Article
Publication date: 2 March 2022

Hilary Omatule Onubi, Ahmad Sanusi Hassan, Nor'Aini Yusof and Ali Ahmed Salem Bahdad

The COVID-19 health crisis has brought about a set of extra health and safety regulations, and procedures to the construction industry which could influence projects' economic…

Abstract

Purpose

The COVID-19 health crisis has brought about a set of extra health and safety regulations, and procedures to the construction industry which could influence projects' economic performance (EP). The aim of this paper is to examine the effect of adopting COVID-19 safety protocols on construction sites on the economic performance (EP) of construction projects.

Design/methodology/approach

Employing the survey method using a structured questionnaire, data were collected from small- and large-sized construction projects in Nigeria and analysed using partial least squares structural equation modelling (PLS-SEM) technique.

Findings

The findings reveal that job re-organization and sanitization have negative significant effects on EP, while social distancing and specific training have no effect on EP. Furthermore, project size moderates the relationship between job re-organization, sanitization, specific training and EP with the stronger effect on the relationships observed in big projects, except for the relationship between sanitization and EP where the moderating relationship is stronger in small projects. However, there is no significant moderating effect of project size on the relationship between social distancing and EP.

Practical implications

As construction project sites continue to operate amidst strict safety protocols, this study offers theoretical and practical insights on how construction projects can adhere to the safety protocols while performing economically.

Originality/value

The originality of this study's findings stems from the fact that it is among the first to provide greater insight on how construction projects have fared economically considering the impact of the various COVID-19 protocols.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 June 2022

Bee Lan Oo, Benson Teck-Heng Lim and Goran Runeson

With the aim to provide a global view of factors affecting mark-up size on construction projects, this study performs a meta-analytical review of the relevant studies over the…

Abstract

Purpose

With the aim to provide a global view of factors affecting mark-up size on construction projects, this study performs a meta-analytical review of the relevant studies over the past 20 years.

Design/methodology/approach

The analytical process involved the identification and evaluation of the importance of critical factors affecting mark-up size on construction projects, and the assessment of the generalisability of findings of the meta-analysis. A random-effects model was adopted in the statistical meta-analysis.

Findings

The results show that there are 23 critical factors, and the top five factors are: (1) competitiveness of other bidders; (2) number of bidders; (3) relationship and past experience with client; (4) experience on similar project; and (5) project size. A heterogeneity test further shows that there is no statistically significant heterogeneity across the studies, reinforcing the generalisability of the findings to a global context.

Research limitations/implications

The list of critical factors from a global perspective should form a good basis for future efforts in bidding model development.

Practical implications

The research findings have practical implications to both construction clients and contractors in formulating their contracting practices and strategies.

Originality/value

This is the first meta-analysis of a sizeable collection of replicated studies on factors affecting mark-up size on construction projects in the literature.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 August 2022

Yixi Zhang, Bee Lan Oo and Benson Teck-Heng Lim

Contractors of different scales, operating in different construction industries of varying institutional and economic settings, have different considerations when making bid or…

Abstract

Purpose

Contractors of different scales, operating in different construction industries of varying institutional and economic settings, have different considerations when making bid or no-bid and mark-up decisions. Focusing on the large and medium-sized contractors in the Jilin province, China, the purpose of this study is to examine important factors affecting their decision to bid (d2b) and mark-up decisions and investigate differences between large and medium-sized contractors in evaluating the importance of the various factors affecting their d2b and mark-up decisions.

Design/methodology/approach

This study used a survey design for timely data collection from a large population. Contractors’ bidding attitudes was collected using an online survey questionnaire with a list of 40 key factors. Statistical analytical methods were applied for comparing the two groups of contractors.

Findings

The results of this study indicate that factors related to client conditions are most critical for both large and medium-sized contractors in their d2b and mark-up decisions. The results also show statistically significant differences between the two groups of contractors on a subset of factors affecting their d2b and mark-up decisions. The large contractors have placed more emphasis on projects' potential financial and strategic benefits. Another notable finding is that both groups of contractors have placed great emphasise on “government legislations” in their d2b and mark-up decisions.

Research limitations/implications

These findings should be interpreted in consideration of several limitations. Firstly, the sample size is relatively small, and the focus was on a single province in the China construction industry. Next, this study only explores differences between large and medium-sized contractors in evaluating the importance of the various factors affecting their d2b and mark-up decisions.

Practical implications

Contractors could refer list of critical factors in competing for jobs in Jilin province or other provinces of similar institutional and economic settings. Construction clients, on the other hand, should consider the list of critical factors in the formulation of their competitive tendering procedures, thus enhancing the efficiency in their procurement of construction services.

Originality/value

Research on contractors’ bidding decision-making in the context of Chinese construction industry remains scarce; the research findings have implications for the industry stakeholders.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 March 2022

Muhammad Ayat, Azmat Ullah and Changwook Kang

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects…

Abstract

Purpose

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects in developing countries.

Design/methodology/approach

The main data set for this study was collected from the World Bank database consisting of 8,951 PPI projects that occurred in developing countries from 1996 to 2020. Hierarchical logistic regression was applied for investigating the effects of USPs on project success. Three moderators, namely, control of corruption, presence of local sponsor and project size were also included in the model to test the impact of their interactions with the USP on the performance of PPI projects. Further, to assess the impact of the effect of USPs, the average marginal effect was calculated. The framework used in this study consists of 18 control variables, three moderators and one noncontrolled independent variable (the USP).

Findings

The results of hierarchical logistic regression indicate that USPs have a significant and negative effect on the success of PPI projects occurring in developing countries. The negative effect of a USP weakens with the presence of local sponsors and stronger control of corruption in the host country. However, contrary to the authors’ expectations, the results show that project size does not significantly affect the association between USPs and the success of PPI projects. Moreover, the results of average marginal effects show that the negative impact of USP on the success of PPI projects ranges between 2.4% and 3.8%.

Originality/value

This study quantifies the negative impact of USP on the success of PPI projects in developing countries, which will be helpful for the practitioners to understand the associated risk with USP projects. Furthermore, it also identifies the moderating roles of control of corruption and the presence of local sponsors on the relationship between USP and the success of PPI projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 29 March 2022

Murat Cevikbas and Zeynep Işık

This study aims to detect the most appropriate delay analysis method in mega airport projects.

Abstract

Purpose

This study aims to detect the most appropriate delay analysis method in mega airport projects.

Design/methodology/approach

First, the criteria affecting the selection of delay analysis methods were detected through an in-depth literature review and an expert panel, which was conducted with 12 experts who have experience in delay analysis domain in mega airport projects. Later, fuzzy VIKOR (VIsekriterijumska optimizacija i KOmpromisno Resenje) approach was conducted by considering the detected selection criteria and the most common delay analysis methods.

Findings

Windows Analysis method was detected as the best option for mega airport projects. It was followed by Time Impact Analysis (TIA), collapsed as-built analysis, as-planned vs as-built method and impacted as-planned method, respectively.

Originality/value

Each project has its own characteristics and thus requires specific management techniques; therefore, selecting a delay analysis method without considering the project types and size may cause conflicts between the contracting parties. On the one hand, numerous fruitful studies concerning delay analysis methods have been conducted in the literature, but on the other hand, none of them has considered project characteristics in terms of project size and type while selecting the most appropriate delay analysis method. Moreover, the larger the size of a project is, the more vulnerable it is to encounter with delays. Mega airport construction projects are complex in their nature in that they are large size and involve multi-disciplinary processes; thus, they need special attention in the process of resolving delays. This study intended to fill this gap in the literature by focusing on selection of the most appropriate delay analysis method for mega airport projects, and it is clear that considering the project type and size in the selection of delay analysis methods will provide more reliable outcomes.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 July 2023

Nyamagere Gladys Sospeter

The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost…

Abstract

Purpose

The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost. Accordingly, it is expected that these design documents must be of high quality to engender the attainment of the desired project objectives. The purpose of this study is to analyze the factors that affect the quality of design documentation in construction projects in the context of a developing country.

Design/methodology/approach

This study used a descriptive research design involving professionals from firms offering services in areas of design and documentation, mainly architectural, quantity surveying and engineering. A total of 80 out of 84 questionnaires were received and analyzed using IBM SPSS Statistics Version 25, and a factor analysis approach was used to categorize the factors into smaller five groups.

Findings

The factors were subsequently categorized according to size, time, staff, quality and training-related factors. Collectively, large size of the project, inadequate supervision of junior design staff, low professional fees, procurement process and system, failure to adopt quality management systems and allocation or assigning of staff to more than one project at the same time have high influence (component loading of 700) in respective groups.

Research limitations/implications

The reliance on data to analyze the factors of design documents in construction projects in developing economies context, using a Tanzanian exemplar, is considered a limitation. Developing countries with similar economic characteristics, procurement systems and cultural setup could benefit from the results of this study.

Practical implications

The study of factors affecting quality of design and documents in construction projects serves as a guide for built environment firms in Tanzania in conducting effective business and ensuring quality design documents, hence improved project performance. Understanding the nature of relationship between the design and construction teams as well as the impact of design documents on project performance is of great importance for the design teams of future projects and other decision-makers to pay attention when preparing design and related documents, especially during design stage of construction projects in developing countries.

Originality/value

The study contributes the knowledge by providing useful insights on the subject through a categorization of the factors affecting the quality of design documentation and exploring the nature of relationship between the design and construction teams in construction projects within a previously unexplored Tanzanian context focusing on a traditional procurement system for future improvement of project delivery, hence project success.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 6 September 2022

Carlos A. Meisel, Jose D. Meisel, Helga Bermeo-Andrade, Laura Carranza and Helmut Zsifkovits

The aim of this study is to increase the understanding of collaborative relationships and assess according to the project size, the influence of the contributory factors in…

Abstract

Purpose

The aim of this study is to increase the understanding of collaborative relationships and assess according to the project size, the influence of the contributory factors in shaping collaboration network structure in projects developed in global supply chains (GSC).

Design/methodology/approach

The paper used a case study methodology applied to eight global projects developed by an Austrian company leader in global market intra-logistics solutions and warehouse automation. The cases were studied by two approaches in network analysis. First, visual and descriptive analysis to describe structural aspects of the network. Second, stochastic network analysis to evaluate the influence of contributory factors in the structure of the collaboration network.

Findings

The results evidence that independently of the project size and project manager influence, project team roles (PTR) who have a reciprocal communication among other PTR tend to have a higher collaboration intensity (CI). Additionally, the results highlight the influence of the project manager in shaping the collaboration network in standard projects (STP) and small projects (SMP). According to the project size, the results show that the PTR that form complete triangles or cluster or who communicate frequently among each other tend to have a high CI, being more evident these tendencies in large-scale projects than STP and SMP.

Originality/value

This research provides a framework to identify the key actors and contributory factors in shaping collaborative relationships in GSC. The findings could be used to support the decision-making process and formulation strategies for effective collaborative relationship management in GSC.

Details

Kybernetes, vol. 52 no. 9
Type: Research Article
ISSN: 0368-492X

Keywords

Open Access
Article
Publication date: 12 December 2023

Jayesh Prakash Gupta, Hongxiu Li, Hannu Kärkkäinen and Raghava Rao Mukkamala

In this study, the authors sought to investigate how the implicit social ties of both project owners and potential backers are associated with crowdfunding project success.

Abstract

Purpose

In this study, the authors sought to investigate how the implicit social ties of both project owners and potential backers are associated with crowdfunding project success.

Design/methodology/approach

Drawing on social ties theory and factors that affect crowdfunding success, in this research, the authors developed a model to study how project owners' and potential backers' implicit social ties are associated with crowdfunding projects' degrees of success. The proposed model was empirically tested with crowdfunding data collected from Kickstarter and social media data collected from Twitter. The authors performed the test using an ordinary least squares (OLS) regression model with fixed effects.

Findings

The authors found that project owners' implicit social ties (specifically, their social media activities, degree centrality and betweenness centrality) are significantly and positively associated with crowdfunding projects' degrees of success. Meanwhile, potential project backers' implicit social ties (their social media activities and degree centrality) are negatively associated with crowdfunding projects' degrees of success. The authors also found that project size moderates the effects of project owners' social media activities on projects' degrees of success.

Originality/value

This work contributes to the literature on crowdfunding by investigating how the implicit social ties of both potential backers and project owners on social media are associated with crowdfunding project success. This study extends the previous research on social ties' roles in explaining crowdfunding project success by including implicit social ties, while the literature explored only explicit social ties.

Details

Internet Research, vol. 34 no. 7
Type: Research Article
ISSN: 1066-2243

Keywords

Article
Publication date: 22 August 2023

Farzana Asad Mir and Davar Rezania

This study aims to understand how project leaders' interactive use of the project management control systems (MCS) impact IT project performance, by examining the mechanisms…

Abstract

Purpose

This study aims to understand how project leaders' interactive use of the project management control systems (MCS) impact IT project performance, by examining the mechanisms through which this relationship is enacted.

Design/methodology/approach

Data were collected from a cross-sectional survey of 109 IT project managers working in Canadian and USA-based organizations. A moderated mediation model was analysed by hierarchical component reflective-formative measurement modelling using PLS-SEM.

Findings

Results suggest that the leader's interactive use of project MCS is associated with IT project performance, and this relationship is partially mediated by team learning behaviour. In addition, the relationship between the interactive use of project MCS and team learning behaviour is moderated by the organization's emphasis on process accountability, with the effect being stronger under the conditions of higher emphasis on process accountability.

Originality/value

This study contributes to the literature on the use of controls in the IT project-based business environments by explaining how the project leader's style of use of controls influences project team learning behaviour that in turn impacts project performance. Additionally, this study extends the project governance and accountability literature by identifying and empirically examining how the perceptions of project leader's institutionalized organizational accountability arrangements moderate the impact of the interactive use of control systems on team learning behaviour. A methodological contribution of the study is the scale development to measure leader's perceptions about the organization's emphasis on process accountability.

Details

Leadership & Organization Development Journal, vol. 44 no. 6
Type: Research Article
ISSN: 0143-7739

Keywords

Article
Publication date: 23 January 2023

Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…

466

Abstract

Purpose

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.

Design/methodology/approach

Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.

Findings

The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.

Research limitations/implications

Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.

Originality/value

Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords