Search results

1 – 10 of over 5000
Article
Publication date: 7 August 2023

Ogochukwu Monye

The Central Bank of Nigeria (CBN) recently relaunched Nigeria’s cashless policy initiative which seeks to reduce financial crime and tax avoidance, decrease cash dependency…

Abstract

Purpose

The Central Bank of Nigeria (CBN) recently relaunched Nigeria’s cashless policy initiative which seeks to reduce financial crime and tax avoidance, decrease cash dependency, advance the adoption of digital financial services (DFS), decrease the risks to the payment system and foster financial inclusion. This study aims to identify the unique challenges of going cashless in Nigeria, particularly in terms of infrastructural, exclusionary and cost implications of the policy on the average citizens.

Design/methodology/approach

The author applies a doctrinal research methodology to identify and reflect on key challenges of the cashless policy from the economic, regulatory and transactional perspectives.

Findings

The cashless policy initiative in Nigeria heralds value for financial integrity, financial policy regulation and user convenience. The mode of introduction, however, ushers in significant challenges and hardly considers Nigeria’s inadequate payment infrastructure, persistent financial exclusion, low levels of financial and digital literacy and capability, high cost of using DFS and pervasive proclivity for cash. As Nigerians adjust albeit inconveniently to the policy, the CBN can ameliorate the hardship by strengthening the payment infrastructure, particularly for digital payments, fostering consumer trust by safeguarding user funds and enabling consumer preferences.

Research limitations/implications

Research materials include the national regulator’s policy documents and newspaper articles that have not been published in formal reports but non-the-less adequately mirror the policy intention of the CBN and the lived experiences of Nigerians.

Practical implications

This study identifies the practical steps and regulatory measures that the CBN can take to improve acceptance and meaningful and sustainable adoption of the cashless policy by the majority of Nigerians.

Social implications

The recommendations that are proffered provide some rich insights to inform regulatory direction for the CBN to seamlessly phase-in the cashless policy and consequently drive down financial exclusion in Nigeria.

Originality/value

This study contributes to the policy discussion around the introduction of the cashless Nigeria project. The doctrinal research method highlights the policy intentions of the regulator in juxtaposition with lived experiences of Nigerians. This study offers recommendations to bolster financial inclusion, stability and integrity.

Details

Journal of Money Laundering Control, vol. 27 no. 3
Type: Research Article
ISSN: 1368-5201

Keywords

Abstract

Details

Walking the Talk? MNEs Transitioning Towards a Sustainable World
Type: Book
ISBN: 978-1-83549-117-1

Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 11 January 2024

Raunaq Chawla, Eric Soreng and Avinash Kumar

A prime objective of the Swachh Bharat Abhiyan (SBA; Clean India Mission) is to motivate people to segregate their household waste. The purpose of this study is to assess the…

Abstract

Purpose

A prime objective of the Swachh Bharat Abhiyan (SBA; Clean India Mission) is to motivate people to segregate their household waste. The purpose of this study is to assess the ground reality of waste management behaviour of Delhi residents with the help of a modified Value–Belief–Norm (VBN) model. Past researches point the need to include cost as a variable in the VBN model. This study fulfils this need and tests cost as one of the variables on the gathered data.

Design/methodology/approach

The research data were gathered by interacting with the people and the civic staff in the jurisdiction of the three Delhi municipalities through a stratified sampling technique (N = 250). The structural equation modelling was used to analyse the collected data.

Findings

The modified VBN model explains the waste management behaviour, but the variables do not follow the exact causal chain. Values, awareness of consequences, ascription of responsibility and personal norms all explain the resident's waste management behaviour. However, cost limits the resident's waste management behaviour.

Research limitations/implications

The study could only achieve a moderate model fit; its sample size was small; and data were collected through self-reported questionnaire.

Practical implications

Three main practical implications of the study are: (1) While designing waste management solutions, due importance must be given to the cost to be borne by people for adopting these solutions. (2) Design such interventions that target residents' values to convince them to make the desired behavioural change. (3) People need be educated about the ways to sort waste and made aware of the importance of waste segregation in eradicating the urban waste mess.

Originality/value

The paper is an original contribution to testing a modified VBN model in predicting waste management behaviour. The modified model includes cost as a variable missing in the previous research. This research is useful in the backdrop of the SBA and provides suggestions for policymakers and pro-environment researchers.

Details

Management of Environmental Quality: An International Journal, vol. 35 no. 4
Type: Research Article
ISSN: 1477-7835

Keywords

Article
Publication date: 25 April 2024

Abdul-Manan Sadick, Argaw Gurmu and Chathuri Gunarathna

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is…

37

Abstract

Purpose

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is qualitative, posing additional challenges to achieving accurate cost estimates. Additionally, there is a lack of tools that use qualitative project information and forecast the budgets required for project completion. This research, therefore, aims to develop a model for setting project budgets (excluding land) during the pre-conceptual stage of residential buildings, where project information is mainly qualitative.

Design/methodology/approach

Due to the qualitative nature of project information at the pre-conception stage, a natural language processing model, DistilBERT (Distilled Bidirectional Encoder Representations from Transformers), was trained to predict the cost range of residential buildings at the pre-conception stage. The training and evaluation data included 63,899 building permit activity records (2021–2022) from the Victorian State Building Authority, Australia. The input data comprised the project description of each record, which included project location and basic material types (floor, frame, roofing, and external wall).

Findings

This research designed a novel tool for predicting the project budget based on preliminary project information. The model achieved 79% accuracy in classifying residential buildings into three cost_classes ($100,000-$300,000, $300,000-$500,000, $500,000-$1,200,000) and F1-scores of 0.85, 0.73, and 0.74, respectively. Additionally, the results show that the model learnt the contextual relationship between qualitative data like project location and cost.

Research limitations/implications

The current model was developed using data from Victoria state in Australia; hence, it would not return relevant outcomes for other contexts. However, future studies can adopt the methods to develop similar models for their context.

Originality/value

This research is the first to leverage a deep learning model, DistilBERT, for cost estimation at the pre-conception stage using basic project information like location and material types. Therefore, the model would contribute to overcoming data limitations for cost estimation at the pre-conception stage. Residential building stakeholders, like clients, designers, and estimators, can use the model to forecast the project budget at the pre-conception stage to facilitate decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 April 2024

Richard Tarpey, Jinfeng Yue, Yong Zha and Jiahong Zhang

The importance of service firms cooperating with digital platforms is widely acknowledged. The authors study three contractual relationships (fixed-cost, cost-sharing, and…

Abstract

Purpose

The importance of service firms cooperating with digital platforms is widely acknowledged. The authors study three contractual relationships (fixed-cost, cost-sharing, and profit-sharing) between service firms (specifically hotels) and digital platforms in a highly fragmented service supply chain to examine which of these contract types optimizes profits.

Design/methodology/approach

The authors extend prior models analyzing the optimal expected total profit from the travel service firm (hotel)–digital platform relationship, providing new insights into each contract type’s ability to coordinate decentralized systems and optimize profits for both parties.

Findings

This study finds that fixed cost contracts cannot coordinate the decentralized system. Cost-sharing contracts can coordinate the decentralized system but only allow one channel profit split. In contrast, profit-sharing contracts may not always perfectly coordinate the decentralized system but support alternative profit allocations. Practically, both profit-sharing and cost-sharing contracts are preferable to fixed-cost contracts.

Practical implications

The paper includes implications for travel service firm managers to consider when structuring contracts with digital platforms to focus on profit optimization. Profit-sharing contracts are most preferable when cost and revenue data are fully shared between parties, while cost-sharing contracts are preferable over fixed-cost contracts.

Originality/value

This study extends prior investigations into the utility of different contract types on the optimal profit of a travel service firm (hotel)-digital platform provider relationship. The research fills a gap in the literature concerning the contracts used in these relationship types.

Details

Journal of Service Theory and Practice, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2055-6225

Keywords

Article
Publication date: 27 October 2022

Tigor Tambunan

This study aims to discover a practical and effective way to apply the quality cost concept in Strategic Cost Management (SCM) framework. The interaction of preventive, appraisal…

503

Abstract

Purpose

This study aims to discover a practical and effective way to apply the quality cost concept in Strategic Cost Management (SCM) framework. The interaction of preventive, appraisal and failure (PAF) activities in a company's internal value chain will be the starting point of SCM implementation.

Design/methodology/approach

This study begins by establishing value chain and quality costs as the scope of conceptual analysis. Discussions on the interrelationships between activities, quality and costs were gathered to clarify conceptual and practical gaps in the scope of the study. The PAF quality cost model is applied to find viable, practical solutions. The costs of activities will serve as performance indicators.

Findings

The PAF quality cost model depicts opportunities to lower costs and increase profit in a business simultaneously; current poor quality costs are the benchmark. Identifying PAF activities and costs in the business value chain and linking it with others is crucial in evaluating SCM applications. These linkages will generate a Quality Cost Chain (QCC). The leading indicator of improvement is a higher ratio between new possible failure costs (FC) and the combination of prevention and appraisal costs (PAC) than the current value, followed by a lower total quality cost (TQC). The subsequent attention is a lower ratio between the appraisal cost (AC) and prevention cost (PC). Mathematically, for assessing the operability of new quality-related activities, ΔPACnew < ΔFCnew, TQCnew < TQCcurrent, (FC/PC)new>(FC/PC)current and (AC/PC)new<(AC/PC)current are proposed as feasible conditional-quantitative improvement criteria.

Research limitations/implications

This study only discusses the relationship between quality costs and activities related to quality management in the PAF quality cost model, not cost behavior. This limitation opens up opportunities for future research that intends to link QCC with cost behavior in the context of managerial accounting and Strategic Cost Management. The use of QCC in certain industrial areas is the next research opportunity. The variety of PAF activities this study addresses originates from a wide range of industrial sectors; QCC research by sector may produce unique industrial quality cost phenomena.

Practical implications

QCC will make it easier for managers to evaluate how strategically their departments or activities contribute to quality costs at the departmental or organizational level, as well as to effectively and efficiently improve quality cost performance.

Originality/value

The quality-related activity and quality cost issues are still rarely treated as subjects of research studies in the field of Strategic Cost Management. Even so, the discussion tends to be very broad, complex and difficult to apply. This study combines a simple diagrammatic and mathematical approach to simplify the discussion and, at the same time, manage the value of strategic quality management.

Details

The TQM Journal, vol. 36 no. 3
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 4 March 2024

Hemanth Kumar N. and S.P. Sreenivas Padala

The construction industry is tasked with creating sustainable, efficient and cost-effective buildings. This study aims to develop a building information modeling (BIM)-based…

Abstract

Purpose

The construction industry is tasked with creating sustainable, efficient and cost-effective buildings. This study aims to develop a building information modeling (BIM)-based multiobjective optimization (MOO) model integrating the nondominated sorting genetic algorithm III (NSGA-III) to enhance sustainability. The goal is to reduce embodied energy and cost in the design process.

Design/methodology/approach

Through a case study research method, this study uses BIM, NSGA-III and real-world data in five phases: literature review, identification of factors, BIM model development, MOO model creation and validation in the architecture, engineering and construction sectors.

Findings

The innovative BIM-based MOO model optimizes embodied energy and cost to achieve sustainable construction. A commercial building case study validation showed a reduction of 30% in embodied energy and 21% in cost. This study validates the model’s effectiveness in integrating sustainability goals, enhancing decision-making, collaboration, efficiency and providing superior assessment.

Practical implications

This model delivers a unified approach to sustainable design, cutting carbon footprint and strengthening the industry’s ability to attain sustainable solutions. It holds potential for broader application and future integration of social and economic factors.

Originality/value

The research presents a novel BIM-based MOO model, uniquely focusing on sustainable construction with embodied energy and cost considerations. This holistic and innovative framework extends existing methodologies applicable to various buildings and paves the way for additional research in this area.

Article
Publication date: 9 May 2024

Yunshil Cha, Catherine Plante and Linda Ragland

In this study, we examine regulated public accessibility to municipalities’ financial reports and bond interest cost. In particular, we examine whether there is information…

Abstract

Purpose

In this study, we examine regulated public accessibility to municipalities’ financial reports and bond interest cost. In particular, we examine whether there is information content in a component of a constrained filing period that is useful to municipal bond market participants. The component of a filing period that we focus on is the period of time between an audit report date and a regulated public accessibility date.

Design/methodology/approach

To explore our research question, we collect a sample of observations from municipalities that: (1) are required to post annual/audit financial reports on a centralized state-level repository that includes a “transparent” date stamp on when reports are made publicly available and (2) have issued general obligation bonds. Our sample is limited to one observation per municipality. The sample period is 2006–2019. In terms of approach, we use an ordinary least square (OLS) regression model to empirically test whether the time period between municipalities’ audit report date and state-required repository filing date is associated with general obligation bond interest cost.

Findings

We find support for the idea that there is information content in a component of a constrained filing period. In particular, we hypothesize and find a positive association between the time period between an audit report date and a state filing date and general obligation bond interest cost. Seemingly, this component of time may provide something unique or not available in other components of a constrained filing period (e.g. the fiscal year-end date to the audit report date). In post hoc analyses, we also find that both components of the constrained filing period in our setting (i.e. the audit report date to state filing date and the fiscal year-end date to audit report date) need to be considered for either of the components to be significant. Moreover, although both components are necessary, the audit report date to state filing date component appears to have a slightly stronger association (in terms of statistical significance) with general obligation bond interest costs.

Research limitations/implications

To our knowledge, Illinois is the only state that provides a date stamp on when municipalities’ financial information is made publicly available on a centralized repository. As such we focus on municipalities in Illinois. While this increases the internal validity of our research, it potentially limits generalizability across other states. Also, as a reflection of the sample constraint, the number of observations in our study is relatively small. As part of post hoc analyses, we take a closer look at our sample, model and variables used to test our hypothesis.

Practical implications

For stakeholders, each component of a constrained filing period may provide unique information. For example, the time period between an audit report date and a regulated filing date may send a positive signal about the quality of financial management to investors. For regulators, requiring some sort of centralized public access to municipal financial reports that have transparent time constraints may help states provide stronger governance and help lower municipalities’ borrowing costs.

Originality/value

We use a novel approach (with the Illinois date stamp filing information) to examine our research question. Most prior research has often relied on an assumption that the time between fiscal year-end and the audit report date is the component of time that provides useful information to investors (e.g. Henke and Maher, 2016). In our setting, we explore and find that a component of a constrained filing time period (i.e. the date from an audit filing to a required public accessibility filing) may also provide impactful information to investors.

Details

Journal of Public Budgeting, Accounting & Financial Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1096-3367

Keywords

Article
Publication date: 2 April 2024

Paulo Alberto Sampaio Santos, Breno Cortez and Michele Tereza Marques Carvalho

Present study aimed to integrate Geographic Information Systems (GIS) and Building Information Modeling (BIM) in conjunction with multicriteria decision-making (MCDM) to enhance…

Abstract

Purpose

Present study aimed to integrate Geographic Information Systems (GIS) and Building Information Modeling (BIM) in conjunction with multicriteria decision-making (MCDM) to enhance infrastructure investment planning.

Design/methodology/approach

This analysis combines GIS databases with BIM simulations for a novel highway project. Around 150 potential alternatives were simulated, narrowed to 25 more effective routes and 3 options underwent in-depth analysis using PROMETHEE method for decision-making, based on environmental, cost and safety criteria, allowing for comprehensive cross-perspective comparisons.

Findings

A comprehensive framework proposed was validated through a case study. Demonstrating its adaptability with customizable parameters. It aids decision-making, cost estimation, environmental impact analysis and outcome prediction. Considering these critical factors, this study holds the potential to advance new techniques for assessment and planning railways, power lines, gas and water.

Research limitations/implications

The study acknowledges limitations in GIS data quality, particularly in underdeveloped areas or regions with limited technology access. It also overlooks other pertinent variables, like social, economic, political and cultural issues. Thus, conclusions from these simulations may not entirely represent reality or diverse potential scenarios.

Practical implications

The proposed method automates decision-making, reducing subjectivity, aids in selecting effective alternatives and considers environmental criteria to mitigate negative impacts. Additionally, it minimizes costs and risks while demonstrating adaptability for assessing diverse infrastructures.

Originality/value

By integrating GIS and BIM data to support a MCDM workflow, this study proposes to fill the existing research gap in decision-making prioritization and mitigate subjective biases.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 5000