Open Access
Article
Publication date: 18 April 2023

Tommi Pauna, Jere Lehtinen, Jaakko Kujala and Kirsi Aaltonen

The aim of this research was to understand how governmental stakeholder engagement facilitates the sustainability of industrial engineering (IE) projects. A model for governmental…

2205

Abstract

Purpose

The aim of this research was to understand how governmental stakeholder engagement facilitates the sustainability of industrial engineering (IE) projects. A model for governmental stakeholder engagement activities is presented.

Design/methodology/approach

The authors relied on a single-case study of a mining project in Northern Europe, where a novel collaboration and engagement approach with governmental stakeholders was piloted in the project's front-end phase. The analysis focused on the collaborative practices through which the IE project investor engaged governmental stakeholders during the project's front-end phase and how the engagement contributed to solving challenges in the early planning and permitting process and achieving project plans that balanced economic, social and environmental aspects.

Findings

The findings show how four collaborative engagement practices reduced uncertainty and equivocality related to the legal sustainability requirements, enabled the development of sustainable design solutions and overall accelerated the permitting process without compromising the quality of final project plans.

Practical implications

The findings can be used to plan governmental stakeholder engagement and understand related challenges that need to be overcome. The study highlights the need to develop established practices and guidelines for governmental stakeholder engagement.

Originality/value

This study complements prior research on stakeholder engagement and project sustainability by developing an understanding of how governmental stakeholder engagement can be a key mechanism enabling the sustainability of IE project's end product. This research contributes to stakeholder theory by elaborating on a new stakeholder role, intermediary stakeholder.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 26 June 2023

Petter Haglund and Mats Janné

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service…

1146

Abstract

Purpose

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service provider (LSP). However, construction logistics is normally approached either as a strategic decision or as an operational issue and rarely as a tactical concern. The purpose of this study is to explore how to organize the logistics outsourcing decision at strategic, tactical and operational levels.

Design/methodology/approach

This study is performed as a single-case study within a construction corporation, containing (amongst others) a building contractor (BC) and a construction equipment rental company (CERC) offering logistics services.

Findings

The study shows that to procure construction logistics service successfully, BCs need logistics capabilities at strategic and tactical levels to maintain an alignment between the use of logistics services and operational characteristics. Simultaneously, CERC’s need to design their service offerings to correspond to the needs of the BC.

Research limitations/implications

This study builds on a single-case study of a Swedish construction corporation. Further research is needed to better understand current logistics outsourcing and development practices and how these can be improved to foster better logistics management at the project level.

Practical implications

BCs find suggestions of different logistics organization structures and suitable outsourcing arrangements. CERCs and LSPs can use the findings to understand their customers’ needs and adapt service offerings.

Originality/value

To the best of the authors’ knowledge, this study is one of the first studies of how two companies within a corporation can work together to develop construction logistics service offerings.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 31 May 2022

Kari-Pekka Tampio and Harri Haapasalo

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…

1056

Abstract

Purpose

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.

Design/methodology/approach

Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.

Findings

All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.

Practical implications

Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.

Originality/value

This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 1 February 2024

Jo Trowsdale and Richard Davies

There is a lack of clarity about what constitutes Science, Technology, Engineering, Arts and Mathematics (STEAM) education and what the arts contribute. In this paper the authors…

Abstract

Purpose

There is a lack of clarity about what constitutes Science, Technology, Engineering, Arts and Mathematics (STEAM) education and what the arts contribute. In this paper the authors discuss a distinct model, theorised from a five-year study of a particular, innovative STEAM education project (The Imagineerium), and developed by the researchers through working with primary school teachers in England within a second project (Teach-Make). The paper examines how teachers implemented this model, the Trowsdale art-making model for education (the TAME), and reflected on its value and positive impact on their planning and pedagogy.

Design/methodology/approach

The paper draws on two studies: firstly, a five-year, mixed methods, participative study of The Imagineerium and secondly a participative and collaborative qualitative study of Teach-Make.

Findings

Study of The Imagineerium showed strong positive educational outcomes for pupils and an appetite from teachers to translate the approach to the classroom. The Teach-Make project showed that with a clear curriculum model (the TAME) and professional development to improve teachers' planning and active pedagogical skills, they could design and deliver “imagineerium-like” schemes of work in their classrooms. Teachers reported a positive impact on both their own approach to supporting learning, as well as pupil progression and enjoyment.

Originality/value

The paper argues that the TAME, a consolidation of research evidence from The Imagineerium and developed through Teach-Make, offers both a distinctive and effective model for STEAM and broader education, one that is accessible to, valued by and manageable for teachers.

Details

Journal of Research in Innovative Teaching & Learning, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2397-7604

Keywords

Open Access
Article
Publication date: 29 June 2023

Carl Marnewick and Annlizé L. Marnewick

Project managers face decisions every day and those decisions result in an “either or” situation. This is also true when it comes to the choice of a project management approach…

2045

Abstract

Purpose

Project managers face decisions every day and those decisions result in an “either or” situation. This is also true when it comes to the choice of a project management approach, i.e. predictive versus iterative. A case is made in this article that project managers should be ambidextrous and apply practices that are beneficial to the project, irrespective of the origin of the practices.

Design/methodology/approach

This study is based on a questionnaire focussing on six themes. The results of 290 projects were analysed using ANOVA and boxplots to test for skewness and variances.

Findings

Based on the analysis of 117 practices, most of these projects could be classified as either hybrid or iterative projects. The results indicate that irrespective of the classification of the projects or the industry, projects are managed using a hybrid approach, with a tendency to incorporate more iterative practices than predictive practices.

Originality/value

This article contributes to the current debate on which approach is the best given certain circumstances.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 6 July 2023

Caroline Ingvarsson, Anette Hallin and Christof Kier

The purpose of this paper is to explore how gamification may be used for project stakeholder engagement.

1474

Abstract

Purpose

The purpose of this paper is to explore how gamification may be used for project stakeholder engagement.

Design/methodology/approach

The paper presents the results of a systematic literature review of extant research concerning the gamification of projects. Based on this, an agenda for future studies is outlined.

Findings

Extant research on the gamification of projects is scarce and scattered among various disciplines, but the engineering fields dominate. The research performed does indicate that gamification may be used for involving stakeholders in projects, primarily by promoting learning, but also by engaging them, motivating action and solving problems.

Research limitations/implications

In several cases, extant research display poor quality in research design and a lack in cross-disciplinary perspectives, which means that more research is needed. The users’ perspective is often lacking. Furthermore, the ideas gamification might be “hidden” within other technologies.

Practical implications

The findings of this research may assist project management practitioners in the endeavor of adopting gamification principles to better involve stakeholders.

Originality/value

The study fills a gap in summarizing the research on how gamification may be used to promote project stakeholder engagement. Based on this, it proposes a research agenda for future research on the use of gamification to promote project stakeholder engagement.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 1 August 2023

Jacob Guerrero and Susanne Engström

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving…

Abstract

Purpose

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving innovation in the transport infrastructure sector.

Design/methodology/approach

Addressing a large public client in Sweden, a case study design was initially applied to provide in-depth insights and perspectives of client project managers’ views and experiences of managing projects expected to drive innovation. In this paper, the concepts of “hard” and “soft” are used to discuss empirical findings on challenges associated with adopting a PM-approach for driving innovation in projects. The empirical material consists of interview data, complemented with observations and archival data.

Findings

Findings reveal challenges associated with combining hard and soft approaches, frequently demonstrating difficulties in balancing short-term project expectations with the promotion of innovation. In line with the literature, project managers note that there is a need for soft approaches to promote development and drive innovation. Yet, findings reflect a situation in which operational success criteria predominate, whereas soft approaches are not sufficiently used to create the grounds required for fostering innovation.

Originality/value

Insights are provided into how PM-approaches may impact construction innovation in the infrastructure sector, demonstrating a need for further research on the challenges and implications of applying and combining hard and soft PM-approaches.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 2 October 2023

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Godspower C. Amadi and Okechukwu Dominic Saviour Duru

In most developing countries, indigenous emerging construction contractors (ECCs) face severe problems of not adopting a project management framework (PMF) in their business…

Abstract

Purpose

In most developing countries, indigenous emerging construction contractors (ECCs) face severe problems of not adopting a project management framework (PMF) in their business activities. It has increased their business risk and threatened their sustainability. Studies showed that government policy support (GPS) helps mitigate business risks. Thus, there is a paucity of literature concerning GPS on emerging Nigerian construction contractors' business sustainability. Therefore, the paper aims to investigate the moderating effect of GPS on the relationship between PMF and ECCs in Nigeria.

Design/methodology/approach

SmartPLS was used to analyse the collected data from the useable 310 questionnaires retrieved from respondents in Abuja and Lagos, Nigeria. Systems Theory was used to support the developed framework.

Findings

Findings show that government policy support significantly moderates the relationships between PMF and ECCs in the Nigerian construction sector. It implies that the study's results offer more understanding regarding issues affecting construction entrepreneurs' sustainable business cycle via applying PMF to mitigate business sustainable associated risks.

Practical implications

The study will stir Nigeria's ECCs and policymakers to promote construction business sustainability for a new entrepreneur, emphasising business risk management via PMF and GPS to enhance the sustainable business cycle.

Originality/value

The research (PMF and GPS) is strategies to enhance ECCs business sustainability in the Nigerian construction sector and other developing countries with similar political and economic attributes. Besides the study guiding old and intending ECCs and policymakers in the developing countries industries, it would contribute to bridge the theoretical gap regarding PMF and ECC, especially ECCs in developing countries with similar business sustainability issues.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2056

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79331

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Access

Only Open Access

Year

Last 6 months (1545)

Content type

1 – 10 of over 1000