Search results
1 – 10 of 14Vojtěch Šálek, Kamila Cábová, František Wald and Milan Jahoda
The purpose of this paper is to present a complex pyrolysis computational fluid dynamics (CFD) model of timber protection exposed to fire in a medium size enclosure. An emphasis…
Abstract
Purpose
The purpose of this paper is to present a complex pyrolysis computational fluid dynamics (CFD) model of timber protection exposed to fire in a medium size enclosure. An emphasis is placed on rarely used temperature-dependent thermal material properties effecting the overall simulation outputs. Using the input dataset, a fire test model with oriented strand boards (OSB) in the room corner test facility is created in Fire Dynamics Simulator (FDS).
Design/methodology/approach
Seven FDS models comprising different complexity approaches to modelling the burning of wood-based materials, from a simplified model of burning based on a prescribed heat release rate to complex pyrolysis models which can describe the fire spread, are presented. The models are validated by the experimental data measured during a fire test of OSB in the room corner test facility.
Findings
The use of complex pyrolysis approach is recommended in real-scale enclosure fire scenarios with timber as a supplementary heat source. However, extra attention should be paid to burning material thermal properties implementation. A commonly used constant specific heat capacity and thermal conductivity provided poor agreement with experimental data. When the fire spread is expected, simplified model results should be processed with great care and the user should be aware of possible significant errors.
Originality/value
This paper brings an innovative and rarely used complex pyrolysis CFD model approach to predict the behaviour of timber protection exposed to fire. A study on different temperature-dependent thermal material properties combined with multi-step pyrolysis in the room corner test scenario has not been sufficiently published and validated yet.
Details
Keywords
Milad Shabanian and Nicole Leo Braxtan
Thermomechanical behavior of intermediate-size beam-to-wall assemblies including Glulam-beams connected to cross-laminated timber (CLT) walls with T-shape steel doweled…
Abstract
Purpose
Thermomechanical behavior of intermediate-size beam-to-wall assemblies including Glulam-beams connected to cross-laminated timber (CLT) walls with T-shape steel doweled connections was investigated at ambient temperature (AT) and after and during non-standard fire exposure.
Design/methodology/approach
Three AT tests were conducted to evaluate the load-carrying capacity and failure modes of the assembly at room temperature. Two post-fire performance (PFP) tests were performed to study the impact of 30-min (PFP30) and 60-min (PFP60) partial exposure to a non-standard fire on the residual strength of the assemblies. The assemblies were exposed to fire in a custom-designed frame, then cooled and loaded to failure. A fire performance (FP) test was conducted to study the fire resistance (FR) during non-standard fire exposure by simultaneously applying fire and a mechanical load equal to 65% of the AT load carrying capacity.
Findings
At AT, embedment failure of the dowels followed by splitting failure at the Glulam-beam and tensile failure of the epoxy between the layers of CLT-walls were the dominant failure modes. In both PFP tests, the plastic bending of the dowels was the only observed failure mode. The residual strength of the assembly was reduced 14% after 30 min and 37% after 60 min of fire exposure. During the FP test, embedment failure of timber in contact with the dowels was the only major failure mode, with the maximum rate of displacement at 51 min into the fire exposure.
Originality/value
This is the first time that the thermomechanical performance of such an assembly with a full-contact connection is presented.
Details
Keywords
Abstract
Details
Keywords
Many entrepreneurs are able to manage their businesses within relatively contained and familiar geographical and cultural circles. With a world economy shrinking every day amid a…
Abstract
Many entrepreneurs are able to manage their businesses within relatively contained and familiar geographical and cultural circles. With a world economy shrinking every day amid a flood of digital information, todayʼs entrepreneur is increasingly confronted with opportunities to consider new ways to secure vendors and recruit customers. Many unfamiliar possibilities emerge. Should the entrepreneur venture beyond “comfortable” surroundings to consider international connections? Specifically, what about China? How practical is this fetching business temptation of larger markets and lower-cost subcontractors? What are the social, trade, financial, and political issues? Should a “China strategy” be a true entrepreneurial offensive, or rather a defensive response to competition? Is this “China strategy” the promise of yet another entrepreneurial nirvana? Or is it perhaps again a case of “Be careful of what you wish for; it may really come true?”
Robert Larsson and Martin Rudberg
This paper aims to study the effects of different weather conditions on typical concrete work tasks’ productivity. Weather is one important factor that has a negative impact on…
Abstract
Purpose
This paper aims to study the effects of different weather conditions on typical concrete work tasks’ productivity. Weather is one important factor that has a negative impact on construction productivity. Knowledge about how weather affects construction works is therefore important for the construction industry, e.g. during planning and execution of construction projects.
Design/methodology/approach
A questionnaire survey method is used involving means to perform pairwise comparisons of different weather factors according to the analytical hierarchical process (AHP). The survey also contains means to enable assessment of the loss in productivity for typical work tasks exposed to different weather types. The survey targets practitioners involved in Swedish concrete construction projects, and the results are compared with previous research findings.
Findings
The survey covers responses from 232 practitioners with long experience of concrete construction. The pairwise comparisons reveal that practitioners rank precipitation as the most important followed by wind and temperature. The loss in productivity varies significantly (from 0 to 100%) depending on the type of work and the type of weather factor considered. The results partly confirm findings reported in previous research but also reveal a more complex relationship between weather and productivity indicating several underlying influencing factors such as type of work, type of weather (e.g. rain or snow) and the intensity of each weather factor.
Originality/value
This paper presents new data about how 232 practitioners assess the effects of weather on construction productivity involving novel means to perform objective rankings such as the AHP methodology.
Details