1 – 4 of 4Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar
Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…
Abstract
Purpose
Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.
Design/methodology/approach
Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.
Findings
The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.
Originality/value
Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.
Details
Keywords
Xin Li, Jianzhong Shang and Zhuo Wang
The paper aims to promote the development of intelligent materials and the 4D printing technology by introducing recent advances and applications of additive layered manufacturing…
Abstract
Purpose
The paper aims to promote the development of intelligent materials and the 4D printing technology by introducing recent advances and applications of additive layered manufacturing (ALM) technology of intelligent materials and the development of the 4D printing technology. Also, an arm-type ALM technology of shape memory polymer (SMP) with thermosetting polyurethane is briefly introduced.
Design/methodology/approach
This paper begins with an overview of the development and applications of intelligent materials around the world and the 4D printing technology. Then, the authors provide a brief outline of their research on arm-type ALM technology of SMP with thermosetting polyurethane.
Findings
The paper provides the recent developments and applications of intelligent materials and 4D printing technology. Then, it is suggested that intelligent materials mixed with different functional materials will be developed, and these types of materials will be more suitable for 4D printing.
Originality/value
This paper overviews the current developments and applications of intelligent materials and its use in 4D printing technology, and briefly states the authors’ research on arm-type ALM technology of SMP with thermosetting polyurethane.
Details
Keywords
Luís Jacques de Sousa, João Poças Martins and Luís Sanhudo
Factors like bid price, submission time, and number of bidders influence the procurement process in public projects. These factors and the award criteria may impact the project’s…
Abstract
Purpose
Factors like bid price, submission time, and number of bidders influence the procurement process in public projects. These factors and the award criteria may impact the project’s financial compliance. Predicting budget compliance in construction projects has been traditionally challenging, but Machine Learning (ML) techniques have revolutionised estimations.
Design/methodology/approach
In this study, Portuguese Public Procurement Data (PPPData) was utilised as the model’s input. Notably, this dataset exhibited a substantial imbalance in the target feature. To address this issue, the study evaluated three distinct data balancing techniques: oversampling, undersampling, and the SMOTE method. Next, a comprehensive feature selection process was conducted, leading to the testing of five different algorithms for forecasting budget compliance. Finally, a secondary test was conducted, refining the features to include only those elements that procurement technicians can modify while also considering the two most accurate predictors identified in the previous test.
Findings
The findings indicate that employing the SMOTE method on the scraped data can achieve a balanced dataset. Furthermore, the results demonstrate that the Adam ANN algorithm outperformed others, boasting a precision rate of 68.1%.
Practical implications
The model can aid procurement technicians during the tendering phase by using historical data and analogous projects to predict performance.
Social implications
Although the study reveals that ML algorithms cannot accurately predict budget compliance using procurement data, they can still provide project owners with insights into the most suitable criteria, aiding decision-making. Further research should assess the model’s impact and capacity within the procurement workflow.
Originality/value
Previous research predominantly focused on forecasting budgets by leveraging data from the private construction execution phase. While some investigations incorporated procurement data, this study distinguishes itself by using an imbalanced dataset and anticipating compliance rather than predicting budgetary figures. The model predicts budget compliance by analysing qualitative and quantitative characteristics of public project contracts. The research paper explores various model architectures and data treatment techniques to develop a model to assist the Client in tender definition.
Details
Keywords
Alfonso Siano, Maria Giovanna Confetto, Agostino Vollero and Claudia Covucci
In the democratic digital environment, brand managers frequently deal with the unauthorized use of the brand by third parties. The phenomenon, known as brand hijacking, has been…
Abstract
Purpose
In the democratic digital environment, brand managers frequently deal with the unauthorized use of the brand by third parties. The phenomenon, known as brand hijacking, has been treated in different and sometimes conflicting ways in the academic and professional literature. The aim of this paper is to clarify the meaning of brand hijacking and to shed light on the various motivations and intentions underpinning the phenomenon.
Design/methodology/approach
A Delphi-based survey among both academic and professional experts was conducted to explore the key features of brand hijacking and expand existing theories.
Findings
The results of the Delphi survey enable the main brand hijacking actions to be mapped, based on two motivational axes (utilitarian–idealistic and destructive–constructive) and on the various intentions that guide the hijackers. The results help re-define the key elements of brand hijacking, through the lens of non-collaborative brand co-creation.
Practical implications
Managerial implications are presented in terms of the corporate response to the two main effects of hijacking, namely, brand reputational damage and brand repositioning.
Originality/value
The paper helps to shed light on the main components of brand hijacking, thus gaining expert consensus in refining the existent conceptualization in relation to a rapidly changing brand management scenario because of the gradual loss by brand managers of their traditional control.
Details