Search results

1 – 10 of over 1000
Article
Publication date: 23 January 2023

Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…

495

Abstract

Purpose

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.

Design/methodology/approach

Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.

Findings

The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.

Research limitations/implications

Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.

Originality/value

Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Abstract

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Article
Publication date: 16 April 2024

Lee Yen Chaw, Chun Meng Tang and Muhammad Ali

As the competition to retain current and attract new mobile payment app users intensifies, meeting users’ needs has become fundamental for mobile payment app service providers to…

Abstract

Purpose

As the competition to retain current and attract new mobile payment app users intensifies, meeting users’ needs has become fundamental for mobile payment app service providers to stay competitive. This study aims to investigate the relationship between users’ needs, users’ attitude towards mobile payment apps and users’ continuance intention to use mobile payment apps.

Design/methodology/approach

Following an exploratory sequential mixed methods research design, this study first conducted three focus groups in the qualitative phase to investigate issues or concerns faced by current users of mobile payment apps. The study then conducted an online questionnaire survey in the quantitative phase to collect responses from users of mobile payment apps. Partial least squares structural equation modelling was used to analyse 110 valid responses.

Findings

Findings show that usefulness (modelled as a second-order reflective construct consisting of three first-order reflective constructs, i.e. ease of use, acceptability and responsiveness), traceability and security had a statistically significant relationship with attitude towards mobile payment apps (which in turn had a statistically significant relationship with continuance intention to use mobile payment apps). It was also found that attitude towards mobile payment mediated the relationships between usefulness, traceability and security; and continuance intention to use mobile payment apps.

Practical implications

The findings of this study can help mobile payment app service providers and developers design apps that offer the functions and features that their users need.

Originality/value

Although some recent studies have investigated the adoption of mobile payments in the Malaysian context, few of these studies examined current users’ continuance intention to use mobile payment apps.

Details

Journal of Systems and Information Technology, vol. 26 no. 2
Type: Research Article
ISSN: 1328-7265

Keywords

Article
Publication date: 8 February 2024

Kian Yeik Koay and KerSoon Ang

This study aims to examine the factors influencing consumers’ intentions to use QR code menus in the post-COVID-19 pandemic using the unified theory of acceptance and use of…

Abstract

Purpose

This study aims to examine the factors influencing consumers’ intentions to use QR code menus in the post-COVID-19 pandemic using the unified theory of acceptance and use of technology and rational choice theory as the theoretical foundations.

Design/methodology/approach

Using a survey method, 200 data are collected from consumers who had used QR code menus in the past. Partial least squares structural equation modelling is used to analyse the data.

Findings

Our findings show that performance expectancy, effort expectancy, social influence, habit and perceived privacy protection have a significant positive influence on intentions. However, facilitating conditions, hedonic motivation and perceived privacy risk do not have a significant influence on intentions.

Originality/value

This study further extends the work of previous studies by using the unified theory of acceptance and use of technology model, with additional two new predictors, namely perceived privacy protection and perceived privacy risk, to understand consumers’ intentions to use QR code menus.

Details

British Food Journal, vol. 126 no. 5
Type: Research Article
ISSN: 0007-070X

Keywords

Article
Publication date: 23 December 2021

Nathaniel Ayinde Olatunde

Advocates of structured stakeholder management (SM) processes have emphasized the use of the appropriate strategies as the most important process in SM. Yet, research effort in…

Abstract

Purpose

Advocates of structured stakeholder management (SM) processes have emphasized the use of the appropriate strategies as the most important process in SM. Yet, research effort in this regard in developing countries has been inadequate. The purpose of the study was to examine the SM strategies used on building projects procured by private corporate organisations in south-western Nigeria to enhance project performance.

Design/methodology/approach

The study used a census survey to select 30 projects managers who indicated (from 106 who responded to a first stage questionnaire) that they have participated in structured SM in the study area between 2008 and 2017. A second-stage questionnaire was designed to elicit information from the respondents. Data analysis was done with the use of frequency, percentile and mean score (MS) and analysis of variance (ANOVA).

Findings

Stakeholders with high power and high interest were managed with the use of “collaborate/partner” strategy (MS = 3.86), stakeholders with high power and low interest were “kept satisfied” (MS = 4.09), stakeholders with low power and high interest were managed by using “keep them informed regularly” strategy (MS = 4.10) and stakeholders with low power and low interest were managed using “monitor and respond when necessary” strategy (M = 3.94). Further results show that static stakeholders with high power were managed by using the “monitor constantly” strategy (MS = 4.11), stakeholders with high power, high legitimacy and high urgency were managed by adopting the “keep satisfied” strategy (MS = 4.26), to manage non-supportive stakeholders, project managers adopted the “keep satisfied” strategy (MS = 4.18) and supportive stakeholders were managed by using “involved” strategy (MS = 4.02). More results showed that there is no significant difference in the opinion of project managers on SM strategies employed irrespective of procurement method.

Practical implications

The study provided a guide to project managers on the appropriate SM strategies to use for future projects.

Originality/value

The study was an attempt to appraise the SM strategies in relation to the procurement methods and their relationship with project performance.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 3
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 31 May 2022

Kari-Pekka Tampio and Harri Haapasalo

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…

1116

Abstract

Purpose

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.

Design/methodology/approach

Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.

Findings

All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.

Practical implications

Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.

Originality/value

This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 March 2024

Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An and Xueying Bao

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects…

Abstract

Purpose

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.

Design/methodology/approach

This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.

Findings

The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.

Originality/value

The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 16 May 2024

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

The sustainability of the construction industry is associated with the productivity, profitability and competitiveness of the firms, which are significantly affected by…

Abstract

Purpose

The sustainability of the construction industry is associated with the productivity, profitability and competitiveness of the firms, which are significantly affected by inefficient site supervision and labour management approaches. This study aims to use a case study with mixed methods to evaluate the site supervisory characteristics in labour management, labour performance assessment and labour productivity measurement towards developing meaningful guidelines in polishing construction supervision attributes.

Design/methodology/approach

Well-developed modern apprenticeship elements were applied to 62 construction supervisors who were selected using the snowball sampling method, and their relevant competency characteristics were assessed using a comprehensively developed grading mechanism connected with useful training manuals/tools. Academic reviews, experts’ consultations and other meticulous mixed approaches were applied at different stages of the research plan’s sequential layout.

Findings

The mean performance scores of supervisors indicate proficient-level grades in the competency characteristics related to applying efficient labour management procedures and developing-level grades in designing productivity measurement tools, performing assessments on efficiency and productivity and proposing enhancement practices on efficiency and productivity for site operations. The findings point to a modern generalised guideline that establishes the ranges of supervisory attributes within the scope of the study. The validity, reliability, adaptability and generalisability of the findings were assured by using pertinent statistical tests and professional assessments.

Research limitations/implications

Though the study’s conclusions/findings are primarily applicable to the construction environment of a developing country comparable to the Sri Lankan context, they will considerably impact current/future industrial practices in various other countries and emerging industries.

Originality/value

The research has produced a conceptualised modern tool that guides determining the capacity levels of supervisory attributes for carrying out labour management, labour performance assessment and labour productivity measurement aspects in construction. The research has opened a pump that inflows new values of highly workable supervision features for strengthening the site management structures and filling the industry’s knowledge vacuum in the methodical execution of apprenticeships.

Details

Journal of Responsible Production and Consumption, vol. 1 no. 1
Type: Research Article
ISSN: 2977-0114

Keywords

Open Access
Article
Publication date: 25 March 2024

Roope Nyqvist, Antti Peltokorpi and Olli Seppänen

The objective of this research is to investigate the capabilities of the ChatGPT GPT-4 model, a form of artificial intelligence (AI), in comparison to human experts in the context…

1835

Abstract

Purpose

The objective of this research is to investigate the capabilities of the ChatGPT GPT-4 model, a form of artificial intelligence (AI), in comparison to human experts in the context of construction project risk management.

Design/methodology/approach

Employing a mixed-methods approach, the study draws a qualitative and quantitative comparison between 16 human risk management experts from Finnish construction companies and the ChatGPT AI model utilizing anonymous peer reviews. It focuses primarily on the areas of risk identification, analysis, and control.

Findings

ChatGPT has demonstrated a superior ability to generate comprehensive risk management plans, with its quantitative scores significantly surpassing the human average. Nonetheless, the AI model's strategies are found to lack practicality and specificity, areas where human expertise excels.

Originality/value

This study marks a significant advancement in construction project risk management research by conducting a pioneering blind-review study that assesses the capabilities of the advanced AI model, GPT-4, against those of human experts. Emphasizing the evolution from earlier GPT models, this research not only underscores the innovative application of ChatGPT-4 but also the critical role of anonymized peer evaluations in enhancing the objectivity of findings. It illuminates the synergistic potential of AI and human expertise, advocating for a collaborative model where AI serves as an augmentative tool, thereby optimizing human performance in identifying and managing risks.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 November 2023

Matti Haverila, Kai Christian Haverila and Caitlin McLaughlin

This paper aims to examine project management segments based on customer satisfaction drivers and loyalty rather than traditional demographic or behavioural variables.

Abstract

Purpose

This paper aims to examine project management segments based on customer satisfaction drivers and loyalty rather than traditional demographic or behavioural variables.

Design/methodology/approach

Data were gathered over 18 consecutive months, and 3,129 surveys were completed using a questionnaire. The statistical methods included partial least squares (PLS) structural equation modelling, finite mixture segmentation, prediction-oriented segmentation (PLS-POS) and multi-group analysis (PLS-MGA).

Findings

The findings indicate the existence of three segments among system delivery project customers based on the differences in the strengths of the path coefficients in the customer-centric structural model. In Segment 1, satisfaction based on the proposal was crucial for loyalty, with the value-for-money construct negatively impacting the repurchase intent construct. Segment 2 had a solid value-for-money orientation. In Segment 3, the critical path indicated that satisfaction drove repurchase intention, with satisfaction based mainly on the installation.

Originality/value

The research contributes to the segmentation theory by introducing a new way to segment the systems delivery projects customers based on the perceived strength of the relationships in a customer-centric structural model, which aligns with traditional segmentation theory in a way that most segmentation analyses do not. A new segmentation approach to the domain of project management theory is presented. Based on the results, treating the system delivery project customer base as a single homogenous group can lead to managerially misleading conclusions.

Details

Journal of Business & Industrial Marketing, vol. 39 no. 5
Type: Research Article
ISSN: 0885-8624

Keywords

Access

Year

Last month (1247)

Content type

Article (1247)
1 – 10 of over 1000