Search results

1 – 10 of over 9000
Open Access
Article
Publication date: 10 June 2021

Ahm Shamsuzzoha, Sujan Piya and Mohammad Shamsuzzaman

This study aims to propose a method known as the fuzzy technique for order preference by similarity to ideal solution (fuzzy TOPSIS) for complex project selection in…

3277

Abstract

Purpose

This study aims to propose a method known as the fuzzy technique for order preference by similarity to ideal solution (fuzzy TOPSIS) for complex project selection in organizations. To fulfill study objectives, the factors responsible for making a project complex are collected through literature review, which is then analyzed by fuzzy TOPSIS, based on three decision-makers’ opinions.

Design/methodology/approach

The selection of complex projects is a multi-criteria decision-making (MCDM) process for global organizations. Traditional procedures for selecting complex projects are not adequate due to the limitations of linguistic assessment. To crossover such limitation, this study proposes the fuzzy MCDM method to select complex projects in organizations.

Findings

A large-scale engine manufacturing company, engaged in the energy business, is studied to validate the suitability of the fuzzy TOPSIS method and rank eight projects of the case company based on project complexity. Out of these eight projects, the closeness coefficient of the most complex project is found to be 0.817 and that of the least complex project is found to be 0.274. Finally, study outcomes are concluded in the conclusion section, along with study limitations and future works.

Research limitations/implications

The outcomes from this research may not be generalized sufficiently due to the subjectivity of the interviewers. The study outcomes support project managers to optimize their project selection processes, especially to select complex projects. The presented methodology can be used extensively used by the project planners/managers to find the driving factors related to project complexity.

Originality/value

The presented study deliberately explained how complex projects in an organization could be select efficiently. This selection methodology supports top management to maintain their proposed projects with optimum resource allocations and maximum productivity.

Details

Journal of Global Operations and Strategic Sourcing, vol. 14 no. 3
Type: Research Article
ISSN: 2398-5364

Keywords

Abstract

Details

International Journal of Managing Projects in Business, vol. 17 no. 2
Type: Research Article
ISSN: 1753-8378

Open Access
Article
Publication date: 31 May 2022

Kari-Pekka Tampio and Harri Haapasalo

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…

1057

Abstract

Purpose

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.

Design/methodology/approach

Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.

Findings

All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.

Practical implications

Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.

Originality/value

This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 12 May 2022

Kari-Pekka Tampio, Harri Haapasalo and Farooq Ali

This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the…

9017

Abstract

Purpose

This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the authors aim to identify the implications that stakeholder management has on value creation in a hospital project.

Design/methodology/approach

The research method is qualitative. Empirical data were collected in three cycles: project internal documentation, thematic interviews and survey. The literature related to hospital projects, stakeholder analysis and management, stakeholder salience and landscape is summarised, informing the qualitative design of the study.

Findings

The authors noted the importance of project-specific stakeholder identification, salience analysis and landscape description. The regulatory, formal and contractual stakeholders give an over-simplistic picture on stakeholder map. The operative stakeholder map and landscape describe the complexity, uncertainty, dynamism and institutional context inducing the challenges for the stakeholder management. There is an evident potential of utilising the stakeholder landscape and its elements in the resulting collaborative value creation in hospital projects. Multiple and changing stakeholders with differing expectations are an important opportunity to improve the value creation process.

Originality/value

Stakeholder management has recently attracted much attention in the industrial project setting. This research attempts to identify the operative stakeholder landscape in a large hospital project, not to mention its impact on value creation. This study offers a framework that can help academics and project management practitioners tackle the challenges amongst project stakeholders.

Details

International Journal of Managing Projects in Business, vol. 15 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 8 May 2018

Karlos Artto and Virpi Turkulainen

The purpose of this paper is to develop further understanding of the interdependence between product and organization subsystems in the context of major projects by empirically…

5009

Abstract

Purpose

The purpose of this paper is to develop further understanding of the interdependence between product and organization subsystems in the context of major projects by empirically elaborating the volume-variety matrix.

Design/methodology/approach

Projects are perceived as systems that include a product subsystem (the project outcome) and an organization subsystem (the temporary multi-firm organizational network that produces the project outcome). This study addresses product-organization interdependence by analyzing product and organization subsystem components in terms of their uniqueness and reuse across multiple projects. The empirical analysis focuses on four global renewable fuels refinery projects implemented by Neste from 2003 to 2011. The refineries are based on the same proprietary technology but are unique at the project level.

Findings

The findings indicate interesting interdependencies between product and organization subsystems when analyzed at the component level: the findings suggest both diagonal and off-diagonal positions in the volume-variety matrix. An example of an off-diagonal position is a reused organization subsystem component associated with a unique product subsystem component, meaning that choosing the same organization in a future project can be used for acquiring an improved and, thereby, unique product subsystem component.

Originality/value

The study elaborates upon the volume-variety matrix in the context of major projects. The findings related to off-diagonal positions in the matrix provide new knowledge on combinations at the component level where a reused organization can be associated with a unique product, and vice versa. This has direct implications for management of projects.

Details

International Journal of Operations & Production Management, vol. 38 no. 6
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 31 May 2022

Laura Saukko, Kirsi Aaltonen and Harri Haapasalo

The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.

2102

Abstract

Purpose

The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.

Design/methodology/approach

A theoretical construct of, referred in this study as integration capability framework is elaborated following a systematic literature review. Thereafter, an integration capability self-assessment model, based on maturity thinking, is derived from the theoretical framework. The self-assessment model is further developed and tested for validity within five inter-organizational project networks in cooperation with industry practitioners, representing construction, industrial engineering, and mining sectors.

Findings

The results show that inter-organizational projects can use the developed model in self-assessing the maturity levels of various integration mechanisms, thus the state of integration capability at any point in time during inter-organizational projects.

Originality/value

This study is an attempt to identify how the integration capability dimensions can be self-assessed in inter-organizational projects, through the maturity levels of various integration mechanisms. The results offer insights for both academics and project management practitioners.

Details

International Journal of Managing Projects in Business, vol. 15 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 27 February 2024

Maryam R. Nezami, Mark L.C. de Bruijne, Marcel J.C.M. Hertogh and Hans L.M. Bakker

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern…

Abstract

Purpose

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern infrastructures, requiring close collaboration of various infrastructure owners. To effectively manage and improve inter-organizational collaboration (IOC) in infrastructure construction projects, collaboration status should be assessed continually. This study identifies the assessment criteria, forming the foundation of a tool for assessing the status of IOC in interconnected infrastructure projects.

Design/methodology/approach

A systematic literature study and in-depth semi-structured interviews with practitioners in interconnected infrastructure construction projects in the Netherlands are performed to identify the criteria for assessing the status of IOC in infrastructure construction projects, based on which an assessment tool is developed.

Findings

The identified assessment criteria through the literature and the practitioner’s perspectives results in the designing and development of a collaboration assessment tool. The assessment tool consists of 12 criteria and 36 sub-criteria from three different categories of collaborative capacity: individual, relational, and organizational.

Originality/value

The assessment tool enables practitioners to monitor the status of IOC between infrastructure owners and assists them in making informed decisions to enhance collaboration. The assessment tool provides the opportunity to assess and analyze the status of collaboration based on three categories (i.e., individual, relational, and organizational).

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Content available
Article
Publication date: 12 September 2008

Terry Williams

723

Abstract

Details

International Journal of Managing Projects in Business, vol. 1 no. 4
Type: Research Article
ISSN: 1753-8378

Open Access
Article
Publication date: 13 January 2022

Andrea Patrucco, Christine Mary Harland, Davide Luzzini and Federico Frattini

Suppliers are essential partners in innovation projects, as they own resources, knowledge assets and capabilities that complement those of buying firms. In today’s competitive…

2806

Abstract

Purpose

Suppliers are essential partners in innovation projects, as they own resources, knowledge assets and capabilities that complement those of buying firms. In today’s competitive environment, firms may choose to collaborate with suppliers beyond dyads, forming triadic or three-party relationships. Using the theoretical lens of the relational view (RV), this study aims to explore what type of triad configurations firms use to govern supplier relationships in collaborative innovation projects, how they choose to share resources and implications for project performance.

Design/methodology/approach

The authors use interview data from buyers and suppliers in six case studies of firms involved in ten collaborative innovation projects. The four constructs of the RV are used to observe how firms govern triadic relationships, combine complementary resources, invest in relationship-specific assets and manage information and knowledge exchange with and between suppliers in innovation projects.

Findings

Four archetypes of triadic relationships in innovation projects – labeled Triangle, A-frame, D-Frame and Line – are presented and characterized in terms of their structural and relational features. The authors discuss how each triad archetype is applicable to different innovation projects according to specific project characteristics.

Originality/value

This study is pioneering in its empirical examination of triadic relationships in collaborative innovation projects. It provides a novel typology of four archetypes of triad from the perspective of collaborative relationships with suppliers. Through applying the RV, it advances understanding of how triadic relationships are governed, how they invest in relationship-specific assets, how they combine complementary resources and how they exchange knowledge and information in each type of triad appropriate to different innovation project settings. To date, much of the extant literature has focused on dyads.

Details

Supply Chain Management: An International Journal, vol. 27 no. 7
Type: Research Article
ISSN: 1359-8546

Keywords

Open Access
Article
Publication date: 28 February 2024

Ilkka Tapani Ojansivu

This study aims to focus on a specific project marketing concept, i.e. “discontinuity,” and analyzes how this concept emerged in project marketing, becoming its key scholarly…

Abstract

Purpose

This study aims to focus on a specific project marketing concept, i.e. “discontinuity,” and analyzes how this concept emerged in project marketing, becoming its key scholarly embodiment, how it became decoupled from the increasingly service-intensive project business practice and what the relevance of discontinuity is for project marketers moving forward.

Design/methodology/approach

This study is built on a systematic literature review of 31 years (1993–2023) of publishing data from major marketing and management journals.

Findings

This study provides three findings. First, the author reveals the risks related to marketing scholars and practitioners losing sight of each other as business practices evolve much faster than scholarly research can keep up. Second, the author highlights the role of interdisciplinary collaboration in advancing conceptual innovations. Finally, the research elucidates the need for broader metatheoretical reflection to keep this research tradition on an upward trajectory.

Research limitations/implications

The aim of this study is not to criticize project marketing, as many strands of business-to-business (B2B) marketing face the same challenge, but to elucidate a need for conceptual innovations, collaboration with practitioners and other disciplines and broader metatheoretical reflection to keep this research tradition on an upward trajectory.

Originality/value

This study makes several contributions to the project marketing research tradition. First, it reviews the emergence and dissipation of the concept of discontinuity, drawing on semantical, etymological and epistemological insights. It also reflects on recent disruptions in the marketplace and envisions future research trajectories for this elusive concept. In addition, the author develops a conceptual framework that combines project types with exchange elements in project and service businesses. This conceptual framework helps elucidate what part of the exchange is continuing and what is discontinuing in the resulting business relationships. Furthermore, the research contributes to B2B marketing more broadly by highlighting the fleeting correspondence between theory and the real world. It underscores the need for constant updates to maintain relevance.

Details

Journal of Business & Industrial Marketing, vol. 39 no. 3
Type: Research Article
ISSN: 0885-8624

Keywords

1 – 10 of over 9000