Article
Publication date: 25 January 2008

Lynda Bourne and Derek H.T. Walker

The aim of this paper is to summarise a successfully completed doctoral thesis. The main purpose of the paper is to provide a summary that indicates the scope of, and main issues…

10326

Abstract

Purpose

The aim of this paper is to summarise a successfully completed doctoral thesis. The main purpose of the paper is to provide a summary that indicates the scope of, and main issues raised by, the thesis so that readers that are undertaking research in this area may be aware of current cutting edge research that could be relevant to them. A second key aim of the paper is to place this in context with doctoral study and further research that could take place to extend knowledge in this area.

Design/methodology/approach

Research reported in this paper was based upon action learning from a series of case studies where a project management tool for managing stakeholder relationships was tested and refined.

Findings

The tool is useful in helping the project delivery team identify major influencing stakeholders and visualise their potential impact. This tool then helped the studied project delivery teams to develop stakeholder engagement strategies. While it was initially tested as a planning tool to be used at the early stages of a project it can be used through the whole implementation phase of a project as the flow of major stakeholders and their influence changes during a project.

Practical implications

The tool was further improved during 2006 and commercialised in 2007 and is currently being used by numerous organisations. In observing how it is being used and can be used, it is suggested that over time a useful data base of stakeholder behaviours is being established that can be mined and used to better predict stakeholder types and their likely actions.

Originality/value

This paper provides a summary of cutting‐edge research work and a link to the published thesis (see URL www.mosaicprojects.com.au/Resources_Papers_021.html for a pdf (7meg)) that researchers can use to help them understand how the research methodology was applied as well as how it can be extended.

Details

International Journal of Managing Projects in Business, vol. 1 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Book part
Publication date: 17 November 2023

Simon Ofori Ametepey, Clinton Ohis Aigbavboa and Wellington Didibhuku Thwala

The pursuit of sustainable development goals (SDGs) is the primary driver of road infrastructure development (RID), but multiple parties are involved in the process, causing…

Abstract

The pursuit of sustainable development goals (SDGs) is the primary driver of road infrastructure development (RID), but multiple parties are involved in the process, causing confusion. To effectively manage stakeholder processes, Jeffry (2009) proposed a framework based on a preventative double-path relationship between stakeholders and institutions. Bal et al. (2013) proposed a five-stage framework for stakeholder management, which includes identifying key players and issues, conducting analysis and plans, tightening restraints on making promises, creating a plan and soliciting input from interested parties, and monitoring its effectiveness. Successful stakeholder management for sustainable road infrastructure project (SRIP) implementation has been shown to have several benefits, such as enhanced understanding of the fiscal position, improving status, building relationships, developing trust, and enduring collaborative relationships, distributing skills and practices, and recognizing and mitigating threats and vulnerabilities. Infrastructure projects involving roads include a range of complex activities, and it is essential for infrastructure projects to evaluate potential project partners prior to making a final decision. Dealing with many stakeholders and maintaining a reasonable degree of concordance between their interests is crucial for fruitful endeavours. It is important for project groups and partners to have a shared understanding of the project’s goals and solicit their input and for a precise approach to identify and manage project partners throughout the execution phase. However, RID is still in its infancy when it comes to managing stakeholders and relationships. Stakeholder management has been ad hoc due to a lack of standardized methodologies, approaches, strategies, and processes, and infrastructure development procedures should include a systematic approach to managing stakeholders. The bulk of SRIP implementation needs come from stakeholders, making project partners crucial. The sustainable development (SD) strategy emphasizes the importance of SRIP execution to stakeholders, such as architects, quantity surveyors, conservationists, environmentalists, regional managers, project managers, suppliers, subcontractors, and sustainability consultants. This section of the research addressed the omissions of previously analysed comprehensive factors in SID models and frameworks, including climate change response, public involvement, and stakeholder management. Strategies for filling these gaps were discussed. An analysis of relevant academic literature was conducted.

Details

Sustainable Road Infrastructure Project Implementation in Developing Countries: An Integrated Model
Type: Book
ISBN: 978-1-83753-811-9

Keywords

Article
Publication date: 19 September 2024

Diana Ominde, Edward Godfrey Ochieng and Tarila Zuofa

The purpose of this study is to examine the influence of stakeholder integration and project complexity on information technology (IT) projects in Kenya. The following research…

Abstract

Purpose

The purpose of this study is to examine the influence of stakeholder integration and project complexity on information technology (IT) projects in Kenya. The following research question guided our inquiry: what is the influence of project complexity and stakeholder integration on the performance of IT projects in Kenya?

Design/methodology/approach

To advance the current understanding of the effect of stakeholder integration and project complexity on IT projects, multiple regressions were used to predict how project complexity and stakeholder integration influence project performance. Both government-funded and privately funded IT projects from a developing country were examined.

