Article
Publication date: 3 January 2023

Pengcheng Xiang, Xin Xia and Xianya Pang

The purpose of this paper is to develop a novel integrated risk assessment method from the system perspective to evaluate the risk of the cross-regional mega construction project

Abstract

Purpose

The purpose of this paper is to develop a novel integrated risk assessment method from the system perspective to evaluate the risk of the cross-regional mega construction project (CMCP). Furthermore, this paper aims to confirm the core risk source factors and refine the risk management strategies of CMCPs through a case study.

Design/methodology/approach

Based on the analysis of the risk system of CMCPs, the concept model and risk assessment principles of integrated risk assessment were confirmed. The risk source factors and project objectives of the CMCP were identified from a literature review, export interview and case analysis. According to the vulnerability theory, the integrated risk assessment model was developed by involving vulnerabilities, threats, objectives and interaction of those factors synthetically. Then, ZW high-speed railway from China was analyzed to verify the feasibility and effectiveness of the proposed method.

Findings

As a result, 12 threat factors and 12 vulnerability factors were identified. Based on the case study, the main external threat comes from T13 (conflicts of interest between local governments) and T23 (harsh natural environment); the most easily exploited internal vulnerabilities were V11 (complexity of technology), V13 (lack of experience in technical application), V21 (inadequate experience) and V23 (lack of interest coordination mechanism). Moreover, the economic objective was most affected.

Practical implications

It is essential to develop an interest coordination mechanism for CMCPs. The harsh natural environment is a critical factor, but it also promotes technological innovation and iteration. Public opinions in different regions are critical for CMCPs, and more emphasis should be placed on public opinion surveys of CMCPs. Moreover, diverse and flexible environmental protection strategies should apply in CMCPs.

Originality/value

This research has the following three contributions. First, based on vulnerability theory, an integrated risk assessment approach of CMCPs is developed, which enriches the risk measurement method system and provides inspiration for future research on risk in the construction industry. Second, the risk sources of CMCPs are identified from the perspective of vulnerability and threat to provide clear guidance for the risk management of CMCPs. Third, the core risk source factors and management strategies confirmed by the case study will be beneficial for various governments in different regions and project managers to optimize the project management scheme, as they are transferable management experiences.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An and Xueying Bao

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects

Abstract

Purpose

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.

Design/methodology/approach

This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.

Findings

The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.

Originality/value

The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 May 2020

Li Ma and Hongwei Fu

Understanding the impact of project complexity on the mega construction project success will help improve the efficiency of project management. However, the influencing mechanism…

1905

Abstract

Purpose

Understanding the impact of project complexity on the mega construction project success will help improve the efficiency of project management. However, the influencing mechanism of project complexity on project success has not been clearly depicted. This paper aims to divide project complexity and project success into five dimensions, trying to explore the impact of different complexity combinations on mega construction project success.

Design/methodology/approach

This study applies the qualitative comparative analysis (QCA) method to find out the impact of the combinations of different project complexities on the every dimension of mega construction project success. First, 21 cases were interviewed and scored in five categories of project complexities and five aspects of project success. Second, with the QCA program, the combinations of different project complexities influencing every aspect of mega construction project success was obtained.

Findings

This research found that high organizational complexity or a combination of high environmental complexity and goal complexity can lead to serious schedule delays of mega construction projects, high technological complexity and goal complexity are important reasons for cost overrun, high technological complexity or a combination of high environmental complexity and low organizational complexity usually lead to low quality of mega construction projects, high goal complexity and cultural complexity are important factors affecting the key stakeholders' satisfaction and high technological complexity and environmental complexity are the reasons for the poor sustainability of mega construction projects.

Originality/value

This study clearly reveals the influencing mechanism of project complexity on mega construction project success, which can help the project managers to understand and assess the complexity of mega construction projects and accurately predict their negative impacts on the mega construction projects.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 May 2023

Minggong Zhang, Xiaolong Xue, Ting Luo, Mengmeng Li and Xiaoling Tang

This study aims to establish an evaluation method for cross-regional major infrastructure project (CRMIP) supportability. The focus is to identify evaluation indicators from a…

Abstract

Purpose

This study aims to establish an evaluation method for cross-regional major infrastructure project (CRMIP) supportability. The focus is to identify evaluation indicators from a complexity perspective and develop an evaluation model using qualitative and quantitative methods. Case studies are carried out to verify the reliability of the evaluation model, thereby providing theoretical and practical guidance for CRMIP operations and maintenance (O&M).

Design/methodology/approach

Guided by the idea of complexity management, the evaluation indicators of CRMIP supportability are determined through literature analysis, actual O&M experience and expert interviews. A combination of qualitative and quantitative methods, consisting of sequential relationship analysis, entropy weighting, game theory and cloud model, is developed to determine the indicator weights. Finally, the evaluation model is used to evaluate the supportability of the Hong Kong–Zhuhai–Macao Bridge (HZMB), which tests the rationality of the model and reveals its supportability level.

