1 – 10 of 65Anna Kadefors, Kirsi Aaltonen, Stefan Christoffer Gottlieb, Ole Jonny Klakegg, Pertti Lahdenperä, Nils O.E. Olsson, Lilly Rosander and Christian Thuesen
Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level…
Abstract
Purpose
Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level learning in this field. This paper employs an institutional perspective to analyze how legitimacy for relational contracting has been produced and challenged in Denmark, Finland, Norway and Sweden, including implications for dissemination and learning.
Design/methodology/approach
A collaborative case study design is used, where longitudinal accounts of the developments in relational contracting over more than 25 years in four Nordic countries were developed by scholars based in each country. The descriptions are underpinned by literature sources from research, practice and policy.
Findings
The countries share similar problem perceptions that have triggered the de-institutionalization of traditional contracting practices. Models and policies developed elsewhere are important sources of knowledge and legitimacy. Most countries have seen pendulum movements, where dissemination of relational contracting is followed by backlashes when projects fail to meet projected outcomes. Before long, however, relational contracting tends to re-emerge under new labels and in slightly new forms. Such a proliferation of concepts presents further obstacles to learning. Successful institutionalization is found to rely on realistic goals in combination with broad competence development at the organizational and industry levels.
Practical implications
In seeking inspiration from other countries, policymakers should go beyond contract models to also consider strategies to manage industry-level learning.
Originality/value
The paper provides a unique longitudinal cross-country perspective on the field of relational contracting. As such, it contributes to the small stream of literature on long-term institutional change in the construction sector.
Details
Keywords
Daniela Sorrentino, Pasquale Ruggiero, Alessandro Braga and Riccardo Mussari
This paper delves into a pivotal juncture within the co-production literature, intersecting with the ongoing debate about performance challenges in public sector accounting…
Abstract
Purpose
This paper delves into a pivotal juncture within the co-production literature, intersecting with the ongoing debate about performance challenges in public sector accounting scholarship. It explores how public managers conceive and measure the performance of co-produced public services.
Design/methodology/approach
A case study is conducted on three instances of neighbourhood watching – that is, a type of collective co-production – in a homogeneous institutional setting. The analysis and interpretation of empirical data are guided by a systematic conceptual space delineating the qualities that performance criteria can take in contexts where public services are produced.
Findings
Findings reveal that when the co-production activation is driven by both state and lay actors, public managers tend to conceptualise and measure its performance in a way that contributes to building a more structured co-productive space, where the roles to play, how to interact and what to achieve are clearly defined.
Originality/value
This paper breaks new ground by scrutinising the conceptualisation of performance in settings where public services involve actors beyond traditional public administrations. By exploring the diverse “shapes” and meanings that performance can take in co-production arrangements, this paper enriches discussions on how public sector accounting can inform co-production literature.
Details
Keywords
Giulia Piantoni, Laura Dell'Agostino, Marika Arena and Giovanni Azzone
Measuring shared value (SV) created in innovation ecosystems (IEs) is increasingly relevant but complex, given the multidimensional and multiactor nature of both concepts, which…
Abstract
Purpose
Measuring shared value (SV) created in innovation ecosystems (IEs) is increasingly relevant but complex, given the multidimensional and multiactor nature of both concepts, which challenges traditional performance measurement systems (PMSs). Moving from this gap, the authors propose an integrated approach to extend the balanced scorecard (BSC) for measuring and monitoring SV creation at IE level.
Design/methodology/approach
The proposed approach combines the most recent contributions on PMS in IEs and SV to define perspectives and dimensions that are better suited to deal with the nature of both IEs and SV. The approach is also applied to the real case (Alpha) of an Italian IE through a step wise method. Starting from the IE vision, the authors identify in the strategy map the specific objectives related to each perspective/dimension combination and then associate a performance indicator with each objective.
Findings
The resulting SV BSC is composed of indicators interconnected along different perspectives and dimensions. The application of the approach to the real case proves its feasibility and highlights characteristics, advantages and disadvantages of the SV BSC when used at IE level. The authors also provide guidelines for its application to other IEs.
Originality/value
The study contributes to the research on PMS by introducing and applying to a real case an integrated approach to assess SV in IEs, overcoming the shortcomings of PMS framed for single firms. It can be of interest for both researchers in the field of ecosystems value creation and practitioners managing or promoting such complex structures.
Details
Keywords
Siraj Ahmed, Jukka Majava and Kirsi Aaltonen
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…
Abstract
Purpose
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.
Design/methodology/approach
A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).
Findings
The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.
Originality/value
Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.
Details
Keywords
Eric Kwame Simpeh, Matilda Akoto, Henry Mensah, Divine Kwaku Ahadzie, Daniel Yaw Addai Duah and Nonic Akwasi Reney
In the Global North, affordable housing has evolved and thrived, and it is now gaining traction in the Global South, where governments have been vocal supporters of the concept…
Abstract
Purpose
In the Global North, affordable housing has evolved and thrived, and it is now gaining traction in the Global South, where governments have been vocal supporters of the concept. Therefore, this paper aims to investigate the important criteria for selecting affordable housing units in Ghana.
Design/methodology/approach
A quantitative research approach was used, and a survey was administered to the residents. The data was analysed using both descriptive and inferential statistics. The relative importance index technique was used to rank the important criteria, and the EFA technique was used to create a taxonomy system for the criteria.
Findings
The hierarchical ranking of the most significant criteria for selecting affordable housing includes community safety, waste management and access to good-quality education. Furthermore, the important criteria for selecting affordable housing are classified into two groups, namely, “sustainability criteria” and “housing demand and supply and social service provision”.
Research limitations/implications
This study has implications for the real estate industry and construction stakeholders, as this will inform decision-making in terms of the design of affordable housing and the suitability of the location for the development.
Originality/value
These findings provide a baseline to support potential homeowners and tenants in their quest to select affordable housing. Furthermore, these findings will aid future longitudinal research into the indicators or criteria for selecting suitable locations for the development of low- and middle-income housing.
Details
Keywords
Matthew Tickle, Sarah Schiffling and Gaurav Verma
This paper aims to explore the impact of fourth-party logistics (4PL) adoption on the agility, adaptability and alignment (AAA) capabilities within humanitarian supply chains…
Abstract
Purpose
This paper aims to explore the impact of fourth-party logistics (4PL) adoption on the agility, adaptability and alignment (AAA) capabilities within humanitarian supply chains (HSCs).
Design/methodology/approach
Semi-structured interviews with individuals from a large non-government organisation were combined with secondary data to assess the influence of 4PL adoption on AAA capabilities in HSCs.
Findings
The results indicate that HSCs exhibit some of the AAA antecedents but not all are fully realised. While 4PL positively affects the AAA capabilities of HSCs, its adoption faces challenges such as the funding environment, data security/confidentiality and alignment with humanitarian principles. The study suggests an AAA antecedent realignment, positioning alignment as a precursor to agility and adaptability. It also identifies three core antecedents in HSCs: flexibility, speed and environmental uncertainty.
Practical implications
The study shows the positive impact 4PL adoption can have on the AAA capabilities of HSCs. The findings have practical relevance for those wishing to optimise HSC performance through 4PL adoption, by identifying the inhibiting factors to its adoption as well as strategies to address them.
Originality/value
This research empirically explores 4PL’s impact on AAA capabilities in HSCs, highlighting the facilitating and hindering factors of 4PL adoption in this environment as well as endorsing a realignment of AAA antecedents. It also contributes to the growing research on SC operations in volatile settings.
Details
Keywords
Tawanda Jimu and Britta Rennkamp
This paper aims to present insights on the governance of sustainability transitions in higher education in Africa. The authors interrogate the research literatures on the…
Abstract
Purpose
This paper aims to present insights on the governance of sustainability transitions in higher education in Africa. The authors interrogate the research literatures on the governance of socio-technical transitions in water, electricity, transport and waste management, and identify barriers and enabling factors that enhance transformative practices in universities.
Design/methodology/approach
The analytical framework proposed in this paper combines the elements of governance network theory (GNT) and transition topology. The framework of this study is grounded in an actor-centric approach using GNT to understand networks conducive to sustainability transitions. Events and governance networks were mapped on a transition topology to visualise organisational and institutional changes over time. The study engaged students, management, academic and administrative staff in building a community of practice towards sustainability. This research is based on qualitative content analysis grounded in interview data, focus group discussions, workshops, webinars and secondary data analysis.
Findings
The findings show that the university has consolidated a sustainability vision and targets, but several factors prevent the community from achieving these targets, including hierarchical decision-making processes, a multitude of disjointed committees and fragmentation in the campus community.
Originality/value
This research adds to an emerging body of literature in the field of sustainability in higher education with two contributions. Firstly, the study presents a novel perspective(s) on the governance of sustainability transitions by combining the literatures on governance and sustainability transitions using a new methodological approach of transition topology to show organisational and institutional changes. Secondly, the study presents new empirical evidence for improving the governance of sustainability transitions in a diverse and highly unequal African university community in the process of (de)colonisation of knowledge and governance.
Details
Keywords
Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…
Abstract
Purpose
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.
Design/methodology/approach
The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).
Findings
Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.
Practical implications
The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.
Originality/value
There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.
Details
Keywords
Bianca Kramer and Jeroen Bosman
In academia, assessment is often narrow in its focus on research productivity, its application of a limited number of standardised metrics and its summative approach aimed at…
Abstract
In academia, assessment is often narrow in its focus on research productivity, its application of a limited number of standardised metrics and its summative approach aimed at selection. This approach, corresponding to an exclusive, subject-oriented concept of talent management, can be thought of as at odds with a broader view of the role of academic institutions as accelerating and improving science and scholarship and its societal impact. In recent years, open science practices as well as research integrity issues have increased awareness of the need for a more inclusive approach to assessment and talent management in academia, broadening assessment to reward the full spectrum of academic activities and, within that spectrum, deepening assessment by critically reflecting on the processes and indicators involved (both qualitative and quantitative). In terms of talent management, this would mean a move from research-focused assessment to assessment including all academic activities (including education, professional performance and leadership), a shift from focus on the individual to a focus on collaboration in teams (recognising contributions of both academic and support staff), increased attention for formative assessment and greater agency for those being evaluated, as well as around the data, tools and platforms used in assessment. Together, this represents a more inclusive, subject-oriented approach to talent management. Implementation of such changes requires involvement from university management, human resource management and academic and support staff at all career levels, and universities would benefit from participation in mutual learning initiatives currently taking shape in various regions of the world.
Details
Keywords
Paola Maria Anna Paniccia, Gianpaolo Abatecola and Silvia Baiocco
How does the interaction between time and knowledge affect the evolution of organizations? Past research in organizational evolution has mostly investigated time and knowledge as…
Abstract
Purpose
How does the interaction between time and knowledge affect the evolution of organizations? Past research in organizational evolution has mostly investigated time and knowledge as two separate variables. In contrast, theoretical perspectives integrating these variables are still seemingly scant. The authors believe that filling this literature gap needs attention. Thus, this study aims to contribute by developing a conceptual framework.
Design/methodology/approach
This is a conceptual study. The framework is centred on the concept of “co-evolutionary time”, which the authors explain through a business example from the tourism industry. Supported by a narrative-based style, from a methodological point of view the framework is featured by the attempt to synthesize specific, extant literature into new theoretical development.
Findings
As its main theoretical contribution, the co-evolutionary time suggests how firms can adapt in a way that, from an evolutionary perspective, proves fitting both in terms of contents and methods, thus opening possibilities for new long-term social construction and reconstruction. As its main practical contribution, co-evolutionary time can constitute not only a temporary source of organizational success and competitive advantage but also an agent of enduring change and long-term business survival.
Originality/value
As its main novelty, the framework is developed through merging two literature streams. In particular, the authors first consider the literature about time, with a focus on its objective and subjective dimensions. The authors then consider the literature about organizational evolution, with a focus on the co-evolutionary nature of the firm/environment relationship.
Details