Findings

The study found that any project’s complexity and stakeholder integration levels offer a distinctive contribution to its success. Theoretically, the study contributes to linkages between stakeholder integration and project complexity concerning IT project performance. Through the adoption of actionable research and theoretical elaboration, we have shown that the successful execution of IT projects is driven by the successful integration of stakeholders and monitoring the level of complexity at each phase of the project.

Originality/value

The findings of this study add to the burgeoning literature on the performance of IT projects and come with several managerial implications as well. It brings to the fore the concept of stakeholder integration as an essential element of project success. The findings suggest that the inclusion of stakeholder integration into corporate decisions, strategies and policies can be an asset to the production of sustainable competitive advantages needed during the implementation of IT projects in government entities and organisations. As shown in this study, all the above require a collaborative platform allowing for data sharing among diverse stakeholders to ameliorate distrust or lack of information.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 10 May 2024

Qianqian Ju, Yan Wang, Hui Liu, Xiaoyun Du and Yifei Li

Stakeholders in complex capital projects are characterized by complicated interactions, adversarial short-term relationships and cooperative demand for deliverables. Unhealthy…

Abstract

Purpose

Stakeholders in complex capital projects are characterized by complicated interactions, adversarial short-term relationships and cooperative demand for deliverables. Unhealthy interfaces between stakeholders often lead to significant interface conflicts, which gradually become apparent in the construction stage. However, stakeholder interface health (SIH) has not been well understood and measured in the construction industry by either scholars or practitioners. It is essential to identify unhealthy interface relationships between stakeholders by comprehensively assessing SIH for enhancing project performance.

Design/methodology/approach

The study provided a comprehensive framework to assess SIH. The assessment was based on Wuli-Shili-Renli theory. Moreover, the CRITIC and Grey-TOPSIS methodologies were applied to precisely evaluate the SIH level. Besides, graph-based interface networks were developed to visualize SIH. At last, the framework was applied to a mass rapid transit project in China to test the validity of the study.

Findings

The result showed that stakeholder interfaces with strict contract constraints are healthier. On the other hand, IM behaviors make up for the soft coordination mechanism without contract constraints to a certain extent. The results of the case study were consistent with the actual project practices. The proposed framework provided a useful IM tool for assessing and visualizing SIH.

Research limitations/implications

The limitation of this study is that only the mass rapid transit project was selected for empirical analysis to validate the effectiveness of the proposed framework. It is recommended that the proposed framework be applied to other types of complex capital projects to further discussions in IM.

Practical implications

Theoretically, this study introduces a comprehensive framework to measure the health of stakeholder interfaces in complex capital projects, which helps to provide a theoretical basis and methodological support for stakeholder interface management.

Social implications

Practically, applying SIH assessment to existing interface management procedures can help the project manager identify interface conflicts between stakeholders in time and eventually contribute to the improvement of PM performance. At the same time, the interface management team tracks the responsibilities of unhealthy interface stakeholders and requires them to take measures to improve the SIH level. Stakeholder interfaces with lower health scores should be given more attention. The proposed framework can serve as a novel IM approach to identify weaknesses in IM and take targeted management measures to alleviate unhealthy stakeholder interface relationships.

Originality/value

The study provides an innovative method for scientifically and accurately assessing SIH. This research can help scholars and practitioners in the project management field facilitate the diagnosis of unhealthy interface relationships and provide decision support for the project management theoretical foundation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 26 January 2022

Guido Grunwald, Jürgen Schwill and Anne-Marie Sassenberg

Partnerships for sustainability involve the cooperation of several direct and indirect stakeholders. Direct stakeholders are project partners who can include sponsoring brands…

Abstract

Partnerships for sustainability involve the cooperation of several direct and indirect stakeholders. Direct stakeholders are project partners who can include sponsoring brands, manufacturers or retailers; and sponsored sports clubs or social institutions, and indirect stakeholders relate to potential customers, the general public and government agencies. The knowledge and competencies of direct and indirect stakeholders are integrated to ensure common project-based sustainability and individual goals. This integration is essentially facilitated by image transfer and self-identification effects, which strengthen stakeholder commitment and trust, and ultimately contributing to a higher relationship quality. However, sustainability partnerships experience several challenges. The challenges lie in selecting suitable partners; formulating partner requirements; determining partner contributions; evaluating and controlling partner integration and, further, enhancing cooperation and relationship quality among selected partners. To attend to these challenges requires a holistic and systematic process for stakeholder integration in sustainability projects. In this chapter, a process model for stakeholder integration for sustainability projects is developed based on the relevant theoretical and empirical research on relationship and sustainability marketing. In particular, the possibilities of digital integration are taken into account in the process. The model can be used to manage co-creation partnerships for sustainability including the selection, evaluation and controlling of stakeholder relationships to derive strategies and measures to improve relationship quality.

