Article
Publication date: 16 August 2024

Dickson Osei-Asibey, Joshua Ayarkwa, Benjamin Baah, Aba Essanowa Afful, Gloria Anokye and Prince Asher Nkrumah

Many investors have less interest in tendering for public-private partnership (PPP) construction projects as a result of the uncertain risks associated with the project delivery…

Abstract

Purpose

Many investors have less interest in tendering for public-private partnership (PPP) construction projects as a result of the uncertain risks associated with the project delivery. Moreover, PPP project stakeholders have inadequate information about the probable impacts of time-based delay imposed on PPP projects under the PPP arrangement. This study aims to identify and categorize construction stakeholders’ perceptions of the impact of time-based delays on PPP construction projects.

Design/methodology/approach

A purposive sampling technique was adopted where questionnaires were used as the primary instrument for gathering data from PPP experts. Cronbach’s alpha coefficient and Kendall’s concordance were used to measure the reliability of the scale and the respondent’s level of agreement, respectively. One sample t-test, mean score ranking and principal component analysis were used to analyse the identified time-based delay impacts.

Findings

The study revealed seven significant impacts of time-based delay on PPP construction project delivery as: “project schedule overrun”, “idling of project resources”, “project cost overrun”, “poor quality of completed works”, “delayed realization of project benefits”, “frequent arbitration/litigation in PPP projects” and “total abandonment of PPP projects”. The study further identified the top five significant impacts of time-based delay on PPP project stakeholders as: “reduction in motivation to attract investment”, “high interest on finance (loans)”, “contractor in financial crisis”, “loss of public confidence in government” and “reduction in parties’ reputation”.

Practical implications

The identified significant impacts of time-based delays will increase stakeholders’ awareness of the repercussions and effects that time-based delays may impose on PPP construction projects if not appropriately managed throughout the project implementation. This awareness will further guide stakeholders to implement targeted risk management strategies to minimize the negative consequences of delays on PPP project performance.

Originality/value

As a pioneering study that provides a better understanding of the impacts of time-based delays on PPP construction projects, this study enhances knowledge of PPP construction project implementation.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 2 July 2024

Mahesh Babu Purushothaman, Leo Neil Resurreccion San Pedro and Ali GhaffarianHoseini

This review paper aims to highlight the causes of delays (COD) and their interactions in construction projects, potentially aiding in timely completion and waste reduction through…

Abstract

Purpose

This review paper aims to highlight the causes of delays (COD) and their interactions in construction projects, potentially aiding in timely completion and waste reduction through early anticipation.

Design/methodology/approach

Forty-seven global literature were examined in detail to identify CODS and its interactions using the systematic literature review (SLR) method that utilised the PRISMA guidelines to ensure the studies reviewed were adequate to safeguard the robustness and comprehensiveness. Three-way analysis, such as Pareto, degree of centrality and loops, was undertaken to identify the critical Level 1,2 and 3 CODS that affect the Construction projects.

Findings

The research findings demonstrate that 65 CODs in eight categories affect construction projects. The CODs act in coherence rather than silos; the CLD displays complex interconnections of 44 factors obtained through the pairwise comparison of the 47 identified literature of the SLR. Through its systematic analysis of interaction loops, this research identified Ten level 1 critical CODs, two second-level critical CODs and 4 Third-level critical CODs. “Contractors' excessive workload/beyond potential/inadequate experience” emerged as the top COD that affects scheduling and project delay.

Research limitations/implications

The study limitations include using only English articles and a restricted number of databases. However, the chosen databases were reputable and underwent thorough peer review processes. This study may have limitations due to the SLR, which means that factors affecting COD and interactions may vary by country, and future research is suggested for validation.

Practical implications

This study identified interactions of construction delays that potentially support scheduling risk management during the early stage of the project and reduce waste to improve sustainability. The theoretical implications of SLR-based research include helping develop a framework that would potentially have all COD in the current scenario and aid future academic and industrial research factor-wise and country-wise in aiding sustainability. This will support and provide construction professionals and academia with knowledge of the COD related to factors and their interactions to be considered in the early assessment and management of future projects and improve sustainability.

