Search results

1 – 10 of 27
Article
Publication date: 12 September 2016

Ji Yan, Kun Tian, Saeed Heravi and Peter Morgan

This paper aims to investigate consumers’ demand patterns for products with nutritional benefits and products with no nutritional benefits across processed healthy and unhealthy…

Abstract

Purpose

This paper aims to investigate consumers’ demand patterns for products with nutritional benefits and products with no nutritional benefits across processed healthy and unhealthy foods. This paper integrates price changes (i.e. increases and decreases) into a demand model and quantifies their relative impact on the quantity of food purchased. First, how demand patterns vary across processed healthy and unhealthy products is investigated; second, how demand patterns vary across nutrition-benefited (NB) products and non-nutrition-benefited (NNB) products is examined; and third, how consumers respond to price increases and decreases for NB across processed healthy and unhealthy foods is investigated.

Design/methodology/approach

Here, a demand model quantifying scenarios for price changes in consumer food choice behaviour is proposed, and controlled for heterogeneity at household, store and brand levels.

Findings

Consumers exhibit greater sensitivity to price decreases and less sensitivity to price increases across both processed healthy and unhealthy foods. Moreover, the research shows that consumers’ demand sensitivity is greater for NNB products than for NB products, supporting our prediction that NB products have higher brand equity than NNB products. Furthermore, the research shows that consumers are more responsive to price decreases than price increases for processed healthy NB foods, but more responsive to price increases than price decreases for unhealthy NB foods. The findings suggest that consumers exhibit a desirable demand pattern for products with nutritional benefits.

Originality/value

Although studies on the effects of nutritional benefits on demand have proliferated in recent years, researchers have only estimated their impact without considering the effect of price changes. This paper contributes by examining consumers’ price sensitivity for NB products across processed healthy and unhealthy foods based on consumer scanner data, considering both directionalities of price changes.

Details

European Journal of Marketing, vol. 50 no. 9/10
Type: Research Article
ISSN: 0309-0566

Keywords

Article
Publication date: 18 February 2021

Ali Fathalizadeh, M. Reza Hosseini, Seyyed Saeed Vaezzadeh, David J. Edwards, Igor Martek and Salman Shooshtarian

The barriers to integrating sustainable practices into construction project management require extensive resource allocations to resolve. Within developing countries such as Iran…

1492

Abstract

Purpose

The barriers to integrating sustainable practices into construction project management require extensive resource allocations to resolve. Within developing countries such as Iran (where resources are scarce), remedial strategies adopted must prioritise tackling those barriers that can be expected to yield maximum return on investment. The candidate barriers are many, and this paper aims to identify a hierarchy of barriers, providing a priority list of remedial targets.

Design/methodology/approach

A mixed philosophical stance of interpretivism and post-positivism is adopted within a deductive approach and survey strategy. A list of 30 known barriers are identified from extant literature and used to formulate a questionnaire data collection instrument administered within the Iranian construction industry. Data collected from 176 practitioners are analysed using the relative importance index and Mann–Whitney U test to compare groups based on the participants' demographic variables.

Findings

The findings challenge the common assumption that items related to market and workforce experience are major inhibitors of change. That is, economics and regulatory dependent barriers have a higher impact on the failure of a shift to sustainable practices in Iran. The most influential barriers to incorporating sustainability in construction projects are: (1) lack of understanding of the potential benefits; (2) insufficient cooperation among practitioners, research institutions and environmental organisations; and (3) a lack of a systematic approach to pursuing sustainability goals. No significant associations are detected between the affiliation of the respondents and their attitude towards the issue. Thus, a generalised approach can be applied to a broader range of organisations and construction projects in Iran.

Originality/value

While studies on sustainability impediments at the firm or project level are ubiquitous within literature, this research identifies that the most significant barriers to sustainable project management in Iran, as an underexplored context, are those experienced at the economic and institutional level. Moreover, this novel research presents important insights into the potential effects of participants' demographic profiles on their view of the importance of identified barriers.

