1 – 10 of over 3000Eyad Aboseif and Awad S. Hanna
The exact process of construction projects performance assessment and benchmarking still remains subjective relying on qualitative techniques, which does not allow stakeholders to…
Abstract
Purpose
The exact process of construction projects performance assessment and benchmarking still remains subjective relying on qualitative techniques, which does not allow stakeholders to address the issues and the drawbacks of their respective projects as effectively as possible for performance improvement purposes. Hence, this research aims to establish a unified project performance score (PPS) for assessing and comparing projects performance.
Design/methodology/approach
Data were collected from Construction Industry Institute (CII) members and through University of Wisconsin active research projects. Exploratory data analysis was done to investigate the calculated performance metrics and the collected data characteristics. Data were converted into six performance metrics which were used as the independent variables in creating the PPS model. Logistic regression model was developed to generate the unified PPS equation in order to explain the variables that significantly affect construction projects successful post-completion performance. The PPS model was then applied on the collected dataset to benchmark projects in terms of project delivery systems, compensation types and project types in order to showcase the PPS capabilities and possible applications.
Findings
The model revealed that construction cost and schedule growth are the most important metrics in assessing projects performance, while RFIs’ processing time and change orders per million dollars were the features with the least effect on the PPS value. The authors found that integrated project delivery (IPD) and target value (TV) projects outperformed all other project delivery and compensation types. While, industrial projects showed the worst performance, as compared to commercial or institutional projects.
Originality/value
The PPS model can be used to assess the performance of any pool of executed projects, and introducing a novel addition to the field of construction business analytics which is a supplementary tool to successful decision making and performance improvement. Additionally, the bidding selection system can be revolutionized from a cost-based to a performance based one using the PPS model to improve the outcomes of the buyout process.
Details
Keywords
An S-curve is an essential project-management tool. However, it is difficult to adjust S-curve to deal with a force majeure event. The present study develops four valuable…
Abstract
Purpose
An S-curve is an essential project-management tool. However, it is difficult to adjust S-curve to deal with a force majeure event. The present study develops four valuable adjustment approaches, designed to achieve a compromise between the views of the client and contractor. These can be used to control projects after a force majeure event.
Design/methodology/approach
The present study develops four adjustment approaches, which can be used to achieve a compromise between the views of the client and those of the contractor when controlling projects after a force majeure. To determine the S-curves during a force majeure event, two approaches can be selected: BCWS (budgeted cost of scheduled work)-base approach, or BCWP (budgeted cost of work performed)-base approach. To determine the rest of S-curves after a force majeure event, two approaches can be considered: maintaining the original curve of the remaining BCWS, or allocating the original curve of the remaining BCWS. Based on the validation of three empirical cases, drawn from a professional project-management website, this study confirms the feasibility of four proposed empirical approaches and a selection procedure for S-curve adjustment.
Findings
The S-curve-adjustment approaches presented here can be used to deal with cases that are ahead of, on and behind schedule. Using the proposed approaches and selection procedure, contractors can easily revise S-curves and control projects more effectively. To deal with a force majeure event, such as COVID-19, they are strongly advised to adopt the approaches labeled SA-A1 (to adjust the S-curve based on the extension ratio multiplied by the difference in progress during the force majeure) and SA-B1 (to maintain the original curve of the remaining BCWS) for the A/E and E/F curves, respectively.
Research limitations/implications
The proposed approaches can be used in cases of continuous construction during force majeure events. If construction work is totally suspended during such an event, it will be necessary to fine-tune the proposed approaches.
Originality/value
Previous studies have used case-oriented or mathematical-simulation approaches to forecast S-curves. The present study proposes simple approaches that allow the client and contractor to adjust the S-curve easily after a force majeure event. These approaches can be used to adjust work and project-completion targets within an extended duration. Selecting the right S-curve adjustment approach can help to control the remainder of the project, reducing the possibility of delay claims.
Details
Keywords
Anthony Olukayode Yusuf, Adedeji Afolabi, Abiola Akanmu, Homero Murzi, Andres Nieto Leal, Sheryl Ball and Andrea Ofori-Boadu
There is a growing mismatch between the skill demands of the industry and the offerings of academia. One way of reducing this mismatch is by improving collaborations between…
Abstract
Purpose
There is a growing mismatch between the skill demands of the industry and the offerings of academia. One way of reducing this mismatch is by improving collaborations between practitioners and instructors using web-networking platforms. However, it is important to understand practitioners’ considerations while collaborating with instructors. Therefore, this study identified these considerations in order to infer inputs for the design of the graphical user interface (GUI) of a web-based platform for connecting instructors and practitioners.
Design/methodology/approach
A mixed method was adopted through a survey and focus group. A survey was used to capture practitioners’ considerations while collaborating with instructors for student development, and a focus group helped uncover an in-depth understanding of the study phenomena. The data were analyzed using descriptive and inferential statistics and thematic analysis.
Findings
The results show the willingness of practitioners to collaborate with instructors for student development, the ways by which practitioners are willing to meet instructors' course-support needs and their considerations in deciding to do so. Slight differences were observed between the results of the survey and the focus group regarding the ranking of the practitioners’ considerations. The study highlighted demographic differences in practitioners’ considerations when deciding on meeting instructors' course-support needs. The results provide a basis to deduce the GUI inputs of web-networking platforms for connecting instructors and practitioners.
Originality/value
This study revealed practitioners’ design needs and GUI inputs to facilitate the design of web-networking platforms for connecting instructors and practitioners. This study also contributes to user interface design principles, theories on individual differences and practitioners’ involvement in student professional development.
Details
Keywords
Maryam R. Nezami, Mark L.C. de Bruijne, Marcel J.C.M. Hertogh and Hans L.M. Bakker
Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern…
Abstract
Purpose
Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern infrastructures, requiring close collaboration of various infrastructure owners. To effectively manage and improve inter-organizational collaboration (IOC) in infrastructure construction projects, collaboration status should be assessed continually. This study identifies the assessment criteria, forming the foundation of a tool for assessing the status of IOC in interconnected infrastructure projects.
Design/methodology/approach
A systematic literature study and in-depth semi-structured interviews with practitioners in interconnected infrastructure construction projects in the Netherlands are performed to identify the criteria for assessing the status of IOC in infrastructure construction projects, based on which an assessment tool is developed.
Findings
The identified assessment criteria through the literature and the practitioner’s perspectives results in the designing and development of a collaboration assessment tool. The assessment tool consists of 12 criteria and 36 sub-criteria from three different categories of collaborative capacity: individual, relational, and organizational.
Originality/value
The assessment tool enables practitioners to monitor the status of IOC between infrastructure owners and assists them in making informed decisions to enhance collaboration. The assessment tool provides the opportunity to assess and analyze the status of collaboration based on three categories (i.e., individual, relational, and organizational).
Details
Keywords
Kangning Liu, Bon-Gang Hwang, Jianyao Jia, Qingpeng Man and Shoujian Zhang
Informal learning networks are critical to response to calls for practitioners to reskill and upskill in off-site construction projects. With the transition to the coronavirus…
Abstract
Purpose
Informal learning networks are critical to response to calls for practitioners to reskill and upskill in off-site construction projects. With the transition to the coronavirus disease 2019 (COVID-19) pandemic, social media-enabled online knowledge communities play an increasingly important role in acquiring and disseminating off-site construction knowledge. Proximity has been identified as a key factor in facilitating interactive learning, yet which type of proximity is effective in promoting online and offline knowledge exchange remains unclear. This study takes a relational view to explore the proximity-related antecedents of online and offline learning networks in off-site construction projects, while also examining the subtle differences in the networks' structural patterns.
Design/methodology/approach
Five types of proximity (physical, organizational, social, cognitive and personal) between projects members are conceptualized in the theoretical model. Drawing on social foci theory and homophily theory, the research hypotheses are proposed. To test these hypotheses, empirical case studies were conducted on two off-site construction projects during the COVID-19 pandemic. Valid relational data provided by 99 and 145 project members were collected using semi-structured interviews and sociometric questionnaires. Subsequently, multivariate exponential random graph models were developed.
Findings
The results show a discrepancy arise in the structural patterns between online and offline learning networks. Offline learning is found to be more strongly influenced by proximity factors than online learning. Specifically, physical, organizational and social proximity are found to be significant predictors of offline knowledge exchange. Cognitive proximity has a negative relationship with offline knowledge exchange but is positively related to online knowledge exchange. Regarding personal proximity, the study found that the homophily effect of hierarchical status merely emerges in offline learning networks. Online knowledge communities amplify the receiver effect of tenure. Furthermore, there appears to be a complementary relationship between online and offline learning networks.
Originality/value
Proximity offers a novel relational perspective for understanding the formation of knowledge exchange connections. This study enriches the literature on informal learning within project teams by revealing how different types of proximity shape learning networks across different channels in off-site construction projects.
Details
Keywords
Sou-Sen Leu, Kuang-Jen Huang, Cathy Chang-Wei Hung and Pei-Lin Wu
In recent years, cost overrun becomes a common problem in steel building construction projects. The average percentage can vary widely depending on the project type, size…
Abstract
Purpose
In recent years, cost overrun becomes a common problem in steel building construction projects. The average percentage can vary widely depending on the project type, size, complexity and location. The steel structure change ratio in Taiwan is from 1 to 18% in statistics. The contractors always put every possible effort into preventing or mitigating project cost overruns, and one of the approaches is an accurate cost overrun risk estimate. Traditional project cost overrun risk assessment models mainly focus on macro-level evaluation and may not function well for the project-specific level (micro-level). This study creates a network-like connection model between the outcome (i.e. cost overrun risk) and the associated root causes in which the project status evaluation checklists of design, manufacturing, construction and interfaces are used to evaluate the checklists' influences through the Bayesian network (BN) composed by intermediate causes.
Design/methodology/approach
Due to the constraint of data availability, BN nodes, relationships and conditional probabilities are defined to establish a BN-based steel building project cost overrun assessment model following the knowledge of experts. Because of the complexity of the BN, the construction of the BN structure is first to build BN's fault tree (FT) hierarchy. And then, basic BN framework is constructed by the transformation of the FT hierarchy. Furthermore, some worthwhile additional arcs among BN nodes are inserted if necessary. Furthermore, conditional probability tables (CPTs) among BN nodes are explored by experts following the concept of the ranked node. Finally, the BN-based model was validated against the final cost analysis reports of 15 steel building projects done in Taiwan and both were highly consistent. The overall BN-based model construction process consists of three steps: (1) FT construction and BN framework transformation, (2) CPT computation and (3) model validation.
Findings
This study established a network-like bridge model between the outcome (i.e. cost overrun risk) and the root causes in a network of which cost influences are evaluated through the project-specific status evaluation checklists of design, manufacturing, construction and interfaces. This study overcame several limitations of the previous cost overrun risk assessment models: (1) few past research support assessment of cost overrun based on real-time project-owned data and (2) the traditional causal models inadequately depict interdependencies among influence factors of cost overrun at the network. The main influence factors of the cost overrun risk at the steel building projects in Taiwan were also examined using sensitivity analysis. The main root causes of cost overrun in steel building projects are design management and interface integration.
Originality/value
The proposed model belongs to the project-specific causal assessment model using real-time project-owned status checklist data as input. Such a model was seldom surveyed in the past due to the complicated interdependence among causes in the network. For practical use, a convenient and simple regression equation was also developed to forecast the cost overrun risk of the steel building project based on the root causes as input. Based on the analysis of cost overrun risk and significant influence factors, proper tailor-made preventive strategies are established to reduce the occurrence of cost overrun at the project.
Details
Keywords
Charles Frommweiler and Erik Poirier
The building commissioning (BCx) phase is a critical stage in a building's lifecycle. It is also a complex process that involves a large number of actors and activities. While the…
Abstract
Purpose
The building commissioning (BCx) phase is a critical stage in a building's lifecycle. It is also a complex process that involves a large number of actors and activities. While the use of building information modeling (BIM) in the commissioning phase of building equipment and systems could be beneficial, few studies have investigated the processes behind its implementation. The research presented in this paper aims to investigate the implementation of BIM for the commissioning phase within a general contracting company through action-research.
Design/methodology/approach
Through direct involvement with the research partner, a large general contractor, a diagnosis on the current limitations of the commissioning process was conducted. An action plan to implement BIM for commissioning was developed and implemented in two pilot projects. Evaluation was performed through on-site observations and informal discussions with field staff. Learning was specified through the development of a formal protocol for BIM-enabled BCx.
Findings
This action-research project helped the partner organization identify the challenges and a way forward to formalize its BIM-enabled BCx process. The action plan aimed at countering the lack of knowledge about the status of equipment and system commissioning as well as the lack of standardization. The research team co-developed and tested a formal protocol, including BIM-enabled processes and technologies to address these observed problems. A complete implementation ecosystem was structured and deployed. Preliminary feedback indicated that improvements were obtained using a BIM-enabled approach over a traditional approach.
Originality/value
While past studies have investigated the BCx process, this study identified current challenges considering recent advances in BIM and focused on a large general contractor. This work provides an in-depth account of a large general contractor attempting to streamline its BCx process. The results of the study could help guide practitioners in implementing more streamlined BIM-enabled BCx processes.
Details
Keywords
Omid Alijani Mamaghani and Mohammad Zolfaghari
Gas transmission pipelines are at constant risk of gas leakage or fire due to various atmospheric environments, corrosion on pipe metal surfaces and other external factors. This…
Abstract
Purpose
Gas transmission pipelines are at constant risk of gas leakage or fire due to various atmospheric environments, corrosion on pipe metal surfaces and other external factors. This study aims to reduce the human and financial risks associated with gas transmission by regularly monitoring pipeline performance, controlling situations and preventing disasters.
Design/methodology/approach
Facility managers can monitor the status of gas transmission lines in real-time by integrating sensor information into a building information modeling (BIM) 3D model. Using the Monitoring Panel plugin, coded in C# programming language and operated through Navisworks software, the model provides up-to-date information on pipeline safety and performance.
Findings
By collecting project information on the BIM and installing critical sensors, this approach allows facility manager to observe the real-time safety status of gas pipelines. If any risks of gas leakage or accidents are identified by the sensors, the BIM model quickly shows the location of the incident, enabling facility managers to make the best decisions to reduce financial and life risks. This intelligent gas transmission pipeline approach changes traditional risk management and inspection methods, minimizing the risk of explosion and gas leakage in the environment.
Originality/value
This research distinguishes itself from related work by integrating sensor data into a BIM model for real-time monitoring and providing facility managers with up-to-date safety information. By leveraging intelligent gas transmission pipelines, the system enables quick identification and location of potential hazards, reducing financial and human risks associated with gas transmission.
Details
Keywords
Filipe Ferreira, Pedro Briga, Sérgio Ramos Teixeira and Fernando Almeida
This study aims to present an innovative sandbox platform that implements a decision support system (DSS) to assess the sustainable development goals (SDGs) addressed at the…
Abstract
Purpose
This study aims to present an innovative sandbox platform that implements a decision support system (DSS) to assess the sustainable development goals (SDGs) addressed at the municipal level. It intends to determine the relative importance of each SDG in municipalities and explore the synergies that can be discovered among them.
Design/methodology/approach
Participatory action research is used to develop a DSS and an algorithm designated as discrete heavy fuzzy was also developed, which extends the Apriori algorithm to include discrete quantitative assessments of the level of SDG compliance by each project. A scenario consisting of three municipalities in Portugal (i.e. Porto, Loulé and Castelo de Vide) was chosen to demonstrate the implementation of the sandbox platform and to interpret the observed results.
Findings
The results reveal significant differences in the typology of SDGs addressed by each municipality. It was found that municipal sustainable projects are strongly influenced by the contextual factors of each municipality. Porto has projects that address the first five SDGs. Loulé appears projects that promote innovation, the fight against climate change and the development of sustainable cities. Castelo de Vida has initiatives related to innovation and infrastructure and decent work and economic growth.
Research limitations/implications
This study provides knowledge about the relative importance of the SDGs in Portuguese municipalities and explores the synergies among them. The proposed sandbox platform fills the gaps of the ODSlocal Webtool by proposing a dynamic and interactive approach for the exploration of quantitative indicators regarding the implementation status of the SDGs established in the 2030 Agenda.
Originality/value
This study provides knowledge about the relative importance of the SDGs and the various synergies that exist between them considering the Portuguese municipalities. The sandbox platform presented and developed within this study allows filling the gaps of the ODSlocal Webtool that gathers essentially qualitative information about each project and offers a dynamic and interactive exploration with quantitative indicators of the implementation status of the SDGs established in the 2030 Agenda.
Details
Keywords
Wensheng Lin, Guangbin Wang, Yan Ning, Qiuwen Ma and Shuyuan Dai
Megaproject performance measurement (MPM) has received great attention in the project management community, but it primarily focused on the design of performance measures or…
Abstract
Purpose
Megaproject performance measurement (MPM) has received great attention in the project management community, but it primarily focused on the design of performance measures or frameworks. Yet, whether MPM utilization can improve megaproject performance and how project actors use MPM to improve megaproject performance is less well understood. This study aims to investigate whether and how the use of MPM can contribute to better megaproject performance.
Design/methodology/approach
Through the lens of the lever of control, this study conceptualizes MPM utilization as diagnostic use and interactive use. A holistic research model and related hypotheses integrating MPM use, project complexity and megaproject performance were established. The model was validated using a partial square-structural equation modeling method.
Findings
Based on 214-megaproject data collected through a questionnaire survey in China, the results show positive effects of diagnostic use and interactive use on megaproject performance. Both, however, have substitutional interaction effects. The moderating results suggest that the higher project complexity weakens the positive effects of MPM utilization on megaproject performance.
Originality/value
This study advances megaprojects performance measurement and management literature by validating the value of MPM utilization on performance. It also presents practical implications for project managers to improve performance by appropriate MPM utilization.