Search results

1 – 10 of over 2000
Article
Publication date: 3 November 2021

Richard Ohene Asiedu, Patrick Manu, Abdul-Majeed Mahamadu, Colin Anthony Booth, Paul Olomolaiye, Kofi Agyekum and Mohamed Abadi

Effective procurement of infrastructure is partly dependent on infrastructure procurement personnel having the skills that are important for the discharge of their role…

Abstract

Purpose

Effective procurement of infrastructure is partly dependent on infrastructure procurement personnel having the skills that are important for the discharge of their role. Addressing the infrastructure deficits in developing countries, therefore, calls for an understanding of the skills that are important for the discharge of the roles of public personnel that are involved in infrastructure procurement. This study aims to investigate these skills from the perspective of public infrastructure procurement personnel in the sub-Saharan African region.

Design/methodology/approach

A questionnaire survey of procurement personnel yielded 590 useable responses, which were analysed using t-tests and exploratory factor analysis (EFA).

Findings

EFA established eight key components of important infrastructure procurement skills to include skills related to: project success factors; social and environmental sustainability; marketing and e-procurement; project phase management, the application of procurement laws and procedures; soft skills, ICT and communication; and data analysis and team building.

Originality/value

The findings are crucial in developing infrastructure procurement capacity building programmes that would be appropriate for infrastructure procurement personnel in developing country contexts. Infrastructure procurement personnel ought to engage more in capacity development training that is aligned to enhancing skills within the eight components.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 27 October 2023

Muhammad Saiful Islam, Madhav Nepal and Martin Skitmore

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural…

Abstract

Purpose

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural relationships among each other. The purpose of this study is, therefore, to establish the complex structural relationships of risks involved.

Design/methodology/approach

In total, 76 published articles from the previous literature are reviewed using the content analysis method. Three risk networks in different phases of power plant projects are depicted based on literature review and case studies. The possible methods of solving these risk networks are also discussed.

Findings

The study finds critical cost overrun risks and develops risk networks for the procurement, civil and mechanical works of power plant projects. It identifies potential models to assess cost overrun risks based on the developed risk networks. The literature review also revealed some research gaps in the cost overrun risk management of power plants and similar infrastructure projects.

Practical implications

This study will assist project risk managers to understand the potential risks and their relationships to prevent and mitigate cost overruns for future power plant projects. It will also facilitate decision-makers developing a risk management framework and controlling projects’ cost overruns.

Originality/value

The study presents conceptual risk networks in different phases of power plant projects for comprehending the root causes of cost overruns. A comparative discussion of the relevant models available in the literature is presented, where their potential applications, limitations and further improvement areas are discussed to solve the developed risk networks for modeling cost overrun risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 2 April 2024

Rick Forster, Andrew Lyons, Nigel Caldwell, Jennifer Davies and Hossein Sharifi

The study sets out to demonstrate how a lifecycle perspective on complex, public-sector procurement projects can be used for making qualitative assessments of procurement policy…

Abstract

Purpose

The study sets out to demonstrate how a lifecycle perspective on complex, public-sector procurement projects can be used for making qualitative assessments of procurement policy and practice and reveal those procurement capabilities that are most impactful for operating effectively.

Design/methodology/approach

Agency theory, institutional theory and the lifecycle analysis technique are combined to abductively develop a framework to identify, analyse and compare complex procurement policies and practices in public sector organisations. Defence is the focal case and is compared with cases in the Nuclear, Local Government and Health sectors.

Findings

The study provides a framework for undertaking a lifecycle analysis to understand the challenges and capabilities of complex, public-sector buyers. Eighteen hierarchically-arranged themes are identified and used in conjunction with agency theory and institutional theory to explain complex procurement policy and practice variation in some of the UK’s highest-profile public buyers. The study findings provide a classification of complex buyers and offer valuable guidance for practitioners and researchers navigating complex procurement contexts.

Originality/value

The lifecycle approach proposed is a new research tool providing a bespoke application of theory by considering each lifecycle phase as an individual but related element that is governed by unique institutional pressures and principal-agent relationships.

Details

International Journal of Operations & Production Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 20 October 2023

Usman Musa, Mastura Jaafar and Faraziera Mohd Raslim

This study attempts to examine the factors that influence user intention to adopt e-procurement in the Nigerian public sector.

1571

Abstract

Purpose

This study attempts to examine the factors that influence user intention to adopt e-procurement in the Nigerian public sector.

Design/methodology/approach

A well-structured questionnaire was used to collect primary data from 278 procurement and information technology (IT) departments’ officials of key federal government ministries and agencies. The technology acceptance model (TAM) model was adopted and extended with security-related factors, namely perceived trust and perceived security. A partial least squares-structural equation modelling (PLS-SEM) approach was used to test and validate the model.

Findings

The results indicated that perceived usefulness is the best predictor of users’ intention to adopt e-procurement, followed by perceived security and perceived trust. In contrast, however, perceived ease of use was found to have a significant negative effect on the intention to adopt e-procurement.

Originality/value

This study is among the first in the Nigerian public sector context to evaluate users’ perceptions on e-procurement adoption with the use of a distinctive research model (TAM). The study's findings contribute to a better understanding of the factors influencing the adoption of e-procurement in the Nigerian public sector.

Details

Arab Gulf Journal of Scientific Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1985-9899

Keywords

Article
Publication date: 22 March 2024

Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…

Abstract

Purpose

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.

Design/methodology/approach

Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.

Findings

Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.

Originality/value

The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 15 May 2023

Asmamaw Tadege Shiferaw, Paulos A. Wondimu and Tor Kristian Stevik

This study aims to explore the experiences of using competitive dialogue (CD) as a procurement procedure and the freedom it provides to the contracting parties in Norway.

Abstract

Purpose

This study aims to explore the experiences of using competitive dialogue (CD) as a procurement procedure and the freedom it provides to the contracting parties in Norway.

Design/methodology/approach

This study opted for qualitative research design. Data were collected from four case projects through document reviews and in-depth interviews with procurement experts and key contract partners of the projects.

Findings

Results indicate that CD has some room for maneuver that is worth trying. Furthermore, the research identified several measures that can be implemented to use the procedure effectively. Contracting parties that have used the procedure have had various positive experiences.

Social implications

The findings have implications in improving project outputs, building better trust and cooperation between the contracting parties and better use of public money on projects that have lasting outcomes for the society.

Originality/value

The authors studied four actual projects that used CD as a procurement procedure and aimed to provide first-hand information on the degree of freedom that it offered to the contracting parties.

Details

Journal of Public Procurement, vol. 23 no. 2
Type: Research Article
ISSN: 1535-0118

Keywords

Open Access
Article
Publication date: 19 April 2024

Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…

Abstract

Purpose

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.

Design/methodology/approach

The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.

Findings

The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.

Practical implications

The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.

Originality/value

This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.

Details

LBS Journal of Management & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-8031

Keywords

Open Access
Article
Publication date: 4 August 2023

Christopher Amoah

In addressing the housing deficits for the less privileged citizens, the South African government began constructing social housing after coming to power in 1994. However, the…

Abstract

Purpose

In addressing the housing deficits for the less privileged citizens, the South African government began constructing social housing after coming to power in 1994. However, the construction of these houses is bedevilled with many issues; prominent among them are poor quality of the constructed houses. This study seeks to develop a quality management framework for achieving quality and efficiency in public-sector housing construction, a hallmark of the country's procurement goals.

Design/methodology/approach

Telephone interviews were conducted with construction professionals involved in constructing government social houses across South Africa, chosen randomly. The data gathered were analysed using the content analysis method.

Findings

The study found that the most significant cause of poor quality government-constructed social housing is multifaceted, categorised into project management-related, procurement-related, contractor-related, corruption-related and political-related.

Practical implications

Failure to develop and implement a quality management framework on government-constructed social housing leads to poor quality social housing.

Originality/value

The study has identified quality-related issues and has developed a Quality Management (QM) framework for the stakeholders involved in the construction of the houses to guide them in the project implementation process to ensure project success and quality standards.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Book part
Publication date: 19 March 2024

John Thomas Flynn and Lloyd Levine

A quick search of the headlines of major newspapers reveals a treasure trove of technology procurement gone wrong. While the private sector seems to adopt and implement new…

Abstract

A quick search of the headlines of major newspapers reveals a treasure trove of technology procurement gone wrong. While the private sector seems to adopt and implement new technology seamlessly and quickly to deliver for customers, the government struggles to accomplish technology purchases and integrations with the same ease. As governments in the United States are looking to retain their current workforce and attract the next generation of workers, the technological capabilities and ethos of governments will be paramount. With nearly every industry being transformed by technology and Generation T being the first generation to have an ingrained “technology first” mindset, the ability of governments to attract these workers depends, in large part, on the ability to transform their government technology culture, policies, and practices.

In this chapter, the authors examine the administrative branch and observe two key components at the root of most technology failures: poor organizational structure in the bureaucracy and the lack of an empowered Chief Information/Technology Officer. Building upon case studies from Massachusetts and California, this chapter looks at the factors related to failure or success to understand the technology procurement culture. The chapter concludes by presenting four key “best practice” principles of public policy and administration that can be implemented by almost any governmental entity to improve their acquisition and implementation of technology.

Details

Technology vs. Government: The Irresistible Force Meets the Immovable Object
Type: Book
ISBN: 978-1-83867-951-4

Keywords

Article
Publication date: 16 August 2022

Shumank Deep, Thayaparan Gajendran and Marcus Jefferies

The purpose of this study is to identify the antecedents of “power” and “dependence” attributes in the context of a construction project and to explore the impact of the…

Abstract

Purpose

The purpose of this study is to identify the antecedents of “power” and “dependence” attributes in the context of a construction project and to explore the impact of the antecedents on risk transfer and collaboration to develop a conceptual framework for decision-making.

Design/methodology/approach

A systematic review was performed using various databases to identify the antecedents and their measures. This review followed the established preferred reporting items for systematic reviews and meta-analyses protocols and 246 articles were identified. The articles were qualitatively analysed based on keyword co-occurrence approach using VOSviewer software.

Findings

The findings of this systematic review established latent constructs, that is, “clarity of procurement decisions”, “market structure” and “market competition” as antecedents of power and two antecedents of dependence, namely, “reputation” and “commercial importance”. And a framework was conceptualized to determine the contractual approach and the procurement design should be planned to take in account the scenarios and the course of action to enhance collaboration and control risk transfer.

Originality/value

To the best of the authors’ knowledge, this study is the first of its kind to identify the “antecedents” of the attributes of “power” and dependence and framework was conceptualized to determine the contractual approach.

1 – 10 of over 2000