Article
Publication date: 23 May 2023

Olabode Emmanuel Ogunmakinde, Temitope Egbelakin, Willy Sher, Temitope Omotayo and Mercy Ogunnusi

Establishing a more sustainable built environment is an increasing global concern for the construction industry. Despite the intrinsic and extrinsic obstacles the stakeholders…

Abstract

Purpose

Establishing a more sustainable built environment is an increasing global concern for the construction industry. Despite the intrinsic and extrinsic obstacles the stakeholders face, huge efforts are required to transition to a smooth, sustainable construction (SC) practice. This study identifies and discusses cogent obstacles to SC in developing nations.

Design/methodology/approach

The Preferred Reporting Item for systematic reviews and Meta-Analysis (PRISMA) approach was employed to establish research work in SC for developing countries. The databases used were Scopus and Web of Science. Meta-analysis of keywords was analysed thematically. The initial broad search returned 8,420 publications which were filtered and reviewed in-depth to fit the aim of the study, produced only 21 relevant publications from the years 2000–2021.

Findings

The four identified themes of obstacles to SC in developing countries are as follows: construction professional training and education, clients' attitudes and awareness, construction industries' culture and capacity and governments' regulation, policies and economy. The key barriers identified from the meta-analysis include inadequate training and education amongst construction professionals, poor execution of sustainability ethics, poor populace attitude towards sustainability, poor awareness and understanding, dearth of precise data and integrated study and inappropriate priorities about sustainability.

Originality/value

The originality in this study are themes drawn from millennium development goals (MDGs) and sustainable development goals (SDGs) publications related to SC. Consequently, the final framework presented a holistic approach to surmounting the established limitations and aided recommendations for future studies. Thus, setting a background for developing strategies to overcome the limitations and further attain sustainable development (SD).

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 3 May 2022

Olufisayo Adedokun and Temitope Egbelakin

Despite several research efforts tackling construction project risks globally, tertiary education building projects are not devoid of experiencing risks with cascading effects on…

Abstract

Purpose

Despite several research efforts tackling construction project risks globally, tertiary education building projects are not devoid of experiencing risks with cascading effects on projects. In the past decades, there has been increasing application of linear assessments of risks in construction risk management practices. However, this study aims to assess the influence of risk factors on the success of tertiary education building projects using a structural equation modelling approach. This study will further reinforce the risk factors that require attention because risk factors are not linear but interdependent.

Design/methodology/approach

A quantitative research method was undertaken in this study, where data collection was achieved via a structured questionnaire survey. In total, 452 questionnaires were administered to client representatives, consultants and contractors involved in executing tertiary education building projects across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were found usable for the analysis, implying a response rate of 61.73%. The Cronbach α test, average variances extracted and composite reliabilities values show high reliability and internal consistency of the instrument used for data gathering. Furthermore, the study adopted percentile, mean, correlation, regression analysis and structural equation modelling for analyzing the data collected upon which the study’s inferences were based.

Findings

The study found that three out of six criteria for measuring the success of tertiary education building projects were significantly affected by risk factors while using the structural equation modelling technique. With this non-linear method of assessment, completion to time was significantly impacted by environmental risk factors. In addition, safety performance was also significantly influenced by logistic, environmental and legal risk factors; furthermore, logistics, design and environmental risks significantly affected profit. However, completion to cost, standard/quality and end-user satisfaction was not significantly affected by the risk factors in tertiary education building projects.

Research limitations/implications

The quantitative data used for the analysis are limited to the tertiary education building projects from selected five tertiary education institutions in Ondo State; therefore, the results do not indicate all tertiary institutions in Nigeria. In addition, the findings are based on building projects that were procured through a competitive tendering arrangement only and thus considered a limitation for this study.

Practical implications

Not all the risks significantly influence the tertiary education building projects. Therefore, risk factors with a significant effect on the success indicators of tertiary education building projects should be prioritized for a successful project. While risk factors have not affected the completion to cost per se, the study implies that the resultant effect of risks on other success indicators could have a cascading effect on these projects in terms of cost and time overruns. These results may assist during the project risk management while also addressing complexity and uncertainty to avoid chaos in a tertiary education building projects.

Originality/value

The study found significant construction risk factors impacting the success of tertiary education building projects using a non-linear methodology, an extension beyond the usual linear method of assessment of risk impacts on the project performance.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 23 November 2021

Olufisayo Adewumi Adedokun, Temitope Egbelakin, Deborah Oluwafunke Adedokun and Johnson Adafin

Despite the huge capital outlay in tertiary education building projects (TEBP), these projects undoubtedly failed in meeting the set objectives of cost, time and quality, among…

Abstract

Purpose

Despite the huge capital outlay in tertiary education building projects (TEBP), these projects undoubtedly failed in meeting the set objectives of cost, time and quality, among others. Therefore, rather than the impacts of risks on the overall project performance, which is common in the construction management literature, the purpose of this study is to assess the impacts of risk factors on the criteria for measuring the success of public TEBP.

Design/methodology/approach

The paper adopted a quantitative research method where the data collection was via a questionnaire survey. The researcher administered 452 questionnaires to the client representatives, consultants and contractors involved in building projects across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were retrieved and suitable for the analysis, translating to a 61.73% response rate. The reliability analysis of the research instrument showed 0.965 and 0.807, via Cronbach’s alpha test, indicating high reliability of the instrument used for data collection.

Findings

The study found different risk factors affecting the criteria for measuring the success of TEBP. For instance, the environmental risk factor significantly impacted completion to cost, while financial and political risk factors significantly impacted completion to time. In addition, while environmental, legal and management risks significantly impacted end-user satisfaction, safety performance was significantly impacted by logistic, legal, design, construction, political and management risks. Besides, the logistic, legal, design, construction, financial, political and management risk factors impacted profit. However, despite profit being one of the criteria for measuring the success of building projects, it recorded the highest risk impacts amounting to 41% variance.

Research limitations/implications

The findings are limited to the public tertiary education building projects procured via competitive tendering; therefore, the results might differ when considering other procurement methods.

Practical implications

The practical implication is that rather than focusing on all risk factors, the project stakeholders could give adequate attention to the significant risk factors impacting each of the parameters for measuring the success of education building projects.

Originality/value

The study revealed specific risk factors impacting the criteria for measuring the success of TEBP, which extend beyond the use of the overall project performance approach.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531