Originality/value

Most literature studies the factors or causes of construction delays that affect construction projects. The CODs primarily do not operate in silos but combine with other causes to enhance their influence on delays. Hence, it is of utmost importance to study the interactions of COD to enhance the knowledge in the construction field that would aid in schedule repair and, in turn, on-time project delivery. The study is the first related to COD and their interactions in construction projects in the digital era.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 2 January 2024

Dillip Kumar Das

The delay in real estate projects in India is pervasive. Organization and management (O&M) and project management (PM)-related challenges are argued to contribute to project…

Abstract

Purpose

The delay in real estate projects in India is pervasive. Organization and management (O&M) and project management (PM)-related challenges are argued to contribute to project delays. This study examined the O&M and PM factors that cause delays, the level of implementation of various O&M and PM aspects in real estate projects and how the challenges can be alleviated.

Design/methodology/approach

Perception surveys among the consumers and relevant stakeholders engaged in real estate projects in the Bhubaneswar and Cuttack regions of India were conducted to collect data on the factors of delay and implementation of the O&M and PM aspects. Relevant statistical methods and structural equation modeling (SEM) were used for data analysis.

Findings

Findings suggest that from the O&M point of view, poor decision-making, mishandling of finance, concurrent execution of many projects, diversion and misuse of finance for unrelated activities, lack of PM personnel and poor management contribute to the delay. Further, although the project initiation is satisfactorily done, most of the PM principles are not largely used, thus leading to delay.

Research limitations/implications

The study does have limitations, including its reliance on a perception survey of consumers and stakeholders, a limited sample size and a restricted number of projects. Nevertheless, the study highlights the need to address poor O&M and the insufficient application of PM principles to combat project delays in the Indian real estate sector.

Practical implications

Proper O&M and adequate application of PM will enable professional management of the projects and avoid delay.

Social implications

Proper O&M and the application of adequate PM would reduce delays in real estate projects. Consequently, conflicts between the companies and consumers might be reduced and housing and infrastructure demands might be met.

Originality/value

The study manifested that the lack of adequate implementation of O&M and PM aspects leads to delays. So, it is theorized that O&M and PM play critical roles in the success of real estate projects. Appropriate implementation of the principles and best practices linked to these aspects might alleviate the challenges of delay in real estate projects in India.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 31 July 2024

Aravindh Devandran, Felicita J. Davis and Michael Sammanasu Joseph

This study aims to determine and investigate the main causes of construction project delays. Construction projects are more intricate and associated with significant levels of…

1034

Abstract

Purpose

This study aims to determine and investigate the main causes of construction project delays. Construction projects are more intricate and associated with significant levels of risk owing to cost overruns. These overruns frequently lead to delays, incomplete work or other related challenges. Building delays are a prevalent problem in the building sector of developing nations. These delays prolong the duration of projects and result in increased costs and conflicts among stakeholders. A conceptual model consisting of the factors causing the delays in heating, ventilation and air conditioning (HVAC) projects was developed and tested in this study.

Design/methodology/approach

A comprehensive data collection process was undertaken. A meticulously designed survey was distributed to a diverse cohort of 294 participants, including contractors and sub-contractors from Chennai, Tamil Nadu. The data was collected using stratified sampling, ensuring a representative sample. The data was then analysed using ordinary least squares multiple regression.

Findings

The findings of this study have significant implications for the construction industry. They indicate that factors related to sales, clients, design, procurement, finance and labour all contribute to delays in HVAC projects. Understanding these factors can help stakeholders in the industry to better manage and mitigate project delays.

Originality/value

This study is unique because it is a perceptual study of stakeholders. It provides valuable information for analysing and assessing project performance by identifying the primary causes of HVAC project delays. To the best of the authors’ knowledge, the study conducted on HVAC projects is the first of its kind and hence makes a pivotal contribution to the literature on construction projects. Additionally, the study will assist policymakers and consultants in taking necessary steps to minimize delays.

Details

Vilakshan - XIMB Journal of Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0973-1954

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 December 2023

Farshad Peiman, Mohammad Khalilzadeh, Nasser Shahsavari-Pour and Mehdi Ravanshadnia

Earned value management (EVM)–based models for estimating project actual duration (AD) and cost at completion using various methods are continuously developed to improve the…

Abstract

Purpose

Earned value management (EVM)–based models for estimating project actual duration (AD) and cost at completion using various methods are continuously developed to improve the accuracy and actualization of predicted values. This study primarily aimed to examine natural gradient boosting (NGBoost-2020) with the classification and regression trees (CART) base model (base learner). To the best of the authors' knowledge, this concept has never been applied to EVM AD forecasting problem. Consequently, the authors compared this method to the single K-nearest neighbor (KNN) method, the ensemble method of extreme gradient boosting (XGBoost-2016) with the CART base model and the optimal equation of EVM, the earned schedule (ES) equation with the performance factor equal to 1 (ES1). The paper also sought to determine the extent to which the World Bank's two legal factors affect countries and how the two legal causes of delay (related to institutional flaws) influence AD prediction models.

Design/methodology/approach

In this paper, data from 30 construction projects of various building types in Iran, Pakistan, India, Turkey, Malaysia and Nigeria (due to the high number of delayed projects and the detrimental effects of these delays in these countries) were used to develop three models. The target variable of the models was a dimensionless output, the ratio of estimated duration to completion (ETC(t)) to planned duration (PD). Furthermore, 426 tracking periods were used to build the three models, with 353 samples and 23 projects in the training set, 73 patterns (17% of the total) and six projects (21% of the total) in the testing set. Furthermore, 17 dimensionless input variables were used, including ten variables based on the main variables and performance indices of EVM and several other variables detailed in the study. The three models were subsequently created using Python and several GitHub-hosted codes.

Findings

For the testing set of the optimal model (NGBoost), the better percentage mean (better%) of the prediction error (based on projects with a lower error percentage) of the NGBoost compared to two KNN and ES1 single models, as well as the total mean absolute percentage error (MAPE) and mean lags (MeLa) (indicating model stability) were 100, 83.33, 5.62 and 3.17%, respectively. Notably, the total MAPE and MeLa for the NGBoost model testing set, which had ten EVM-based input variables, were 6.74 and 5.20%, respectively. The ensemble artificial intelligence (AI) models exhibited a much lower MAPE than ES1. Additionally, ES1 was less stable in prediction than NGBoost. The possibility of excessive and unusual MAPE and MeLa values occurred only in the two single models. However, on some data sets, ES1 outperformed AI models. NGBoost also outperformed other models, especially single models for most developing countries, and was more accurate than previously presented optimized models. In addition, sensitivity analysis was conducted on the NGBoost predicted outputs of 30 projects using the SHapley Additive exPlanations (SHAP) method. All variables demonstrated an effect on ETC(t)/PD. The results revealed that the most influential input variables in order of importance were actual time (AT) to PD, regulatory quality (RQ), earned duration (ED) to PD, schedule cost index (SCI), planned complete percentage, rule of law (RL), actual complete percentage (ACP) and ETC(t) of the ES optimal equation to PD. The probabilistic hybrid model was selected based on the outputs predicted by the NGBoost and XGBoost models and the MAPE values from three AI models. The 95% prediction interval of the NGBoost–XGBoost model revealed that 96.10 and 98.60% of the actual output values of the testing and training sets are within this interval, respectively.

Research limitations/implications

Due to the use of projects performed in different countries, it was not possible to distribute the questionnaire to the managers and stakeholders of 30 projects in six developing countries. Due to the low number of EVM-based projects in various references, it was unfeasible to utilize other types of projects. Future prospects include evaluating the accuracy and stability of NGBoost for timely and non-fluctuating projects (mostly in developed countries), considering a greater number of legal/institutional variables as input, using legal/institutional/internal/inflation inputs for complex projects with extremely high uncertainty (such as bridge and road construction) and integrating these inputs and NGBoost with new technologies (such as blockchain, radio frequency identification (RFID) systems, building information modeling (BIM) and Internet of things (IoT)).

Practical implications

The legal/intuitive recommendations made to governments are strict control of prices, adequate supervision, removal of additional rules, removal of unfair regulations, clarification of the future trend of a law change, strict monitoring of property rights, simplification of the processes for obtaining permits and elimination of unnecessary changes particularly in developing countries and at the onset of irregular projects with limited information and numerous uncertainties. Furthermore, the managers and stakeholders of this group of projects were informed of the significance of seven construction variables (institutional/legal external risks, internal factors and inflation) at an early stage, using time series (dynamic) models to predict AD, accurate calculation of progress percentage variables, the effectiveness of building type in non-residential projects, regular updating inflation during implementation, effectiveness of employer type in the early stage of public projects in addition to the late stage of private projects, and allocating reserve duration (buffer) in order to respond to institutional/legal risks.

Originality/value

Ensemble methods were optimized in 70% of references. To the authors' knowledge, NGBoost from the set of ensemble methods was not used to estimate construction project duration and delays. NGBoost is an effective method for considering uncertainties in irregular projects and is often implemented in developing countries. Furthermore, AD estimation models do fail to incorporate RQ and RL from the World Bank's worldwide governance indicators (WGI) as risk-based inputs. In addition, the various WGI, EVM and inflation variables are not combined with substantial degrees of delay institutional risks as inputs. Consequently, due to the existence of critical and complex risks in different countries, it is vital to consider legal and institutional factors. This is especially recommended if an in-depth, accurate and reality-based method like SHAP is used for analysis.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 April 2024

Deraniyagalage Chanaka Karunarathna, H.A.H.P. Perera, B.A.K.S. Perera and P.A.P.V.D.S. Disaratna

Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with…

40

Abstract

Purpose

Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with resource allocation. Thus, this study investigates the influence of delay in utility shifting for extension of time claims in road construction projects (RCPs) in Sri Lanka.

Design/methodology/approach

The study used a quantitative approach with three rounds of Delphi surveys to gather empirical data. Further, the probability impact assessment was used to carefully analyse the data and appraise the information gathered.

Findings

The findings initially revealed 33 causes of delays in utility shifting for extension of time claims in RCPs in Sri Lanka. Ultimately, 11 severe causes were identified based on their high probability and impact, concluding with 45 strategies that were assigned to overcoming those most severe causes of delay.

Originality/value

This study will contribute to the industry and theory by providing solutions to handle utility-shifting delays with the linkage of preventing time extension claims for RCPs in Sri Lanka. Further, there is a dearth of literature in the research area, both locally and globally. Thus, the findings of this research will provide a benchmark for further detailed studies in other countries as well.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 24 May 2024

Ali Mohammad Mirzaee and Igor Martek

Optimal clean-up procedures lie at the heart of the closeout phase of construction projects under contract law. However, due to its complexity involving multiple issues…

Abstract

Purpose

Optimal clean-up procedures lie at the heart of the closeout phase of construction projects under contract law. However, due to its complexity involving multiple issues, potentially unfulfilled contractual obligations, performance claims and counter-claims, combined with consequently deteriorating stakeholder relationships, the management of closeouts is fraught with difficulties leading to suboptimal outcomes. This is particularly true where general contractor (GC) organizations do not have a claims management office (CMO) dedicated to improving such suboptimal clean-up outcomes. Thus, this study aims to develop a model by which CMOs’ may effectively manage the clean-up phase in an environment of closeout claims.

Design/methodology/approach

X-inefficiency theory was utilized as the theoretical lens guiding this study. The theory helps identify closeout strategies implemented by a GC, which manages completion claims through a CMO. Data were received and analyzed from a large GC, which served as the firm case study. In this case, managing the closeout completion claims was the main function of the CMO.

Findings

The average delay of closeout completion was four times greater than construction phase delays. The GC results highlighted the “economic destruction tsunami of projects,” as a root cause for these completion delays. Wrap-up activities under contract law are identified, including within the domains of statements of completion, project handover and debt settlement. Behavior strategies are also defined, including relational and contractual approaches. Moreover, a process for improving closeout claim performance is described, comprising project closeout identification, rational intra-firm behavior, closeout completion and program closeout practice.

Originality/value

Findings from this work can significantly contribute in X-inefficiency theory in relation to how a decrease of X-inefficiency will lead to better closeout claim performance. It also offers practical insights into how best to minimize delayed closeout completion while providing valuable lessons for stakeholders in complex infrastructure projects. Further, a model is developed that may be utilized by owners, consultancies, designers and other contractor organizations in an effort to improve closeout claim performance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 October 2023

Muhammad Saiful Islam, Madhav Nepal and Martin Skitmore

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural…

Abstract

Purpose

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural relationships among each other. The purpose of this study is, therefore, to establish the complex structural relationships of risks involved.

Design/methodology/approach

In total, 76 published articles from the previous literature are reviewed using the content analysis method. Three risk networks in different phases of power plant projects are depicted based on literature review and case studies. The possible methods of solving these risk networks are also discussed.

Findings

The study finds critical cost overrun risks and develops risk networks for the procurement, civil and mechanical works of power plant projects. It identifies potential models to assess cost overrun risks based on the developed risk networks. The literature review also revealed some research gaps in the cost overrun risk management of power plants and similar infrastructure projects.

Practical implications

This study will assist project risk managers to understand the potential risks and their relationships to prevent and mitigate cost overruns for future power plant projects. It will also facilitate decision-makers developing a risk management framework and controlling projects’ cost overruns.

Originality/value

The study presents conceptual risk networks in different phases of power plant projects for comprehending the root causes of cost overruns. A comparative discussion of the relevant models available in the literature is presented, where their potential applications, limitations and further improvement areas are discussed to solve the developed risk networks for modeling cost overrun risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 20 February 2024

Huy Minh Vo, Jyh-Bin Yang and Veerakumar Rangasamy

Construction projects commonly encounter complicated delay problems. Over the past few decades, numerous delay analysis methods (DAMs) have been developed. There is no consensus…

Abstract

Purpose

Construction projects commonly encounter complicated delay problems. Over the past few decades, numerous delay analysis methods (DAMs) have been developed. There is no consensus on whether existing DAMs effectively resolve delays, particularly in the case of complex concurrent delays. Thus, the primary objective of this study is to undertake a comprehensive and systematic literature review on concurrent delays, aiming to answer the following research question: Do existing delay analysis techniques deal with concurrent delays well?

Design/methodology/approach

This study conducts a comprehensive review of concurrent delays by both bibliometric and systematic analysis of research publications published between 1982 and 2022 in the Web of Science (WoS) and Scopus databases. For quantitative analysis, a bibliometric mapping tool, the VOSviewer, was employed to analyze 68 selected publications to explore the co-occurrence of keywords, co-authorship and direct citation. Additionally, we conducted a qualitative analysis to answer the targeted research question, identify academic knowledge gaps and explore potential research directions for solving the theoretical and practical problems of concurrent delays.

Findings

Concurrent delays are a critical aspect of delay claims. Despite DAMs developed by a limited number of research teams to tackle issues like concurrence, float consumption and the critical path in concurrent delay resolution, practitioners continue to face significant challenges. This study has successfully identified knowledge gaps in defining, identifying, analyzing and allocating liability for concurrent delays while offering promising directions for further research. These findings reveal the incompleteness of available DAMs for solving concurrent delays.

Practical implications

The outcomes of this study are highly beneficial for practitioners and researchers. For practitioners, the discussions on the resolution process of concurrent delays in terms of identification, analysis and apportionment enable them to proactively address concurrent delays and lay the groundwork for preventing and resolving such issues in their construction projects. For researchers, five research directions, including advanced DAMs capable of solving concurrent delays, are proposed for reference.

Originality/value

Existing research on DAMs lacks comprehensive coverage of concurrent delays. Through a scientometric review, it is evident that current DAMs do not deal with concurrent delays well. This review identifies critical knowledge gaps and offers insights into potential directions for future research.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords