders by providing a distinct list of factors to avoid that contribute to disputes.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 20 May 2024

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

Productivity increase is correlated with profitability, sustainability and competitiveness of the construction firms. Recent studies reveal that the primary causes of productivity…

Abstract

Purpose

Productivity increase is correlated with profitability, sustainability and competitiveness of the construction firms. Recent studies reveal that the primary causes of productivity decline are poor usage of scientific and technological advances, ineffective supervision strategies and poor apprenticeship facilities/opportunities. Accordingly, the purpose of this study was to evaluate how well construction supervisors can utilise fundamental science and technological concepts/ideas to increase the efficiency and productivity of construction activities.

Design/methodology/approach

A new strategic layout was designed with the use of potential training guide tools. Based on the designed layout, a new supervisory training programme was developed, and 62 construction supervisors were selected, trained and evaluated in line with six parts of competencies and the relevant learning domains. An assessment guide with different levels of descriptions and criteria was developed through literature analysis and expert interviews. The research tools were verified using comprehensive approaches.

Findings

The overall mean values of supervisors’ performance scores indicate proficient-level grades in the competency characteristics related to taking measurements, generating drawings/designs using manual techniques and computer-aided tools, involving Bill of Quantities (BOQ) preparations and preparing training plans/materials for improving the competencies of labourers on estimation, measurements and understanding drawings. Their proficiency was notably lower in the use of information and communication technology application tools in construction tasks compared to others. The findings point to a modern generalised guideline that establishes the ranges of supervisory attributes associated with science and technology-related applications.

Research limitations/implications

The study outcomes produce conceptualised projections to restructure and revalue the job functions of various working categories by adding new definitions within the specified scope. This may result in constructive benefits to upgrading the current functions associated with urbanisation, sustainability and society. The implementation of the study’s findings/conclusions will have a significant impact on present and future practices in other developing nations and developing industries, even if they are directly applicable to the Sri Lankan construction industry.

Originality/value

Up to certain limits/stages, the study fills not only the knowledge gap in the field of creating protocols and application techniques connected to lifelong learning and skill enhancement/upgrading but also the existing gaps in work attributes and roles of construction supervisors associated with the utilisation of fundamental science and technological concepts/ideas towards reinforcing sustainable and productive site operations.

Details

Urbanization, Sustainability and Society, vol. 1 no. 1
Type: Research Article
ISSN: 2976-8993

Keywords

Article
Publication date: 3 January 2023

Pengcheng Xiang, Xin Xia and Xianya Pang

The purpose of this paper is to develop a novel integrated risk assessment method from the system perspective to evaluate the risk of the cross-regional mega construction project…

Abstract

Purpose

The purpose of this paper is to develop a novel integrated risk assessment method from the system perspective to evaluate the risk of the cross-regional mega construction project (CMCP). Furthermore, this paper aims to confirm the core risk source factors and refine the risk management strategies of CMCPs through a case study.

Design/methodology/approach

Based on the analysis of the risk system of CMCPs, the concept model and risk assessment principles of integrated risk assessment were confirmed. The risk source factors and project objectives of the CMCP were identified from a literature review, export interview and case analysis. According to the vulnerability theory, the integrated risk assessment model was developed by involving vulnerabilities, threats, objectives and interaction of those factors synthetically. Then, ZW high-speed railway from China was analyzed to verify the feasibility and effectiveness of the proposed method.

Findings

As a result, 12 threat factors and 12 vulnerability factors were identified. Based on the case study, the main external threat comes from T13 (conflicts of interest between local governments) and T23 (harsh natural environment); the most easily exploited internal vulnerabilities were V11 (complexity of technology), V13 (lack of experience in technical application), V21 (inadequate experience) and V23 (lack of interest coordination mechanism). Moreover, the economic objective was most affected.

Practical implications

It is essential to develop an interest coordination mechanism for CMCPs. The harsh natural environment is a critical factor, but it also promotes technological innovation and iteration. Public opinions in different regions are critical for CMCPs, and more emphasis should be placed on public opinion surveys of CMCPs. Moreover, diverse and flexible environmental protection strategies should apply in CMCPs.

Originality/value

This research has the following three contributions. First, based on vulnerability theory, an integrated risk assessment approach of CMCPs is developed, which enriches the risk measurement method system and provides inspiration for future research on risk in the construction industry. Second, the risk sources of CMCPs are identified from the perspective of vulnerability and threat to provide clear guidance for the risk management of CMCPs. Third, the core risk source factors and management strategies confirmed by the case study will be beneficial for various governments in different regions and project managers to optimize the project management scheme, as they are transferable management experiences.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 March 2023

Mohammad Javad Zoleykani, Hamidreza Abbasianjahromi, Saeed Banihashemi, Seyed Amir Tabadkani and Aso Hajirasouli

Extended reality (XR) is an emerging technology, with its popularity rising in different industry sectors, where its application has been recently considered in construction…

Abstract

Purpose

Extended reality (XR) is an emerging technology, with its popularity rising in different industry sectors, where its application has been recently considered in construction safety. This study aims to investigate the applications of XR technologies in the safety of construction through projects lifecycle perspective.

Design/methodology/approach

Scientometric analysis was conducted to discover trends, keywords, contribution of countries and publication outlets in the literature. The content analysis was applied to categorize previous studies into three groups concerning the phase of lifecycle in which they used XR.

Findings

Results of the content analysis showed that the application of XR in the construction safety is mostly covered in two areas, namely, safety training and risk management. It was found that virtual reality was the most used XR tool with most of its application dedicated to safety training in the design phase. The amount of research on the application of augmented reality and mixed reality in safety training, and risk management in all phases of lifecycle is still insignificant. Finally, this study proposed three main areas for using the XR technologies regarding the safety issues in future research, namely, control of safety regulations and safety coordination in construction phase, and safety reports in the operation phase.

Originality/value

This paper inspected the utilization of all types of XR for safety in each phase of construction lifecycle and proposed future directions for research by addressing the safety challenges in each phase.

Details

Construction Innovation , vol. 24 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 27 December 2022

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and Eric Asamoah

The demand for power has surged in recent times and continues to increase yearly. In comparison to developed countries, the power industry’s risks, especially in piblic–private…

Abstract

Purpose

The demand for power has surged in recent times and continues to increase yearly. In comparison to developed countries, the power industry’s risks, especially in piblic–private partnership (PPP) projects, are more complex and essential in developing countries. Appreciating the inter relationship among these risk factors is crucial. However, there exist no studies developing quantitative models to explain how various PPP power risk factors influence each other, especially in developing countries like Ghana. This study aims to investigate and model the relationship, the probability of occurrence and severity of impact of PPP power risk factors in Ghana.

Design/methodology/approach

Data were collected through ranking type questionnaire in a two-round Delphi survey with 48 respondents using purposive and snowball sampling techniques. partial least squares structural equation modelling (PLS-SEM) was used for analysis of data.

Findings

A model was developed to investigate the influence the risk factors inherent in PPP power projects have on each other. Validity of the model was tested based on the data collected. PLS-SEM results indicated the various relationships and interdependencies the risk factors had on each other considering their probability and severity. Both significant and insignificant levels of relationships were found among the various risk factors.

Practical implications

The SEM that was developed to assess the relationships among the risk factors has great value for policy makers in the energy sector, industry practitioners, researchers and industry practitioners. Strategies can be mapped out to mitigate and effectively allocate the risks with the high interdependencies.

Originality/value

Regarding the quantitative impact of the interrelationship among risk factors in PPP power projects, the findings of this research are arguably the first to be presented for the construction sector and contribute to knowledge on PPP practice and further has implications toward achieving power sector risk mitigation.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 January 2023

Seyed Ashkan Zarghami

This paper offers a measure of sensitivity to change orders in the later stage of the construction phase to characterize the distribution of project activities around the time…

Abstract

Purpose

This paper offers a measure of sensitivity to change orders in the later stage of the construction phase to characterize the distribution of project activities around the time when the project is scheduled to finish.

Design/methodology/approach

This paper employs eigenvector centrality to identify the sensitivity of an activity to change orders based on the sensitivity of its neighboring activities. Next, a distance-based measure, called the radius of gyration, is adopted to describe the distribution of project activities around the time when the project is scheduled to finish. Finally, a sensitivity measure, which quantifies the dispersion of project activities from the project finish date, is developed.

Findings

Two real-life construction projects are used to measure the sensitivity to late changes. The results conform to the intuition of sensitivity to late changes and confirm that the negative effects of change orders are amplified when project activities are scheduled to start closer to the finish date.

Originality/value

This paper adds to the literature on change orders in construction projects by developing the first method for quantifying the sensitivity of projects to the issuance of late changes. The proposed method can provide valuable information to project owners and construction managers as they negotiate the pricing of change orders based on their time of occurrence.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 May 2022

Emmanuel Asare, De-Graft Owusu-Manu, Joshua Ayarkwa and David John Edwards

The concept of working capital management (WCM) has been a fundamental financial accounting term that has evolved in financial theory for centuries. Given that the construction…

Abstract

Purpose

The concept of working capital management (WCM) has been a fundamental financial accounting term that has evolved in financial theory for centuries. Given that the construction industry (CI) is financially dynamic, there is an imperative need to understand its WCM practices. The call for the industry players to adhere to efficient financial management practices as a result of a huge financing gap requires consented effort. This study aims to explore the trend of practices of WCM in the CI and elicit a broader polemic dialogue about this crucial theme.

Design/methodology/approach

The source of information for the study was secondary mainly from referenced journals and international conference papers published on WCM relating to the CI. A three-step sample selection strategy was adopted to identify the range and scope of publications on WCM in the CI based on the systematic literature review method.

Findings

The CI cannot boost of enough empirical WCM research to gain in-depth understanding of its practical trend. The developing economies are failing to produce insightful peer-reviewed papers on WCM to assist in bridging the infrastructural financing gap through apposite strategies. Gaining appropriate knowledge of the short-term financial operations through a conceptualization of WCM practices in the CI may lead to better strategies formulated for smooth operations.

Originality/value

This is a pioneering paper in developing economies that have taken stock of WCM knowledge of the practical trend in the CI. Future research prospects in which WCM matters can use it as a reference point.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 13 October 2022

Neil Govender, Samuel Laryea and Ron Watermeyer

Construction projects require a range of documents (e.g. drawings and specifications) prepared by built environment professionals. In recent years, there has been a perception…

Abstract

Purpose

Construction projects require a range of documents (e.g. drawings and specifications) prepared by built environment professionals. In recent years, there has been a perception amongst professionals that quality of documentation has declined. “Low” professional fees were cited as one of the reasons for poor quality documentation. However, most studies on the topic contained inappropriate methodologies. Therefore, the purpose of this paper was to develop a conceptual methodology to comprehensively examine the relationship between fees and professional service output quality.

Design/methodology/approach

A systematic literature review (SLR) was conducted to evaluate the limitations of previous methodologies and identify variables in the relationship between fees and quality of professional service outputs. Findings from the SLR were used to develop a conceptual methodology to investigate the relationship between fees and quality of professional service outputs.

Findings

Based on a frequency analysis of factors in the construction literature, the three main variables influencing professional service output quality were fees, coordination and amount of time available for project tasks. The SLR and shortcomings in previous studies informed the development of a conceptual methodology to examine the relationship between fees and professional service output quality.

Practical implications

The conceptual methodology will assist in comprehensively investigating the effect of fees on the quality of professional service outputs. This is particularly relevant in countries where clients procure built environment professional services based on the lowest fee tendered but are concerned about quality. The methodology can establish how and to what extent “low” fees impact on professional service output quality. Industry professionals can also use variables identified in this paper to mitigate quality-related risks when producing professional service outputs.

Originality/value

This paper adds to the body of knowledge by identifying variables in the relationship between fees and professional service output quality. The identified variables can be monitored and controlled by researchers during future investigations. Additionally, a conceptual methodology was proposed to assist researchers to determine the effect of fees on professional service output quality. The flexibility of the conceptual methodology enables it to comprehensively investigate other key variables (apart from fees) impacting on professional service output quality.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 10 January 2023

Zezhou Wu, Kaijie Yang, Zhangmin Wu, Hong Xue, Shenghan Li and Maxwell Fordjour Antwi-Afari

Prefabricated construction is an innovative technique for decreasing carbon emissions in the construction industry. However, as the investors of housing projects, a majority of…

Abstract

Purpose

Prefabricated construction is an innovative technique for decreasing carbon emissions in the construction industry. However, as the investors of housing projects, a majority of developers are unwilling to adopt prefabricated housing in practice. To promote prefabricated housing, this study aims to develop an integrated framework of fuzzy-decision making trial and evaluation laboratory (fuzzy-DEMATEL) and system dynamics (SD) to understand the underlying influencing mechanism of developers' willingness.

Design/methodology/approach

Through literature review, a total of 17 influencing factors were identified. Then, the interrelationships among the factors were evaluated by 10 experienced professionals, and the impacts given and received by each factor were further analyzed through fuzzy-DEMATEL. Based on the technology acceptance model (TAM), a SD model was developed to explore the influencing mechanism.

Findings

The major cause factors were identified, including mandatory implementation policies, economic incentive policies, environmental protection policies, component standardization and developers' economic strength. This group of factors was expected to be given priority attention in the case of limited resources. On the other hand, the results indicated that economic incentive policies and mandatory implementation policies could affect the developers' willingness via perceived usefulness, while the others mainly influenced perceived ease of use.

Originality/value

Little research has focused on the interrelationships among the influencing factors of developers' willingness to adopt prefabricated housing. This study contributed to understanding the mechanism of developers' willingness from a systematic view and providing the priority of influencing factors. Several strategies were proposed to improve the practical implementation of prefabricated housing development.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Access

Year

Last week (24)

Content type

Article (24)
1 – 10 of 24