Search results

11 – 20 of over 5000
Article
Publication date: 15 January 2019

Grazia Di Giovanni and Lorenzo Chelleri

The purpose of this paper is to explore the concept of build back better (BBB) in contexts affected by depopulation and shrinking economies discussing how and if its principles…

Abstract

Purpose

The purpose of this paper is to explore the concept of build back better (BBB) in contexts affected by depopulation and shrinking economies discussing how and if its principles are able to drive the recovery pattern toward a sustainability re-development path.

Design/methodology/approach

BBB principles’ usefulness in driving toward a sustainable post-disaster recovery has been tested in L’Aquila’s area (Italy) – severely affected by an earthquake in 2009 – through interviews and analyses of reconstruction plans and policies.

Findings

Although most of the BBB principles can be recognized within the intentions of plans and policies, the recovery process highlights a major fallacy in addressing the pre-disaster socio-economic stresses inducing to shrinkage and depopulation development lock-ins.

Practical implications

Although most of the principles can be recognized in the intentions of plans and policies, the recovery process highlights a main fallacy of the “BBB paradigm”: the need of addressing pre-disaster socio-economic stresses while recovering from the shocks was not explicitly nor implicitly addressed.

Originality/value

Shrinkage as a process of territorial transformation has been little explored in relation to natural hazards and post-disaster contexts. Indeed, while from one side BBB concept and principles drive toward a potential mitigation of the main risks while re-building, it results challenging to overcome the built environment re-building priorities to question whether, what and how to re-build while investing in socio-economic recovery. Reverting, or accepting, shrinkage could indeed implies to not build back part of the urban fabric, while investing in skills and capacity building, which, in turn, would be difficult to justify through the reconstruction budget. The tension between re-building (better, the built environment) and re-development (skills and networks, at the expense of re-building) is critical when BBB faces disasters happening in shrinking territories.

Details

Disaster Prevention and Management: An International Journal, vol. 28 no. 4
Type: Research Article
ISSN: 0965-3562

Keywords

Article
Publication date: 1 March 2006

Pedro Ferradas

Intermediate Technology Development Group (ITDG) recently completed the systematisation of their reconstruction projects which were implemented between the early 1990s and the…

Abstract

Intermediate Technology Development Group (ITDG) recently completed the systematisation of their reconstruction projects which were implemented between the early 1990s and the year 2003 in the poor areas of Peru affected by disasters or internal war. Within these projects, technological housing reconstruction schemes were designed and validated as part of an effort to reduce the vulnerability of the affected population. 1,300 houses were built during 5 years; 600 houses between April 1992 and April 1994 and 700 houses between July 2001 and July 2003. The key factors for successful risk reduction identified during post-disaster reconstruction were: the location of reconstructed housing, the construction procedures and materials employed, the improvement of people's self-construction techniques, and the improvement of local risk-management skills.

ITDG's first experience in Alto Mayo during the early 1990s involved participatory management at a local level and the use of the so-called improved “wattle and daub technology” (i.e. structural reinforcement of mud, wood and cane buildings). This technique is more earthquake-proof than the construction technology predominating in Peru (i.e. cement and iron-based structures). The experience in Ayacucho, which concluded in 2001, provided the opportunity to apply the so-called “improved adobe technique” (i.e. structural reinforcement of mud buildings), as well as to install community water supply systems. The reconstruction work in Moquegua and Tacna, completed in 2003, was based on the organisation of workshops geared towards encouraging the participation of women in the use of various housing construction technologies and providing the facilities for them to adapt such technologies to traditional architecture.

This article highlights the ITDG approach and experiences to post-disaster reconstruction: the main activities carried out in preparation for and during the implementation of the projects, the lessons obtained during these experiences, and the monitoring and evaluation procedures recommended for future reconstruction projects.

Details

Open House International, vol. 31 no. 1
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 7 November 2008

John R. Labadie

This paper seeks to explore the application of auditing and quality assurance principles and practices to the planning and implementation of post‐disaster recovery and…

2831

Abstract

Purpose

This paper seeks to explore the application of auditing and quality assurance principles and practices to the planning and implementation of post‐disaster recovery and reconstruction.

Design/methodology/approach

The paper notes the risk to a disaster recovery organization's credibility if fraud and poor performance are apparent in its efforts to support disaster recovery and reconstruction, and it provides examples of relief organizations' efforts to ensure that their actions are both credible and effective. The paper examines the complex and multi‐faceted processes of post‐disaster recovery and reconstruction, and it describes the growing emphasis around the world on social justice/equity issues and the importance of proper governance. It explores the advantages and pitfalls of incorporating auditing practices into the effective implementation of recovery and reconstruction activities. The paper concludes with a discussion of the importance to the affected communities of knowing that expenditures – both financial and emotional – will achieve something better.

Findings

Recovery and reconstruction efforts can help to mitigate possible future disaster effects by making the community more sustainable and more survivable. Mechanisms for assessing whether recovery funds were well spent are often weak or missing. A potential solution is to adapt and apply the processes and protocols of performance auditing and performance measurement to recovery and reconstruction – identifying risks and controls, setting measurable targets, assessing whether sustainability and survivability goals are met.

Originality/value

Recovery and reconstruction efforts would gain greater credibility with aid donors, stakeholders, and the affected public by having formal programs in place for assessing recovery performance

Details

Disaster Prevention and Management: An International Journal, vol. 17 no. 5
Type: Research Article
ISSN: 0965-3562

Keywords

Article
Publication date: 9 November 2015

Junqi Zhang, Weiwu Zou and Mohan Kumaraswamy

The paper aims to integrate relevant “people” into public-private partnerships (PPP) to establish a public–private–people partnership (4P) approach that targets more sustainable

Abstract

Purpose

The paper aims to integrate relevant “people” into public-private partnerships (PPP) to establish a public–private–people partnership (4P) approach that targets more sustainable and better value for money post-disaster infrastructure projects. This recognises “people” as major stakeholders apart from the public and private sectors. This paper also draws on a parallel study of relationship management (RM) to counteract problems arising from multiple participants and to synergise the public, private and “people” groupings.

Design/methodology/approach

Semi-structured interviews, questionnaire surveys, a case study and a validation exercise through a focus group meeting were adopted to obtain empirical data and develop the 4P framework. Triangulation research strategy combining literature review, interviews and questionnaire survey were adopted in the parallel study of RM.

Findings

It is concluded that 4P has great potential to achieve the targets of enhanced sustainability and value of money in post-disaster scenarios. In addition, “people” can provide the “missing link” in traditional PPP to further cement the partnership and achieve effective and integrated partnership between multiple participants.

Originality/value

This paper adds a new dimension to PPP in proposing the integration of “people” into PPP to address prevalent gaps in identifying overall sustainable value. It also develops a practical 4P framework to guide practitioners who may wish to test it, to whatever extent possible. In parallel, it provides a methodological and theoretical foundation for such public, private and people partnerships in post-disaster infrastructure development.

Details

International Journal of Disaster Resilience in the Built Environment, vol. 6 no. 4
Type: Research Article
ISSN: 1759-5908

Keywords

Article
Publication date: 23 July 2024

Fatma Özdoğan, Gonzalo Lizarralde and Benjamin Herazo

In this paper, we explore the impact of land management practices on post-disaster housing, to draw lessons from the case of reconstruction in Türkiye.

Abstract

Purpose

In this paper, we explore the impact of land management practices on post-disaster housing, to draw lessons from the case of reconstruction in Türkiye.

Design/methodology/approach

We conducted two qualitative case studies of two reconstruction experiences following the 2020 Elazığ and İzmir earthquakes. We analyzed 70 articles, technical reports and press releases and then used a set of policy analysis tools to examine five policy documents in depth. Finally, we wanted to understand how key officers interpreted these policy documents, so we closely analyzed the transcripts of eight semi-structured interviews.

Findings

Türkiye’s legal framework comprises five main policies that concentrate power in the central government and are not tailored to post-disaster reconstruction. This framework facilitates the construction of rubber-stamped apartment buildings, which disregard cultural and social contexts and practices. The current reconstruction policy neglects alternative options like cooperative housing, which could better respond to communal needs and expectations. It also often leads to the loss of land rights among affected residents.

Research limitations/implications

We only analyzed decision-making processes in two case studies and based our study on a limited number of interviews. Therefore, it is difficult to generalize our results and apply them to other contexts. Further quantitative and qualitative work is necessary to conceptualize the links between land management and post-disaster housing reconstruction.

Practical implications

Our findings suggest a need for legislative frameworks specifically designed to address land management during post-disaster reconstruction. The concentration of power in central governments is problematic, thus it remains crucial to empower local authorities by reinforcing technical expertise and facilitating administrative autonomy.

Originality/value

This study offers unique insights into how power relations influence land management practices in post-disaster housing reconstruction. Examining the centralization of power and its impact on cultural and social practices identifies common forms of dispossession and points to key areas for policy improvement.

Details

Disaster Prevention and Management: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0965-3562

Keywords

Article
Publication date: 1 January 2006

Hens Runhaar, Carel Dieperink and Peter Driessen

The paper seeks to propose the basic competencies of environmental social scientists regarding policy analysis for sustainable development. The ultimate goal is to contribute to…

6030

Abstract

Purpose

The paper seeks to propose the basic competencies of environmental social scientists regarding policy analysis for sustainable development. The ultimate goal is to contribute to an improvement of educational programmes in higher education by suggesting a toolbox that should be integrated in the curriculum.

Design/methodology/approach

Starting from the basic research questions regarding governance for sustainable development, five methods are identified capable of answering the following questions: reconstruction of policy theories; stakeholder analysis; impact assessment; cost‐benefit analysis; discourse analysis. Relevant information was collected through a literature review and practical experience by the authors.

Findings

These include: minimum content of the toolbox with methods of policy analysis for sustainable development; examples of how the toolbox can be applied; strengths and weaknesses of the methods; specification of competencies of environmental social scientists active in the area of policy analysis for sustainable development.

Practical implications

The paper proposes which methods of policy analysis for sustainable development should be integrated in higher education as well as how this should be done.

Originality/value

The paper systematically analyses the implications of the policy context in the domain of sustainable development for policy analysis in this area. In addition it gives a review of five basic methods: how they can be used to analyse policy issues from a sustainable development perspective. Aiming at reinforcing the input of scientific research in policy‐making, the paper eventually aims to promote sustainable development.

Details

International Journal of Sustainability in Higher Education, vol. 7 no. 1
Type: Research Article
ISSN: 1467-6370

Keywords

Open Access
Article
Publication date: 11 July 2016

Richard Haigh, Siri Hettige, Maheshika Sakalasuriya, G. Vickneswaran and Lasantha Namal Weerasena

The purpose of this paper is to critically analyse the role of housing reconstruction projects in post conflict and post tsunami Sri Lanka, and to discuss their implications on…

3725

Abstract

Purpose

The purpose of this paper is to critically analyse the role of housing reconstruction projects in post conflict and post tsunami Sri Lanka, and to discuss their implications on conflict prevention.

Design/methodology/approach

Using four housing reconstruction projects in Batticaloa, Kilinochchi and Jaffna Districts, Sri Lanka, as case studies, and a novel methodological framework, the study explores the causal relations among the independent variables associated with housing reconstruction and dependent variables related to conflict prevention. The data, gathered from interviews and project reports, were analysed using propositions from a literature review, adopting a thematic analytical approach.

Findings

This study finds that reconstruction has created new forms of conflicts and tensions for the people who came to live in the newly constructed houses. The hostile relations that existed among different ethnic groups during the conflict were continued, and to some extent, exacerbated by the reconstruction undertaken after the war.

Practical implications

The study identifies causal relations among the independent variables associated with housing reconstruction and dependent variables related to conflict prevention, which can be used to inform physical reconstruction programmes after conflict.

Originality/value

The research presents a novel methodological framework. The results reveal concerns in housing and infrastructure development that have implications for future research and practice in post conflict environments.

Details

Disaster Prevention and Management: An International Journal, vol. 25 no. 5
Type: Research Article
ISSN: 0965-3562

Keywords

Article
Publication date: 1 October 2011

Peter Arthur

There have recently been concerted efforts by many post‐conflict African countries to formulate and implement policies and measures that will reconstruct and develop their…

Abstract

There have recently been concerted efforts by many post‐conflict African countries to formulate and implement policies and measures that will reconstruct and develop their societies. Much of the discussions of realizing post‐conflict reconstruction and development have generally focused on disarmament, demobilisation and reintegration (DDR) of ex‐combatants. What is however, missing is a discussion on capacity development and capacity building initiatives to help in reconstruction in the period after DDR. This paper therefore examines the importance of capacity development in post‐conflict African environment. It notes that while demobilising and disarming warring factions is important, the success of reconstruction efforts in a post‐conflict environment depends largely on the ability to build and develop capacity and skills that are pertinent to helping reconstruct and promote the development goals of the countries. It is argued that post‐conflict societies should have a coherent and co‐ordinate approach to rebuilding, reconstructing and developing the capacity of the state in order to achieve the state’s legitimacy and effectiveness. Such capacity development measures should involve the development of physical infrastructure; the building of the state’s institutional structures; the promotion of good political and economic governance; skills and education training for individuals; and measures to improve and deliver security and social services.

Details

World Journal of Entrepreneurship, Management and Sustainable Development, vol. 7 no. 2/3/4
Type: Research Article
ISSN: 2042-5961

Keywords

Article
Publication date: 7 September 2015

Krisanthi Seneviratne, Dilanthi Amaratunga and Richard Haigh

Despite the role of post conflict housing reconstruction in establishing the development of peace in conflict affected countries, there are many issues which hinder its success…

Abstract

Purpose

Despite the role of post conflict housing reconstruction in establishing the development of peace in conflict affected countries, there are many issues which hinder its success. While the inconsideration of housing needs in post conflict housing reconstruction has directly or indirectly given rise for most of the issues, the countries emerging from conflicts face many challenges in addressing such housing needs. Therefore, the purpose of this paper is to explore the management of housing needs in post conflict housing reconstruction. This paper aims to focus on identifying the challenges in addressing housing needs within the context of post conflict housing reconstruction in Sri Lanka.

Design/methodology/approach

The study used the grounded theory approach to collect and analyse the data collected through 37 in-depth interviews, conducted with policy makers, practitioners, academics and housing beneficiaries in Sri Lanka. Primary data were verified through a documents review.

Findings

The paper reveals that addressing housing needs in post conflict housing reconstruction in Sri Lanka is challenging, due to several factors. These include the socio economic profile of conflict affected people, conflict sensitive issues, donor requirements, limited availability of finance, weakened government administration, extent of housing and infrastructure damage, attitudes of affected people, land-related issues and shortage of labour and material.

Originality/value

A number of studies have identified the challenges of post conflict reconstruction. This study particularly identifies the challenges of addressing housing needs in post conflict housing reconstruction. These findings are useful for policy makers to develop strategies in addressing housing needs in post conflict housing reconstruction.

Details

Built Environment Project and Asset Management, vol. 5 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 31 August 2010

Arnim Wiek, Robert Ries, Lanka Thabrew, Katja Brundiers and Anoja Wickramasinghe

Sustainable housing and community recovery processes in the aftermath of tsunamis have to cope with direct impacts, such as fatalities, destroyed buildings, and loss of economic…

1596

Abstract

Purpose

Sustainable housing and community recovery processes in the aftermath of tsunamis have to cope with direct impacts, such as fatalities, destroyed buildings, and loss of economic assets, as well as indirect impacts caused by shortcomings in recovery management. Recent studies on post‐tsunami recovery tend to focus on direct impacts, ranging from monitoring to prevention studies. Less attention is paid to recovery as a complex bundle of multi‐agent processes causing subsequent problems.

Design/methodology/approach

The paper presents results from field studies evaluating post‐tsunami recovery processes in Sri Lanka against the concept of sustainable housing and community recovery. Semi‐structured observations and interviews were conducted on eight sites in the south‐western part of Sri Lanka during field visits 2005‐2006. The research involved beneficiaries and other citizens, representatives from government and administration, field workers (non‐governmental organizations), and scientists.

Findings

Empirical findings identify subsequent problems for specific capital forms, across different capital forms, and across different administrative levels. Moreover, critical issues refer to conceptualizing temporal horizons, comprehensive planning and decision making, stakeholders' involvement, and institutional embedding of recovery processes.

Originality/value

Against this empirical background, the paper indicates improvement potentials referring to literature on comprehensive and adaptive planning to address the sustainable recovery challenges identified. The paper provides guidance for researchers, decision makers, planners, and field workers engaged in post‐disaster sustainable development.

Details

Disaster Prevention and Management: An International Journal, vol. 19 no. 4
Type: Research Article
ISSN: 0965-3562

Keywords

11 – 20 of over 5000