Book part
Publication date: 24 September 2018

Harri Ruoslahti

Co-creation of knowledge offers significant opportunities for innovation. This chapter seeks to gain understanding of the process of co-creation of knowledge for innovation and…

Abstract

Co-creation of knowledge offers significant opportunities for innovation. This chapter seeks to gain understanding of the process of co-creation of knowledge for innovation and public relations in multi-stakeholder projects by exploring current insights in academic literature. The research questions look at how co-creation of knowledge for innovation has been investigated in the scholarly literature; the roles of end-users; and the modes and challenges of end-user participation and in collaboration relating to communication.

The method of this chapter is a structured literature review, following a series of rigorous steps: a search of databases, analysis of 33 articles found, summarising relevant content using a data extraction table and a data extraction continuum as analysis tools to show the range of projects discussed in the literature to create a comprehensive overview.

The findings indicate that multi-stakeholder networks can be structured for different aims. In the articles found different types of projects were investigated. Four categories of projects were found: (1) co-creation projects benefiting one company; (2) co-creation projects benefiting business-to-business value chain networks; (3) co-creation projects benefiting public entities; and (4) co-creation projects benefiting innovation network stakeholders.

Complexity is highest for multiple stakeholder co-creation projects benefiting innovation network stakeholders, where the roles between stakeholders are fluid and changing constantly. Solving common issues motivates the stakeholders to collaborate and build trust. Open innovation environments may facilitate communication and interaction.

Co-creation of knowledge requires intensive collaboration. Knowing the main challenges to address will help the functioning of co-creation collaboration networks and their public relations.

Details

Public Relations and the Power of Creativity
Type: Book
ISBN: 978-1-78769-291-6

Keywords

Open Access
Article
Publication date: 6 July 2023

Caroline Ingvarsson, Anette Hallin and Christof Kier

The purpose of this paper is to explore how gamification may be used for project stakeholder engagement.

2355

Abstract

Purpose

The purpose of this paper is to explore how gamification may be used for project stakeholder engagement.

Design/methodology/approach

The paper presents the results of a systematic literature review of extant research concerning the gamification of projects. Based on this, an agenda for future studies is outlined.

Findings

Extant research on the gamification of projects is scarce and scattered among various disciplines, but the engineering fields dominate. The research performed does indicate that gamification may be used for involving stakeholders in projects, primarily by promoting learning, but also by engaging them, motivating action and solving problems.

Research limitations/implications

In several cases, extant research display poor quality in research design and a lack in cross-disciplinary perspectives, which means that more research is needed. The users’ perspective is often lacking. Furthermore, the ideas gamification might be “hidden” within other technologies.

Practical implications

The findings of this research may assist project management practitioners in the endeavor of adopting gamification principles to better involve stakeholders.

Originality/value

The study fills a gap in summarizing the research on how gamification may be used to promote project stakeholder engagement. Based on this, it proposes a research agenda for future research on the use of gamification to promote project stakeholder engagement.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 4 April 2023

Andrew Ebekozien, Clinton Ohis Aigbavboa and Mantoa Ramotshela

Stakeholder engagement in construction projects is an ingredient that contributes to project optimal performance. Many developing countries have a paucity of literature about…

7542

Abstract

Purpose

Stakeholder engagement in construction projects is an ingredient that contributes to project optimal performance. Many developing countries have a paucity of literature about stakeholders' engagement in construction projects. Therefore, the study investigated South Africa's shareholders' engagement in construction projects and recommended possible measures to mitigate potential limitations.

Design/methodology/approach

The researchers collated data from South African experts in stakeholder engagement via a phenomenology type of qualitative research design. They explored the “perceived hindrances” facing stakeholders' engagement in construction projects and proffer measures to mitigate them. The study analysed collected data via thematic analysis and achieved saturation. Three themes emerged from the analysed data.

Findings

Findings show that efficient stakeholder engagement will enhance team collaboration and integrated construction project delivery. Results identified the perceived limitations facing stakeholders' engagement in South Africa's construction projects and categorised them into individual perceived hindrances, organisational perceived hindrances and government-related perceived hindrances. Also, findings proffer measures to mitigate perceived hindrances via policies and programmes within the sector.

Practical implications

Besides enhancing policymakers and other stakeholders in South Africa's construction industry to understand the benefits of stakeholder engagement better, the study may stir up the construction sector's stakeholders to embrace enhanced and effective stakeholders' management.