Findings

The results demonstrate that CRMIPs' supportability is influenced by 6 guideline-level and 18 indicator-level indicators, and the priority of the influencing factors includes “organization,” “technology,” “system,” “human resources,” “material system,” and “funding.” As for specific indicators, “organizational objectives,” “organizational structure and synergy mechanism,” and “technical systems and procedures” are critical to CRMIPs' O&M supportability. The results also indicate that the supportability level of the HZMB falls between good and excellent.

Originality/value

Under the guidance of complexity management thinking, this study proposes a supportability evaluation framework based on the combined weights of game theory and the cloud model. This study provides a valuable reference and scientific judgment for the health and safety of CRMIPs' O&M.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 August 2023

Yuying Wang and Guohua Zhou

As the complexity and uncertainty of megaprojects make it difficult for traditional management models to address the difficulties, this paper aims to design a performance…

Abstract

Purpose

As the complexity and uncertainty of megaprojects make it difficult for traditional management models to address the difficulties, this paper aims to design a performance incentive contract through IT applications, thereby promoting the formation of an information-based governance mechanism for megaprojects and facilitating the transformation and upgrading of the construction management model of megaprojects to informatisation.

Design/methodology/approach

This paper introduced IT applications into the performance assessment and used the proportion of IT applications replacing traditional manual management as a variable. It analysed different replacement ratios to obtain the optimal solution for the change of contractors behaviours and promote the optimal performance incentive for the informatisation in megaprojects.

Findings

The results show that under the condition of the optimal replacement ratio, achieving the optimal state of a mutual win-win situation is possible for the benefit of both sides. The counter-intuitive finding is that the greater the replacement ratio is not, the better, but those other constraints are also taken into account.

Originality/value

This study enriched the research of the performance configuration incentive from a practical perspective. It extended the research framework of IT incentive mechanisms in the governance of megaprojects from a management theory perspective. It clarified the role of IT applications in incentive mechanisms and the design process of optimal incentive contracts under different performance incentive states. The incentives made the contractors work harder to meet the owner's requirements, and it could improve the efficiency of megaprojects, thus better achieving megaproject objectives.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 6 July 2022

Xin Xia and Pengcheng Xiang

Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among…

Abstract

Purpose

Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among stakeholders, public skepticism, and opposition. However, most existing studies have not focused on the dynamic analysis of integrating social risks in these stages. This study developed a dynamic analysis approach to explore the dynamics of critical social risk factors and related stakeholders of megaprojects and built the managerial maps for various stakeholders.

Design/methodology/approach

Based on the social analysis network (SNA), a dynamic network analysis approach for understanding the dynamics of social risk and related stakeholders has been developed by literature and case analysis. The approach comprises the following steps: (1) generating social risk–stakeholder networks in different stages; (2) analysis of the critical stakeholders and social risk factors; (3) dynamic analysis of social risk factors; and (4) developing social risk management maps for various stakeholders. To verify the feasibility and effectiveness of the approach, 40 megaprojects from China were analyzed.

Findings

According to the results, the local government is a critical stakeholder during all stages, inadequate information promotion (IIP) and imperfect communication and coordination mechanism (ICCM) are key social risk sources throughout the megaproject life cycle. Furthermore, the management maps for government organizations, project implementation groups, and external stakeholders were constructed.

Originality/value

This research has three contributions. First, a dynamic analysis approach of stakeholder-associated social risks in megaprojects is developed, which enriches the social risk management theory of megaprojects and provides inspiration for future research focus. Second, the social risk–stakeholder networks and critical social risks in different stages are confirmed to provide a more valid and accurate picture of social risk management in megaprojects. Third, the social risk managerial maps for different stakeholders built in this research will be beneficial for governments, project implementation groups, and external stakeholders to optimize management strategies.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 February 2024

Luwei Zhao, Qing’e Wang, Bon-Gang Hwang and Alice Yan Chang-Richards

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification…

Abstract

Purpose

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification (MICMAC) to investigate the influencing factors of sustainable infrastructure vulnerability (SIV).

Design/methodology/approach

(1) Literature review and case study were used to identify the possible influencing factors; (2) a semi-structured interview was conducted to identify representative factors and the interrelationships among influencing factors; (3) ISM was adopted to identify the hierarchical structure of factors; (4) MICMAC was used to analyze the driving power (DRP) and dependence power (DEP) of each factor and (5) Semi-structured interview was used to propose strategies for overcoming SIV.

Findings

Results indicate that (1) 18 representative factors related to SIV were identified; (2) the relationship between these factors was divided into a five-layer hierarchical structure. The 18 representative factors were divided into driving factors, dependent factors, linkage factors and independent factors and (3) 12 strategies were presented to address the negative effects of these factors.

Originality/value

The findings illustrate the factors influencing SIV and their hierarchical structures, which can benefit the stakeholders and practitioners of an infrastructure project by encouraging them to take effective countermeasures to deal with related SIVs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 May 2020

Jin Xue, Geoffrey Qiping Shen, Rebecca Jing Yang, Irfan Zafar, E.M.A.C. Ekanayake, Xue Lin and Amos Darko

The purpose of this research is to seek better relational strategies between formal and informal stakeholder relationships to improve megaproject performance.

1101

Abstract

Purpose

The purpose of this research is to seek better relational strategies between formal and informal stakeholder relationships to improve megaproject performance.

Design/methodology/approach

The conceptual model was developed with twenty hypotheses based on the literature review. Then a questionnaire survey was conducted, and the collected data were analyzed by Partial Least squares Structural Equation Modeling (PLS-SEM) for validating the proposed model. Finally, the findings were discussed by a comparative study to explain the different effects of the formal and informal relationship on megaproject performance, and the managerial implications are presented for the stakeholders to implement the relationship management in the megaprojects.

Findings

The research finding reveals that formal relationship plays a dominating role in cost, quality, and labor protection; meanwhile, it is still more reliable in improving coordination, safety and environmental protection. Both formal and informal relationship is equally important towards collaboration and scheduling while the informal relationship is more effective in communication and project transparency.

Originality/value

The study extends the knowledge of relationship management in the domain of the megaproject performance. It provides a comprehensive and systematic understanding of the impact of formal and informal stakeholder relationships on ten aspects of the megaproject performance by the proposed conceptual model and PLS-SEM results. The research findings contribute to the theory of relationship management on how the different influences between formal and informal stakeholder relationships lead to better megaproject performance from inter-organizational level to project and societal level.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 August 2023

Ruifan Chang and Maxwell Fordjour Antwi-Afari

The application of three-dimensional (3D) printing technology in construction projects is of increasing interest to researchers and construction practitioners. Although the…

Abstract

Purpose

The application of three-dimensional (3D) printing technology in construction projects is of increasing interest to researchers and construction practitioners. Although the application of 3D printing technology at various stages of the project lifecycle has been explored, few studies have identified the relative importance of critical success factors (CSFs) for implementing 3D printing technology in construction projects. To address this research gap, this study aims to explore the academics (i.e. researchers) and construction practitioners’ perspectives on CSFs for implementing 3D printing technology in construction projects.

Design/methodology/approach

To do this, a questionnaire was administered to participants (i.e. academics and construction practitioners) with knowledge and expertise in 3D printing technology in construction projects. The collected data were analysed using mean score ranking, normalization and rank agreement analysis to identify CSFs and determine the consistency of the ranking of CSFs between academics and construction practitioners. In addition, exploratory factor analysis was used to identify the relationships and underlying constructs of the measured CSFs.

Findings

Through a rank agreement analysis of the collected data, 11 CSFs for implementing 3D printing technology were retrieved (i.e. 17% agreement), indicating a diverse agreement in the ranking of the CSFs between academics and construction practitioners. In addition, the results show three key components of CSFs including “production demand enabling CSFs”, “optimize the construction process enabling CSFs” and “optimized design enabling CSFs”.

Originality/value

This study highlights the feasibility of implementing the identified CSFs for 3D printing technology in construction projects, which not only serves as a reference for other researchers but also increases construction practitioners’ awareness of the practical benefits of implementing 3D printing technology in construction projects. Specifically, it would optimize the construction lifecycle processes, enhance digital transformation and promote sustainable construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 3 June 2014

Seweryn Spalek

There is a significant knowledge gap in the common understanding regarding the value that investment leading to an increase in project management maturity brings to the…

3917

Abstract

Purpose

There is a significant knowledge gap in the common understanding regarding the value that investment leading to an increase in project management maturity brings to the organisation. The purpose of this paper is to narrow this gap by investigating the relationship between an increase in the project management maturity level and the project's performance. Additionally, it advocates the investment roadmap approach.

Design/methodology/approach

This study is part of a worldwide research initiative into maturity in project management covering 447 global companies. For this purpose, survey data from experts from 194 select companies was analysed.

Findings

The cost of forthcoming projects depends on the level of maturity of project management and type of industry.

Research limitations/implications

The study is limited to three different industries (machinery, construction and information technology) and by the method of assessing their future project costs. New research directions are suggested.

Practical implications

The results of the study should help companies in allocating limited resources appropriately using the proposed roadmap.

Social implications

An increase in project management maturity can be achieved through different investment methods. This will benefit society as well.

Originality/value

The paper focuses on global companies dealing in machinery. The area has not been explored sufficiently from the project management perspective. It discusses the relationship between an increase in maturity and future project costs in three industries: machinery, construction and information technology. The paper suggests practical guidelines for project management and sequences in proper investments when resources are limited.

Details

Industrial Management & Data Systems, vol. 114 no. 5
Type: Research Article
ISSN: 0263-5577