Details

Smart and Sustainable Built Environment, vol. 11 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 16 September 2022

Ali Mohammad Mirzaee, Towhid Pourrostam, Javad Majrouhi Sardroud, M. Reza Hosseini, Payam Rahnamayiezekavat and David Edwards

Public–private partnerships (PPPs) are notoriously prone to disputes among stakeholders, some of which may unduly jeopardize contract performance. Contract disputes arising in…

Abstract

Purpose

Public–private partnerships (PPPs) are notoriously prone to disputes among stakeholders, some of which may unduly jeopardize contract performance. Contract disputes arising in Iran are often due to inefficiency of PPP concession agreements and practice. This study presents a causal-predictive model of the root causes and preventive measures for inter-organization disputes to enhance the likelihood of achieving desirable performance in PPP projects.

Design/methodology/approach

A theoretical “causal-predictive” model was developed with fourteen hypotheses based on extant literature and contractual agency theory, which resulted in the creation of a pool of 110 published items. Data were obtained from a questionnaire survey with 75 valid responses, completed by 4 stratified groups of Iranian PPP experts. Partial least square structural equation modeling (PLS-SEM) was used for validating the proposed model via a case study.

Findings

Results reveal that the main three factors of PPP desirable performance are as follows: on-time project completion, high quality of activities/products and services for public satisfaction. Further, the most influential factors of the lifecycle problems, construction stage, and preferred risk allocation included risk misallocation, improper payment mechanism and failure to facilitate a timely approval process.

Originality/value

For researchers, the findings contribute to the theory of contractual agency; specifically, how different influences among the model's elements lead to better PPP performance. In practical terms, proposed outcome-based strategies will inform PPP stakeholders to avoid dispute occurrence and thus improve the time, quality and services of projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 April 2018

Akintayo Opawole and Godwin Onajite Jagboro

The purpose of this paper is to develop compensation mechanisms against risks factors that impact private party’s costs in concession-based projects as a basis for minimizing…

Abstract

Purpose

The purpose of this paper is to develop compensation mechanisms against risks factors that impact private party’s costs in concession-based projects as a basis for minimizing failure rate of concession contracts.

Design/methodology/approach

The study extended earlier work on the factors that impact private party’s costs in concession-based projects by developing compensation mechanisms against the risks factors. It commenced with semi-structured face-to-face interviews which were launched with different stakeholders organizations that had been involved in PPP contracts in the Southwestern Nigeria. Responses from the interview were analyzed using interpretative phenomenal analysis via ATLAS.ti6/7. The mechanisms identified from literature review were assessed through structured questionnaire which were administered on professionals selected from governmental-based organizations (ministries, agencies, corporations/parastatals, etc.), private developers/concessionaires, law firms, banks among others, using the respondent-driven sampling technique. The robustness of the quantitative data was achieved by including the initial respondents to the interview in the questionnaire survey. The quantitative data were analyzed using percentile for better understanding of the flexibility between “most” and “more” preferred mechanisms. The criterion for the selection of appropriate mechanism(s) for the factors was based on minimum average of 20.0 percent (the ratio of maximum percentage (100 percent) of the respondents to total number of variables) suggesting the five identified mechanisms. The results in both cases of qualitative and quantitative assessments were compared. Based on the convergences of the findings, preferred compensation mechanisms were developed against concession contract risk factors.

Findings

Options of mechanisms were developed against specific investment risks that are consequent to the defaults of the public party in PPP contracts. The findings indicate that the mechanisms in extant literature with respect to administration of traditional models are relevant for PPPs. The study, however, identified new concepts, including “compensative” “zero compensation,” “equitable sharing” and “adjustment of concession period,” which are suitable in specific cases of PPP contracts.

Practical implications

The study contributes to the body of knowledge on mechanisms for improving PPP project performance. Moreover, insights were provided on mechanisms that satisfy private investor in case of specific risk factors investigated. The findings are therefore expected to guide private party in the preparation of concession contract package that minimizes investments risks and thereby attracting more private investors both from local and international environments. The findings of the study would also contribute to the body of information for documenting standard conditions of concession contract in Nigeria.

Originality/value

Studies on critical performance factors on PPP were extended by developing compensation mechanisms against the investment risks that impact private party’s cost.

Details

International Journal of Building Pathology and Adaptation, vol. 36 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 3 June 2021

Nima Amani, Abdul Amir Reza Soroush, Mostafa Moghadas Mashhad and Keyvan Safarzadeh

The purpose of this paper is to examine the feasibility and design of zero-energy buildings (ZEBs) in cold and semi-arid climates. In this study, to maximize the use of renewable…

Abstract

Purpose

The purpose of this paper is to examine the feasibility and design of zero-energy buildings (ZEBs) in cold and semi-arid climates. In this study, to maximize the use of renewable energy, energy consumption is diminished using passive solar architecture systems and techniques.

Design/methodology/approach

The case study is a residential building with a floor area of 100 m2 and four inhabitants in the cold and semi-arid climate, northeast of Iran. For thermal simulation, the climate data such as air temperature, sunshine hours, wind, precipitation and hourly sunlight, are provided from the meteorological station and weather databases of the region. DesignBuilder software is applied for simulation and dynamic analysis of the building, as well as PVsyst software to design and evaluate renewable energy performance.

Findings

The simulation results show a 30% decrease in annual energy consumption of the building by complying with the principles of passive design (optimal selection of direction, Trombe wall, shade, proper insulation selection) from 25,443 kWh to 17,767 kWh. Then, the solar energy photovoltaic (PV) system is designed using PVsyst software, taking into account the annual energy requirement and the system’s annual energy yield is estimated to be 26,291 kWh.

Originality/value

The adaptive comparison of the values obtained from the energy analysis indicated that constructing a ZEB is feasible in cold and semi-arid conditions and is considered an effective step to achieve sustainable and environmentally friendly construction.

Book part
Publication date: 16 December 2016

Shipeng Yan and Fabrizio Ferraro

Socially responsible investing (SRI) funds depart from mainstream finance by incorporating environmental, social, and governance considerations, but their success varies across…

Abstract

Socially responsible investing (SRI) funds depart from mainstream finance by incorporating environmental, social, and governance considerations, but their success varies across regions. By using a historical comparative case design, we identify an empirically puzzling phenomenon in China: despite an initially favorable resource environment and the presence of socially skilled institutional entrepreneurs, SRI wanes over time in Hong Kong but survives in Mainland China where initial resource endowments and actors’ social skills were inferior. By comparing four periods of SRI development, we reveal how state sustainable development policies, a change in the institutional context, led unintentionally to a shared orientation and a public pool of resources, which sustained the SRI niche. Our paper contributes to research on market emergence, institutional change, and cultural entrepreneurship.

Article
Publication date: 22 July 2019

Ammar Saeed Mohammed Moohialdin, Fiona Lamari, Marc Miska and Bambang Trigunarsyah

The purpose of this paper shows the effect of hot and humid weather conditions (HHWCs) on workers that has resulted in considerable loss in the construction industry, especially…

Abstract

Purpose

The purpose of this paper shows the effect of hot and humid weather conditions (HHWCs) on workers that has resulted in considerable loss in the construction industry, especially during the hottest periods due to decline in worker productivity (WP). Until the last few decades, there is very limited research on construction WP in HHWCs. Nevertheless, these studies have sparked interests on seeking for the most appropriate methods to assess the impact of HHWCs on construction workers.

Design/methodology/approach

This paper begins by reviewing the current measuring methods on WP in HHWCs, follows by presenting the potential impact of HHWCs on WP. The paper highlights the methodological deficiencies, which consequently provides a platform for scholars and practitioners to direct future research to resolve the significant productivity loss due to global warming. This paper highlights the need to identify the limitations and advantages of the current methods to formulate a framework of new approaches to measure the WP in HHWCs.

Findings

Results show that the methods used in providing real-time response on the effects of HHWCs on WP in construction at project, task and crew levels are limited. An integration of nonintrusive real-time monitoring system and local weather measurement with real-time data synchronisation and analysis is required to produce suitable information to determine worker health- and safety-related decisions in HHWCs.

Originality/value

The comprehensive literature review makes an original contribution to WP measurements filed in HHWCs in the construction industry. Results of this review provide researchers and practitioners with an insight into challenges associated with the measurements methods and solving practical site measurements issues. The findings will also enable the researchers and practitioners to bridge the identified research gaps in this research field and enhance the ability to provide accurate measures in HHWCs. The proposed research framework may promote potential improvements in the productivity measurements methods, which support researchers and practitioners in developing new innovative methods in HHWCs with the integration of the most recent monitoring technologies.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 May 2022

Shima Amini, Alireza Rezvani, Mohsen Tabassi and Seyed Saeed Malek Sadati

Cost overruns have been identified as the most significant challenge for construction sector stakeholders. Like many developing countries, the Iranian construction industry…

1482

Abstract

Purpose

Cost overruns have been identified as the most significant challenge for construction sector stakeholders. Like many developing countries, the Iranian construction industry suffers from poor cost performance. So, the current research aims to investigate the causes of cost overrun in Iranian construction projects. This paper also reviews the findings of similar studies conducted in several Asian countries.

Design/methodology/approach

This paper includes a literature review and a quantitative method with a questionnaire survey. The review is limited to the studies investigating the causes of cost overrun in an Asian country in the last decade. Moreover, the current research was conducted through a questionnaire prepared based on 43 common factors identified through the literature review. The required data were gathered from the representatives involved in handling construction activities in Iran. The collected data were analyzed based on relative importance index (RII), using the SPSS software package.

Findings

The results showed that poor site management, improper planning, fluctuation of prices of materials, lack of experience, and poor economic condition are the critical reasons for cost overrun in Iranian construction projects. The findings also indicated that among the studies conducted in Asian countries, the first three factors have the highest frequency.

Originality/value

This paper highlighted most studies concerning the cost overrun factors in construction projects in different Asian countries in recent years. Up-to-date knowledge helps to understand the complexity of this field in various periods and therefore minimizes the risk of cost overrun. This research can also be used as a benchmark for further studies to clarify similar issues in other developing countries.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 March 2023

Anton Klarin and Qijie Xiao

Many economic, political and socio-cultural events in the 2020s have been strong headwinds for architecture, engineering and construction (AEC). Nevertheless, technological…

Abstract

Purpose

Many economic, political and socio-cultural events in the 2020s have been strong headwinds for architecture, engineering and construction (AEC). Nevertheless, technological advancements (e.g. artificial intelligence (AI), big data and robotics) provide promising avenues for the development of AEC. This study aims to map the state of the literature on automation in AEC and thereby be of value not only to those researching automation and its composition of a variety of distinct technological and system classes within AEC, but also to practitioners and policymakers in shaping the future of AEC.

Design/methodology/approach

This review adopts scientometric methods, which have been effective in the research of large intra and interdisciplinary domains in the past decades. The full dataset consists of 1,871 articles on automation in AEC.

Findings

This overarching scientometric review offers three interdisciplinary streams of research: technological frontiers, project monitoring and applied research in AEC. To support the scientometric analysis, the authors offer a critical integrative review of the literature to proffer a multilevel, multistage framework of automation in AEC, which demonstrates an abundance of technological paradigm discussions and the inherent need for a holistic managerial approach to automation in AEC.

Originality/value

The authors underline employee well-being, business sustainability and social growth outcomes of automation and provide several managerial implications, such as the strategic management approach, ethical management view and human resource management perspective. In doing so, the authors seek to respond to the Sustainable Development Goals proposed by the United Nations as this becomes more prevalent for the industry and all levels of society in general.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Content available
Book part
Publication date: 14 December 2023

Abstract

Details

Digitisation, AI and Algorithms in African Journalism and Media Contexts
Type: Book
ISBN: 978-1-80455-135-6

1 – 10 of 27