Originality/value

This study contributes to construction project practice that involves stakeholders, as it reveals the underlying causes of perceived hindrances facing stakeholders' engagement in construction projects. Also, it proffers feasible solutions to mitigate these hindrances and enhance stakeholders' engagement within South Africa's construction projects.

Details

Benchmarking: An International Journal, vol. 31 no. 3
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 16 October 2017

Cancan Wang and Rony Medaglia

As social media technologies permeate public life, the current forms of collaboration between government and non-government stakeholders are changing. The purpose of this paper is…

Abstract

Purpose

As social media technologies permeate public life, the current forms of collaboration between government and non-government stakeholders are changing. The purpose of this paper is to investigate how social media use reconfigures the organizing practices around such collaboration. A case study of a collaborative e-government project showcases how emergent organizing practices through external social media differ from existing ones along the dimensions of time, task, team and transition.

Design/methodology/approach

This paper presents a case study of a collaborative e-government project on open data, organized by Shanghai Municipality, local businesses, universities and non-governmental organizations, using an external social media platform, WeChat. Adopting the theoretical lens of temporary organization, the paper identifies the key aspects of change emerged in the organizing practices of this collaboration.

Findings

The findings outline how the use of external social media reconfigures the collaboration between government and non-government stakeholders along the four dimensions of time, task, team and transition. The new form of collaboration is reconfigured along the lines of (1) an ad hoc and non-linear management of time; (2) discursive task creation, assignment and engagement among stakeholders; (3) a serendipitous engagement of team members based on expertise; and (4) a shift in formal and informal organizing practices.

Originality/value

This paper provides insights on the use of external social media for collaboration in e-government research and develops the concept of temporary organization in a sociomaterial setting. It also provides practical suggestions on how to manage new forms of public projects leveraging on the capacity of external social media.

Details

Transforming Government: People, Process and Policy, vol. 11 no. 4
Type: Research Article
ISSN: 1750-6166

Keywords

Article
Publication date: 8 December 2020

Seyed Ashkan Zarghami and Jantanee Dumrak

The methods presently used for project stakeholder analysis have typically followed two distinct patterns: (1) a project-centric approach that places a project at the center, and…

1734

Abstract

Purpose

The methods presently used for project stakeholder analysis have typically followed two distinct patterns: (1) a project-centric approach that places a project at the center, and subsequently, concentrates on dyadic relationships between the project and its stakeholders; (2) a network theory-based approach that emphasizes on the interconnections within the network of project stakeholders. The main contention of this study is built upon the premise that neither the sole analysis of dyadic relationships between a project and its stakeholders nor the stand-alone use of the network theory methods is adequate for reliable analysis of stakeholders.

Design/methodology/approach

This article proposes a model that bases the salience of stakeholders on their relationships with the project as well as on their interdependencies in the project. In doing so, this work explores the potential of a Fuzzy Inference System (FIS) to provide a comprehensive picture of stakeholder analysis. Using a real-world biodiversity project, this paper analyses the project stakeholders based on their possession of various attributes as well as the extent to which each individual stakeholder influences the entire connected network of all stakeholders.

Findings

A salient feature of the proposed FIS model is its ability to provide a high capacity for analyzing the results. The model is able to generate the input–output relationship surface view for stakeholder analysis. Further, unlike the traditional project stakeholder analysis methods that are linear, the proposed model is strongly nonlinear. This implies that change in the input variables of the fuzzy-based model is not expected to lead to a proportional change in the model output.

Practical implications

Two practical implications can be drawn from the presented stakeholder analysis model. First, confronted with mounting pressure to understand the stakeholder environment and to effectively manage stakeholders, project managers need to establish a sound stakeholder management strategy. The stakeholder analysis model developed herein casts a wider net for the critical ranking of stakeholders in a project, thereby providing a more accurate prioritization of the stakeholders. Second, while stakeholders independently require managerial attention, understanding the effect of competing and cooperative stakeholder interactions are unarguably of great importance. The presented model prompts the project managers to recognize not only the influence of key stakeholders on the project but also the interactions of multiple stakeholders within the stakeholder network.

Originality/value

The proposed stakeholder analysis model possesses several desirable features. First, it is not constrained to capturing only stakeholder attributes discussed in the example project provided in this study. The model is flexible and adaptable to all business and management contexts. Second, the stakeholder mapping in the model is not a function of a sole attribute but rather a cumulative effect of multiple stakeholder attributes. In fact, the power of the suggested model lies in its ability to incorporate the three aspects of stakeholder theory into a single model. Third, the presented model builds a quantitative and qualitative picture of the stakeholder salience. The suggested FIS model is capable of processing both qualitative perception of stakeholder attributes and quantitative analysis of the network of stakeholder interactions. This allows for a more comprehensive and synergistic utilization of model inputs.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords