1 – 10 of 316Matthew Ikuabe, Clinton Aigbavboa, Chimay Anumba and Ayodeji Emmanuel Oke
Through its advanced computational capabilities, cyber–physical systems (CPS) proffer solutions to some of the cultural challenges plaguing the effective delivery of facilities…
Abstract
Purpose
Through its advanced computational capabilities, cyber–physical systems (CPS) proffer solutions to some of the cultural challenges plaguing the effective delivery of facilities management (FM) mandates. This study aims to explore the drivers for the uptake of CPS for FM functions using a qualitative approach – the Delphi technique.
Design/methodology/approach
Using the Delphi technique, the study selected experts through a well-defined process entailing a pre-determined set of criteria. The experts gave their opinions in two iterations which were subjected to statistical analyses such as the measure of central tendency and interquartile deviation in ascertaining consensus among the experts and the Mann–Whitney U test in establishing if there is a difference in the opinions given by the experts.
Findings
The study’s findings show that six of the identified drivers of the uptake of CPS for FM were attributed to be of very high significance, while 12 were of high significance. Furthermore, it was revealed that there is no significant statistical difference in the opinions given by experts in professional practice and academia.
Practical implications
The study’s outcome provides the requisite insight into the propelling measures for the uptake of CPS for FM by organisations and, by extension, aiding digital transformation for effective FM delivery.
Originality/value
To the best of the authors’ knowledge, evidence from the literature suggests that no study has showcased the drivers of the incorporation of CPS for FM. Hence, this study fills this gap in knowledge by unravelling the significant propelling measures of the integration of CPS for FM functions.
Details
Keywords
Matthew Ikuabe, Clinton Ohis Aigbavboa, Chimay Anumba and Ayodeji Emmanuel Oke
The quest for improved facilities management (FM) delivery is receiving immense focus through the incorporation of innovative technologies such as cyber-physical systems (CPS)…
Abstract
Purpose
The quest for improved facilities management (FM) delivery is receiving immense focus through the incorporation of innovative technologies such as cyber-physical systems (CPS). The system’s high computational capabilities can aid in the abatement of some of the challenges plaguing FM functions. However, the requisite ingredients for the uptake of the system for FM have still not gained scholarly attention. Because performance measurement is a vital index in determining the outcome of FM methods, this study aims to investigate the influence of performance measurement indicators that are influential to the uptake of CPS for delivering FM functions.
Design/methodology/approach
A qualitative technique was adopted using the Delphi technique. The panel of experts for the study was selected through a well-defined process based on stipulated criteria. The experts gave their opinions in two rounds before consensus was attained on the identified performance measurement indicators, whereas methods of data analysis were measures of central tendency, inter-quartile deviation and Mann–Whitney U test.
Findings
Results from this study showed that 11 of the performance indicators were of very high significance in the determination of the uptake of CPS for FM functions, whereas 5 of the indicators were proven to be of high significance. Furthermore, there was no statistical difference in the opinions of the experts based on their affiliation with academic institutions and professional practice.
Practical implications
The findings of this study contribute practically by aiding policymakers, facility managers and relevant stakeholders with the vital knowledge of delivery mandates for efficient FM services that can spur the uptake of digital technologies such as CPS.
Originality/value
This study contributes to the body of knowledge as it unveils a roadmap of the expected performance output and its accompanying evaluation that would drive the adoption of a promising technology such as CPS in the delivery of FM tasks.
Details
Keywords
Douglas Aghimien, Clinton Aigbavboa, Ayodeji Emmanuel Oke and John Aliu
Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the…
Abstract
Purpose
Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the right people to drive the implementation of these technologies and attaining strategic organisational goals is essential. While most studies have focused on the use of emerging technologies in the construction industry, less attention has been given to the ‘people’ dimension. Therefore, this study aims to assess the people-related features needed for construction digitalisation.
Design/methodology/approach
The study adopted pragmatic thinking using a mixed-method approach. A Delphi was used to achieve the qualitative aspect of the research, while a questionnaire survey conducted among 222 construction professionals was used to achieve the quantitative aspect. The data gathered were analysed using frequency, percentage, mean item score, Kruskal–Wallis H test, exploratory factor analysis and confirmatory factor analysis.
Findings
Based on acceptable reliability, validity and model fit indices, the study found that the people-related factors needed for construction digitalisation can be grouped into technical capability of personnel, attracting and retaining digital talent and organisation’s digital culture.
Practical implications
The findings offer valuable benefits to construction organisations as understanding these identified people features can help lead to better deployment of digital tools and the attainment of the digital transformation.
Originality/value
This study attempts to fill the gap in the shortage of literature exploring the people dimension of construction digitalisation. The study offers an excellent theoretical backdrop for future works on digital talent for construction digitalisation, which has gained less attention in the current construction digitalisation discourse.
Details
Keywords
Faizal Kurniawan, Xavier Nugraha, Julienna Hartono and Angelica Milano Aryani Wibisono
This paper aims to analyze regulation regarding sustainable construction procurement in Southeast Asia and provide a reconstruction of regulation regarding the sustainable…
Abstract
Purpose
This paper aims to analyze regulation regarding sustainable construction procurement in Southeast Asia and provide a reconstruction of regulation regarding the sustainable construction procurement to prevent land degradation.
Design/methodology/approach
This was done through legal research methods, mainly historical and systematical interpretation. The approaches used in this paper are the conceptual approach, statute approach and comparative approach.
Findings
By analyzing the related legal norms, it can be understood that many nations in Southeast Asia do not have regulation regarding sustainable construction procurement. Between Indonesia, Singapore and Thailand, only Indonesia has a ministrial regulation that provides general norms regarding sustainable construction procurement. Regarding the reconstruction of regulation, the bare minimum standards consist of principle, indicators, pillar, the phases of the procurement, law enforcement, both preventive and repressive, and sustainable procurement committee.
Research limitations/implications
This research is limited to regulation in Southeast Asian region. By analyzing the regulation, this paper will provide a reconstruction of regulations regarding sustainable construction procurement that will act as an ground rules. Having the same ground rules will create synergies between countries in Southeast Asia to apply the principles of sustainable procurement and move together toward to prevent land degradation.
Originality/value
To the best of the authors’ knowledge, this paper is the first systematic legal research that compares regulations from three nations in Southeast Asia regarding sustainable construction procurement and also the first paper to provide reconstruction of regulation regarding sustainable construction procurement to prevent land degradation.
Details
Keywords
Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson
This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.
Abstract
Purpose
This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.
Design/methodology/approach
Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.
Findings
How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.
Research limitations/implications
This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.
Originality/value
Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.
Details
Keywords
Klara Granheimer, Tina Karrbom Gustavsson and Per Erik Eriksson
Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the…
Abstract
Purpose
Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the uncertainties. Despite that, studies on the public procurement of engineering services are scarce. Although scholars have shown that uncertainty may affect the choice of control modes, the level of uncertainty that characterises services is not addressed by the two task characteristics: knowledge of the transformation process and output measurability. The purpose is to investigate organisational control in public procurement of engineering services.
Design/methodology/approach
The existing control model was adjusted in this study by conceptually adding uncertainty as a third aspect to the two task characteristics. A single case study of the Swedish Transport Administration was used. The empirical data, comprising 14 interviews with managers from the client and engineering consulting companies, were analysed using flexible pattern matching and visual mapping approaches and then illustrated using the model.
Findings
The public client did not base its choice of control modes on uncertainty, but rather on the other two task characteristics. Consequently, the service providers argued that the chosen control modes reduced their creativity, increased their financial risks and caused unclear responsibilities. This study therefore shows that uncertainty is an important factor to consider in the choice of control modes, both from a theoretical perspective and from the service providers' point of view. The developed model may therefore be useful for researchers as well as practitioners.
Originality/value
This study is the first attempt to add uncertainty as a task characteristic when choosing control modes. The results contribute to the scarce control literature regarding the procurement of engineering services for construction projects and the procurement of other services with high uncertainty.
Details
Keywords
Luís Jacques de Sousa, João Poças Martins and Luís Sanhudo
Factors like bid price, submission time, and number of bidders influence the procurement process in public projects. These factors and the award criteria may impact the project’s…
Abstract
Purpose
Factors like bid price, submission time, and number of bidders influence the procurement process in public projects. These factors and the award criteria may impact the project’s financial compliance. Predicting budget compliance in construction projects has been traditionally challenging, but Machine Learning (ML) techniques have revolutionised estimations.
Design/methodology/approach
In this study, Portuguese Public Procurement Data (PPPData) was utilised as the model’s input. Notably, this dataset exhibited a substantial imbalance in the target feature. To address this issue, the study evaluated three distinct data balancing techniques: oversampling, undersampling, and the SMOTE method. Next, a comprehensive feature selection process was conducted, leading to the testing of five different algorithms for forecasting budget compliance. Finally, a secondary test was conducted, refining the features to include only those elements that procurement technicians can modify while also considering the two most accurate predictors identified in the previous test.
Findings
The findings indicate that employing the SMOTE method on the scraped data can achieve a balanced dataset. Furthermore, the results demonstrate that the Adam ANN algorithm outperformed others, boasting a precision rate of 68.1%.
Practical implications
The model can aid procurement technicians during the tendering phase by using historical data and analogous projects to predict performance.
Social implications
Although the study reveals that ML algorithms cannot accurately predict budget compliance using procurement data, they can still provide project owners with insights into the most suitable criteria, aiding decision-making. Further research should assess the model’s impact and capacity within the procurement workflow.
Originality/value
Previous research predominantly focused on forecasting budgets by leveraging data from the private construction execution phase. While some investigations incorporated procurement data, this study distinguishes itself by using an imbalanced dataset and anticipating compliance rather than predicting budgetary figures. The model predicts budget compliance by analysing qualitative and quantitative characteristics of public project contracts. The research paper explores various model architectures and data treatment techniques to develop a model to assist the Client in tender definition.
Details
Keywords
Cong Wang, Henry Liu, Michael C.P. Sing and Jin Wu
Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction…
Abstract
Purpose
Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction. However, Private Public Partnerships (PPPs) have been subjected to a long pre-construction, thereby leading to an inefficient development process. Therefore, the purpose of this paper is to pay attention to the influencing factors elongating the pre-construction duration.
Design/methodology/approach
Based on data of 5,677 PPP projects between 2009 and 2021 in China, the authors adopt the Accelerated Failure Time (AFT) model in duration analysis to empirically analyze the following underlying dynamics determining the duration of PPP pre-construction stages: (1) policy uncertainty; (2) corruption; and (3) procurement method selection. To observe the influencing paths more specifically, the authors divided the pre-construction duration into the pre-tendering period and tendering period and regressed them separately.
Findings
The results indicate that the pre-construction duration is significantly prolonged with increased policy uncertainty and corruption degree as well as the use of tendering methods. Meanwhile, the above factors have a greater impact on the pre-tendering period than the tendering period.
Originality/value
The contribution of this study is twofold: (1) theoretically, this paper provides new evidence on the impact of PPP policy uncertainty, corruption and procurement method selection on the pre-construction duration. It complements empirical studies on the factors elongating the time efficiency of PPPs projects. (2) In practice, it provides a specific path for the government to improve the time efficiency of PPPs.
Details
Keywords
Ahsan Nawaz and Francis Lanme Guribie
Social procurement (SP) is a complicated and risky innovation, the adoption of which needs to be accompanied by complementary process and organizational change. To date, however…
Abstract
Purpose
Social procurement (SP) is a complicated and risky innovation, the adoption of which needs to be accompanied by complementary process and organizational change. To date, however, there has been little empirical evidence explaining whether and how different sorts of external pressures affect the level of SP adoption in the construction sector. Drawing on institutional theory, this study aims to analyze how three types of isomorphic pressures (i.e. coercive, mimetic and normative pressures) influence the adoption of SP in the construction sector.
Design/methodology/approach
The impacts of these pressures are empirically tested with survey data collected from 134 construction firms in the Chinese construction industry.
Findings
The findings show that both coercive and mimetic pressures have a considerable impact on the adoption of SP. However, there is little evidence in this study that normative demands had a major impact on SP.
Practical implications
This research is a useful instrument for promoting a favorable social attitude regarding construction procurement. Through socioeconomic regeneration and development, procurement can be considered as a significant route for social transformation, economic development and poverty reduction.
Originality/value
This study addresses the paucity of research into SP in the construction industry by establishing the institutional drivers to procuring services and products from a social enterprise perspective. Findings from this study extend the frontiers of existing knowledge on SP in the construction industry.
Details
Keywords
Bao Pham Van and Vachara Peansupap
Construction material management is an important process in supporting construction operations that affect project performance. Previous studies attempt to identify factors…
Abstract
Purpose
Construction material management is an important process in supporting construction operations that affect project performance. Previous studies attempt to identify factors influencing material management in different stages such as procurement, transportation and utilization. However, they lack a model to explain the relationship between influential factors and the effectiveness of material management. Therefore, this study aims to validate the variables and key factors influencing the effectiveness of material management processes.
Design/methodology/approach
A total of 42 variables were reviewed from literature in different stages of material management process. Survey questionnaires were used to collect data about participants' perceptions on these variables. The respondents were 200 project engineers and project managers from construction sites and offices in Vietnam. Then factor analysis techniques were undertaken to validate the structure of factor groups. Two methods of exploratory factor analysis (EFA) and confirmatory factor analysis (CFA) were, respectively, performed to evaluate and verify the model's fit.
Findings
Factors influencing the effectiveness of material management were grouped into nine main factors, which are procurement issues, site conditions, planning and handling on site, industrial environments, contractual issues, quality control, suppliers and manufacturers' issues, transportation in and out site and security on site.
Practical implications
The paper has several implications for theory and methodology related to material management. It features influential factors in association with the material management effectiveness. Therefore, senior managers can more fully understand the errors in their works and propose timely solutions to limit the unwanted risks.
Originality/value
This research contributes on theoretical development on factors influencing effectiveness of material management processes. The key findings on influential factors can be applied to measure the effectiveness of material management processes.
Details