Search results

1 – 10 of over 5000
Article
Publication date: 1 April 2024

Zoubeir Lafhaj, Slim Rebai, Olfa Hamdi, Rateb Jabbar, Hamdi Ayech and Pascal Yim

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of…

Abstract

Purpose

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of construction project monitoring and management. This research aims to enhance efficiency, transparency and trust within the dynamic and collaborative environment of the construction industry by leveraging the decentralized, secure and immutable nature of blockchain technology.

Design/methodology/approach

This paper employs a comprehensive approach encompassing the formulation of the COPULA model, the development of a digital solution using the ethereum blockchain and extensive testing to assess performance in terms of execution cost, time, integrity, immutability and security. A case analysis is conducted to demonstrate the practical application and benefits of blockchain technology in real-world construction project monitoring scenarios.

Findings

The findings reveal that the COPULA framework effectively addresses critical issues such as centralization, privacy and security vulnerabilities in construction project management. It facilitates seamless data exchange among stakeholders, ensuring real-time transparency and the creation of a tamper-proof communication channel. The framework demonstrates the potential to significantly enhance project efficiency and foster trust among all parties involved.

Research limitations/implications

While the study provides promising insights into the application of blockchain technology in construction project monitoring, future research could explore the integration of COPULA with existing project management methodologies to broaden its applicability and impact. Further investigations into the solution’s scalability and adaptation to various construction project types and sizes are also suggested.

Originality/value

This research offers a comprehensive blockchain solution specifically tailored for the construction industry. Unlike prior studies focusing on theoretical aspects, this paper presents a practical, end-to-end solution encompassing model formulation, digital implementation, proof-of-concept testing and validation analysis. The COPULA framework marks a significant advancement in the digital transformation of construction project monitoring, providing a novel approach to overcoming longstanding industry challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 23 August 2024

Behzad Abbasnejad, Sahar Soltani, Amirhossein Karamoozian and Ning Gu

This systematic literature review aims to investigate the application and integration of Industry 4.0 (I4.0) technologies in transportation infrastructure construction projects…

Abstract

Purpose

This systematic literature review aims to investigate the application and integration of Industry 4.0 (I4.0) technologies in transportation infrastructure construction projects focusing on sustainability pillars.

Design/methodology/approach

The study employs a systematic literature review approach, combining qualitative review and quantitative analysis of 142 academic articles published between 2011 and March 2023.

Findings

The findings reveal the dominance of Building Information Modelling (BIM) as a central tool for sustainability assessment, while other technologies such as blockchain and autonomous robotics have received limited attention. The adoption of I4.0 technologies, including Internet of Things (IoT) sensors, Augmented Reality (AR), and Big Data, has been prevalent for data-driven analyses, while Unmanned Aerial Vehicle (UAVs) and 3D printing are mainly being integrated either with BIM or in synergy with Artificial Intelligence (AI). We pinpoint critical challenges including high adoption costs, technical barriers, lack of interoperability, and the absence of standardized sustainability benchmarks.

Originality/value

This research distinguishes itself by not only mapping the current integration of I4.0 technologies but also by advocating for standardization and a synergistic human-technology collaborative approach. It offers tailored strategic pathways for diverse types of transportation infrastructure and different project phases, aiming to significantly enhance operational efficiency and sustainability. The study sets a new agenda for leveraging cutting-edge technologies to meet ambitious future sustainability and efficiency goals, making a compelling case for rethinking how these technologies are applied in the construction sector.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 5 October 2022

H.P.M.N.L.B. Moragane, B.A.K.S. Perera, Asha Dulanjalie Palihakkara and Biyanka Ekanayake

Construction progress monitoring (CPM) is considered a difficult and tedious task in construction projects, which focuses on identifying discrepancies between the as-built product…

Abstract

Purpose

Construction progress monitoring (CPM) is considered a difficult and tedious task in construction projects, which focuses on identifying discrepancies between the as-built product and the as-planned design. Computer vision (CV) technology is applied to automate the CPM process. However, the synergy between the CV and CPM in literature and industry practice is lacking. This study aims to fulfil this research gap.

Design/methodology/approach

A Delphi qualitative approach was used in this study by conducting two interview rounds. The collected data was analysed using manual content analysis.

Findings

This study identified seven stages of CPM; data acquisition, information retrieval, verification, progress estimation and comparison, visualisation of the results and schedule updating. Factors such as higher accuracy in data, less labourious process, efficiency and near real-time access are some of the significant enablers in instigating CV for CPM. Major challenges identified were occlusions and lighting issues in the site images and lack of support from the management. The challenges can be easily overcome by implementing suitable strategies such as familiarisation of the workforce with CV technology and application of CV research for the construction industry to grow with the technology in line with other industries.

Originality/value

This study addresses the gap pertaining to the synergy between the CV in CPM literature and the industry practice. This research contributes by enabling the construction personnel to identify the shortcomings and the opportunities to apply automated technologies concerning each stage in the progress monitoring process.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 14 November 2022

Abdul Hannan Qureshi, Wesam Salah Alaloul, Wong Kai Wing, Syed Saad, Khalid Mhmoud Alzubi and Muhammad Ali Musarat

Rebar is the prime component of reinforced concrete structures, and rebar monitoring is a time-consuming and technical job. With the emergence of the fourth industrial revolution…

Abstract

Purpose

Rebar is the prime component of reinforced concrete structures, and rebar monitoring is a time-consuming and technical job. With the emergence of the fourth industrial revolution, the construction industry practices have evolved toward digitalization. Still, hesitation remains among stakeholders toward the adoption of advanced technologies and one of the significant reasons is the unavailability of knowledge frameworks and implementation guidelines. This study aims to investigate technical factors impacting automated monitoring of rebar for the understanding, confidence gain and effective implementation by construction industry stakeholders.

Design/methodology/approach

A structured study pipeline has been adopted, which includes a systematic literature collection, semistructured interviews, pilot survey, questionnaire survey and statistical analyses via merging two techniques, i.e. structural equation modeling and relative importance index.

Findings

The achieved model highlights “digital images” and “scanning” as two main categories being adopted for automated rebar monitoring. Moreover, “external influence”, “data-capturing”, “image quality”, and “environment” have been identified as the main factors under “digital images”. On the other hand, “object distance”, “rebar shape”, “occlusion” and “rebar spacing” have been highlighted as the main contributing factors under “scanning”.

Originality/value

The study provides a base guideline for the construction industry stakeholders to gain confidence in automated monitoring of rebar via vision-based technologies and effective implementation of the progress-monitoring processes. This study, via structured data collection, performed qualitative and quantitative analyses to investigate technical factors for effective rebar monitoring via vision-based technologies in the form of a mathematical model.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 6 February 2024

Moslem Sheikhkhoshkar, Hind Bril El Haouzi, Alexis Aubry and Farook Hamzeh

In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control…

Abstract

Purpose

In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control metrics have been devised and put into practice, often with little emphasis on analyzing their underlying concepts. To cover this gap, this research aims to identify and analyze a holistic list of control metrics and their functionalities in the construction industry.

Design/methodology/approach

A multi-step analytical approach was conducted to achieve the study’s objectives. First, a holistic list of control metrics and their functionalities in the construction industry was identified. Second, a quantitative analysis based on social network analysis (SNA) was implemented to discover the most important functionalities.

Findings

The results revealed that the most important control metrics' functionalities (CMF) could differ depending on the type of metrics (lagging and leading) and levels of control. However, in general, the most significant functionalities include managing project progress and performance, evaluating the look-ahead level’s performance, measuring the reliability and stability of workflow, measuring the make-ready process, constraint management and measuring the quality of construction flow.

Originality/value

This research will assist the project team in getting a comprehensive sensemaking of planning and control systems and their functionalities to plan and control different dynamic aspects of the project.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 2 March 2023

B.H.V.H. Jayamaha, B.A.K.S. Perera, K.D.M. Gimhani and M.N.N. Rodrigo

Enterprise resource planning (ERP) systems that are equipped with numerous features and functionalities help to improve the profitability of construction corporations around the…

Abstract

Purpose

Enterprise resource planning (ERP) systems that are equipped with numerous features and functionalities help to improve the profitability of construction corporations around the world through enhancing the efficiency of the functions related to cost management. Thus, the purpose of this study was to investigate the applicability of ERP systems for cost management of building construction projects in Sri Lanka.

Design/methodology/approach

A qualitative technique was used in this study, which comprised two-round Delphi-based semistructured interviews. Purposive sampling was used to determine the interviewees. Content analysis was used to evaluate the collected data.

Findings

The findings of this study identified the ERP system as a strategic tool for gaining a competitive advantage for an organization while confirming 14 uses of ERP systems and 16 stages of the cost management process. Eighteen issues were finalized at the end of the interview rounds while categorizing the suitable ERP applications at each stage of the cost management process.

Originality/value

Even though there are numerous distinct studies conducted on cost management and ERP systems, there has been a lack of studies conducted on the synergy between these two areas that can be adapted for the building projects in the Sri Lankan context. Therefore, the findings of this study can bring a new paradigm to the Sri Lankan construction sector by influencing the adaption of correct ERP systems at numerous project stages by providing a competitive edge.

Details

Construction Innovation , vol. 24 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 22 August 2024

Kwasi Agyeman-Boakye, Ernest Kissi and Ivy Abu

The aim of this study is to investigate the influence of Project Management Office (PMO) functions on project performance in businesses in Lower Middle-Income Countries (LMIC…

Abstract

Purpose

The aim of this study is to investigate the influence of Project Management Office (PMO) functions on project performance in businesses in Lower Middle-Income Countries (LMIC) using Partial Least Square–Structural Equation Modelling (PLS–SEM).

Design/methodology/approach

Utilizing close-ended questionnaires in a cross-sectional survey, 256 project professionals from 10 business sectors in Ghana views were elicited. The questions were developed through a comprehensive literature review and involved 27 PMO functional measures grouped into 6 and 19 project performance measures grouped into 6. Data collected was then analysed using the PLS–SEM to validate the hypothetical relationship.

Findings

The PLS–SEM model supported 13 (t > 1.65) out of 36 hypotheses investigating the relationship between PMO functions and project performance. Variations in the PMO functions moderately (R2 = 0.34) explained the performance of projects. The aggregate activities of the PMO had the highest significant influence on environmental performance (R2 = 0.467). The topmost PMO function was identified as monitoring and controlling project performance, and it was significantly associated with cost (ß = 0.265, p < 0.05), quality (ß = 0.291, p < 0.05) and project scope (ß = 0.265 p < 0.05) performance.

Research limitations/implications

This research has brought more illumination to the functions of PMOs and its influence on project performance. The results suggest that PMO activities, when tailored to the business context, can significantly change project performance variables.

Originality/value

Most research on PMO and project performance has been limited to developed countries or a single sector. This study uniquely expands the business sectors and focuses on LMICs.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 6 October 2023

Hawa Ahmad, Suhaiza Ismail and Zamzulaila Zakaria

Drawing on institutional work (Lawrence and Suddaby, 2006; Lawrence et al., 2011), this study aims to explore how the concept of value for money (VFM) is understood in terms of…

Abstract

Purpose

Drawing on institutional work (Lawrence and Suddaby, 2006; Lawrence et al., 2011), this study aims to explore how the concept of value for money (VFM) is understood in terms of the private finance initiative (PFI) implementation in Malaysia.

Design/methodology/approach

In-depth interviews with 25 actors involved in the implementation of PFI projects at two public universities in Malaysia were conducted. The interviews focused on the ways in which participants in the projects make sense of VFM in their ongoing involvement with the projects. In addition, a review of publicly available documents was conducted to understand the ways in which the notion of VFM is reflected in the policies and procedures of the government. Data from the interviews and documents were analysed using thematic analysis.

Findings

It is found that the advocacy work of macro-level actors, as well as micro-level actors, has promoted PFI implementation to achieve VFM. However, to the micro-level actors, VFM is just a concept that carries different interpretations, depending on how PFI fits their everyday functional discourses. In addition, direct negotiation and lack of commercial appreciation are disruptive not only to the achievement of VFM but also to the public sector reform agenda of the country.

Originality/value

The present study contributes to the discourses on the concept of VFM that is assumed to be inherent in PFI. The findings are based on micro- and macro-level actors and cover both advocacy and disruption of VFM achievement.

Details

Journal of Accounting & Organizational Change, vol. 20 no. 3
Type: Research Article
ISSN: 1832-5912

Keywords

Article
Publication date: 29 May 2024

Rajeev Rathi, Mahipal Singh, Jiju Antony, Jose Arturo Garza-Reyes, Rekha Goyat and Alireza Shokri

This study aims to explore the potential application of blockchain technology in Lean Six Sigma (LSS) project through a proposed blockchain-LSS (BLSS) model. The proposed model…

Abstract

Purpose

This study aims to explore the potential application of blockchain technology in Lean Six Sigma (LSS) project through a proposed blockchain-LSS (BLSS) model. The proposed model can tackle real-time problems in information sharing, transparency and traceability in every stage of the LSS project.

Design/methodology/approach

The scoping review approach is used to develop the integrated model of the BLSS approach for operational excellence. The proposed model is validated through expert’s input, which is collected by a questionnaire survey method.

Findings

The prime function of the proposed BLSS model is the information sharing among the project team and real-time monitoring, transparency, traceability and immutability in the Define-Measure-Analyze-Improve-Control phase. The proposed model also consists the information about the role of blockchain features at each phase of the LSS project. The project team and industry employees can trace the success of the project at every moment, resulting in trust buildup and the elimination of fake data. Moreover, there would be no disputes among various sections/shops of the plant and employees to share the real information.

Practical implications

This paper provides guidelines to practitioners and managers for integrating the LSS approach and blockchain. The blockchain helps managers and practitioners in better data traceability and transparency, monitoring of data as well as more sustainable LSS project management.

Originality/value

To the best of the authors’ knowledge, this is the first research attempt that developed an integrated model of blockchain and LSS approach to maintaining the immutable records of assets in projects and targeted Industry 4.0.

Details

International Journal of Lean Six Sigma, vol. 15 no. 5
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 26 March 2024

Xichen Chen, Alice Yan Chang-Richards, Florence Yean Yng Ling, Tak Wing Yiu, Antony Pelosi and Nan Yang

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This…

Abstract

Purpose

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This paper aims to discover DT deployment patterns and emerging trends in real-life AEC projects.

Design/methodology/approach

A case study methodology was adopted, including individual case analyses and comparative multiple-case analyses.

Findings

The results revealed the temporal distribution of DT in practical AEC projects, specific DT products/software, major project types integrated with digital solutions, DT application areas and project stages and associated project performance. Three distinct patterns in DT adoption have been observed, reflecting the evolution of DT applications, the progression from single to multiple DT integration and alignment with emerging industry requirements. The DT adoption behavior in the studied cases has been examined using the technology-organization-environment-human (TOE + H) framework. Further, eight emerging trend streams for future DT adoption were identified, with “leveraging the diverse features of certain mature DT” being a shared recognition of all studied companies.

Practical implications

This research offers actionable insights for AEC companies, facilitating the development of customized DT implementation roadmaps aligned with organizational needs. Policymakers, industry associations and DT suppliers may leverage these findings for informed decision-making, collaborative educational initiatives and product/service customization.

Originality/value

This research provides empirical evidence of applicable products/software, application areas and project performance. The examination of the TOE + H framework offers a holistic understanding of the collective influences on DT adoption. The identification of emerging trends addresses the evolving demands of the AEC industry in the digital era.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 5000