Article
Publication date: 13 January 2023

Yongliang Deng, Zedong Liu, Liangliang Song, Guodong Ni and Na Xu

The purpose of this study is to identify the causative factors of metro construction safety accidents, analyze the correlation between accidents and causative factors and assist…

Abstract

Purpose

The purpose of this study is to identify the causative factors of metro construction safety accidents, analyze the correlation between accidents and causative factors and assist in developing safety management strategies for improving safety performance in the context of the Chinese construction industry.

Design/methodology/approach

To achieve these objectives, 13 types and 48 causations were determined based on 274 construction safety accidents in China. Then, 204 cause-and-effect relationships among accidents and causations were identified based on data mining. Next, network theory was employed to develop and analyze the metro construction accident causation network (MCACN).

Findings

The topological characteristics of MCACN were obtained, it is both a small-world network and a scale-free network. Controlling critical causative factors can effectively control the occurrence of metro construction accidents. Degree centrality strategy is better than closeness centrality strategy and betweenness centrality strategy.

Research limitations/implications

In practice, it is very difficult to quantitatively identify and determine the importance of different accidents and causative factors. The weights of nodes and edges are failed to be assigned when constructing MCACN.

Practical implications

This study provides a theoretical basis and feasible management reference for construction enterprises in China to control construction risks and reduce safety accidents. More safety resources should be allocated to control critical risks. It is recommended that safety managers implement degree centrality strategy when making safety-related decisions.

Originality/value

This paper establishes the MCACN model based on data mining and network theory, identifies the properties and clarifies the mechanism of metro construction accidents and causations.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 November 2023

Ruizhen Song, Xin Gao, Haonan Nan, Saixing Zeng and Vivian W.Y. Tam

This research aims to propose a model for the complex decision-making involved in the ecological restoration of mega-infrastructure (e.g. railway engineering). This model is based…

Abstract

Purpose

This research aims to propose a model for the complex decision-making involved in the ecological restoration of mega-infrastructure (e.g. railway engineering). This model is based on multi-source heterogeneous data and will enable stakeholders to solve practical problems in decision-making processes and prevent delayed responses to the demand for ecological restoration.

Design/methodology/approach

Based on the principle of complexity degradation, this research collects and brings together multi-source heterogeneous data, including meteorological station data, remote sensing image data, railway engineering ecological risk text data and ecological restoration text data. Further, this research establishes an ecological restoration plan library to form input feature vectors. Random forest is used for classification decisions. The ecological restoration technologies and restoration plant species suitable for different regions are generated.

Findings

This research can effectively assist managers of mega-infrastructure projects in making ecological restoration decisions. The accuracy of the model reaches 0.83. Based on the natural environment and construction disturbances in different regions, this model can determine suitable types of trees, shrubs and herbs for planting, as well as the corresponding ecological restoration technologies needed.

Practical implications

Managers should pay attention to the multiple types of data generated in different stages of megaproject and identify the internal relationships between these multi-source heterogeneous data, which provides a decision-making basis for complex management decisions. The coupling between ecological restoration technologies and restoration plant species is also an important factor in improving the efficiency of ecological compensation.

Originality/value

Unlike previous studies, which have selected a typical section of a railway for specialized analysis, the complex decision-making model for ecological restoration proposed in this research has wider geographical applicability and can better meet the diverse ecological restoration needs of railway projects that span large regions.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords