Article
Publication date: 12 April 2024

Kyudong Kim, Helena R. Tiedmann and Kasey M. Faust

The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related…

Abstract

Purpose

The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related changes, how these changes may apply to different companies, and which changes should continue post-pandemic.

Design/methodology/approach

We aim to identify pandemic-driven changes that have affected the construction workplace and the advantages and challenges associated with them. We then make recommendations for what could and should endure through the pandemic and beyond, and under what circumstances. To achieve this objective, we conducted both qualitative and quantitative analyses of 40 semi-structured interviews with US-based construction professionals.

Findings

Identified through these interviews were 21 pandemic-driven changes across six categories: management and planning, technology, workforce, health and safety, supply chain, and contracts. This study noted both positive and negative impacts of the changes on cost, schedule, productivity, collaboration, employee retention, flexibility, quality, and risk mitigation. Participants indicated that some changes should remain after the pandemic and others (e.g. select safety measures, schedule adjustments) should be temporary.

Originality/value

By incorporating these lessons learned into recommendations, the findings of this study will help businesses identify and implement the most appropriate improvements for their organizations. The findings also provide policymakers with valuable insights on how to promote innovation in the construction industry and potentially enact more effective policies during crises to drive long-term improvements.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 February 2024

Wenque Liu, Albert P.C. Chan, Man Wai Chan, Amos Darko and Goodenough D. Oppong

The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and…

Abstract

Purpose

The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and particularity. Employing key performance indicators (KPIs) facilitates the monitoring of HPs to advance their successful delivery. This study aims to comprehensively investigate the KPIs for hospital planning and construction (HPC).

Design/methodology/approach

The KPIs for HPC were identified through a systematic review. Then a comprehensive assessment of these KPIs was performed utilizing a meta-analysis method. In this process, basic statistical analysis, subgroup analysis, sensitive analysis and publication bias analysis were performed.

Findings

Results indicate that all 27 KPIs identified from the literature are significant for executing HPs in P&C phases. Also, some unconventional performance indicators are crucial for implementing HPs, such as “Project monitoring effectiveness” and “Industry innovation and synergy,” as their high significance is reflected in this study. Despite the fact that the findings of meta-analysis are more trustworthy than those of individual studies, a high heterogeneity still exists in the findings. It highlights the inherent uncertainty in the construction industry. Hence, this study applied subgroup analysis to explore the underlying factors causing the high level of heterogeneity and used sensitive analysis to assess the robustness of the findings.

Originality/value

There is no consensus among the prior studies on KPIs for HPC specifically and their degree of significance. Additionally, few reviews in this field have focused on the reliability of the results. This study comprehensively assesses the KPIs for HPC and explores the variability and robustness of the results, which provides a multi-dimensional perspective for practitioners and the research community to investigate the performance of HPs during the P&C stages.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Frank Ato Ghansah and Weisheng Lu

While COVID-19 mitigation measures (CMMs) aided in steady recovery during the pandemic, they also impeded movement across economies/borders, affecting quality assurance (QA) of…

Abstract

Purpose

While COVID-19 mitigation measures (CMMs) aided in steady recovery during the pandemic, they also impeded movement across economies/borders, affecting quality assurance (QA) of Cross-border Construction Logistics and Supply Chain (Cb-CLSC). However, prior studies on the pandemic in the construction project industry have not revealed how CMMs have impacted QA. Thus, this study aims to evaluate the impact of the CMMs on the QA of Cb-CLSC.

Design/methodology/approach

This is achieved by adopting an embedded mixed-method approach involving a desk literature review and engaging 150 experts from different economies across the globe using expert surveys, and results verified via semi-structured expert interviews. Structural equation modelling-based multiple regression analysis (SEM-MRA) was integrated to examine the impact of the CMMs on the QA, along with descriptive and content analysis.

Findings

The study confirmed that CMMs have not only impacted the QA negatively but also influenced the positioning of the QA for the post-pandemic era and probably to survive the risks of future pandemics. Among all the identified CMMs, the top three critical measures include “lockdown (CMM2)”, “use of personal protective equipment, such as nose masks, disinfects, etc. (CMM5)”, and “electronic/virtual meetings (CMM7)”. However, CMM5 possesses the highest contributory power to form CMM in impacting the QA, and this can be regarded as largely positive by strengthening health and safety management systems. Its negative impact lies with the project cost increment and the inconveniences of using nose and face masks.

Practical implications

This study provides a better understanding to construction practitioners and policy makers on how the pandemic policies, i.e. CMMs, have impacted QA and can aid in formulating planning and operational decisions to adequately position the QA for the post-pandemic era and to endure the risks of future pandemics.

Originality/value

The study contributes to knowledge in that it provides a better understanding of how the pandemic policies, such as CMMs, have impacted QA and can aid in formulating planning and operational decisions to adequately position the QA for the post-pandemic era and to endure the risks of future pandemics. This area of study has been given limited attention among prior studies during the pandemic.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 11 April 2024

Yi Lu, Gayani Karunasena and Chunlu Liu

From May 2024, Victoria (Australia) will mandatorily raise the minimum house energy rating standards from 6 to 7 stars. However, the latest data shows that only 5.73% of new…

Abstract

Purpose

From May 2024, Victoria (Australia) will mandatorily raise the minimum house energy rating standards from 6 to 7 stars. However, the latest data shows that only 5.73% of new Victorian houses were designed beyond 7-star. While previous literature indicates the issue’s link to the compliance behaviour of building practitioners in the design phase, the underlying behavioural determinants are rarely explored. This study thus preliminarily examines building practitioners’ compliance behaviour with 7-star Australian house energy ratings and beyond.

Design/methodology/approach

Using a widely-applied method to initially examine an under-explored phenomenon, eight expert interviews were conducted with building practitioners, a state-level industry regulator and a leading national building energy policy researcher. The study triangulated the data with government-led research reports.

Findings

The experts indicate that most building practitioners involved in mainstream volume projects do not go for 7 stars, mainly due to perceived compliance costs and reliance on standardized designs. In contrast, those who work on custom projects are more willing to go beyond 7-star mostly due to the moral norms for a low-carbon environment. The experts further agree that four behavioural determinants (attitudes towards compliance, subjective norms, perceived behavioural control and personal norms) co-shape building practitioners’ compliance behaviour. Interventions targeting these behavioural determinants are recommended for achieving 7 stars and beyond.

Originality/value

This study demonstrates the behavioural determinants that influence building practitioners’ compliance decisions, and offers insight regarding how far they will go to meet 7 stars. It can facilitate the transition to 7 stars by informing policymakers of customized interventions to trigger behaviour change.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 17 May 2024

Sina Moradi, Janne Hirvonen and Piia Sormunen

The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built…

Abstract

Purpose

The energy performance gap (EPG) in building construction has been one of the major barriers to the realization of environmental and economic sustainability in the built environment. Although there have been a few studies addressing this issue, studying this topic with a special focus on the project delivery process has been almost overlooked. Hence, this study aims to address the EPG in building construction through the lens of collaborative and life cycle-based project delivery.

Design/methodology/approach

In order to realize the objective of this study, the development of a theoretical framework based on the literature review was followed by a qualitative study in which 21 semi-structured interviews were conducted with Finnish project professionals representing clients, design/planning experts, constructors and building operation/maintenance experts to explore their views on the topic under study.

Findings

The findings reveal the project delivery-related causes of EPG in building construction. Moreover, the obtained results present a collaborative and life cycle-based delivery model that integrates project and product (i.e. building) life cycles, and it is compatible with all types of contractual frameworks in building construction projects.

Research limitations/implications

Although the findings of this study significantly contribute to theory and practice in the field of collaborative and sustainable construction project delivery, it is acknowledged that these findings are based on Finnish professionals’ input, and expanding this research to other regions is a potential area for further studies. Moreover, the developed model, although validated in Finland, needs to be tested in a broader context as well to gain wider generalizability.

Originality/value

The obtained results reveal the significance and impact of collaborative and life cycle-based project development and delivery on the realization of environmentally sustainable building construction.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 21 May 2024

Chelteau Barajei, Emmanuel Bamfo-Agyei, Prince Antwi-Agyei, Musah Osumanu Doumbia and Mac Nyameche

The procurement reforms carried out by the Government of Ghana have led to the creation of the Public Procurement Authority and the passage of the Public Procurement (Amended) Act…

Abstract

Purpose

The procurement reforms carried out by the Government of Ghana have led to the creation of the Public Procurement Authority and the passage of the Public Procurement (Amended) Act 2016. Nevertheless, many obstacles could prevent an open and fair competition during the procurement of works. This significantly affects the success of Ghanaian construction projects. Therefore, this paper aims to explore the factors to enhance the success of the contractor selection phase of the Ghanaian public labor-based construction project.

Design/methodology/approach

A quantitative research approach was adopted by this study. Data was collected through a self-administered questionnaire to 377 respondents across Ghana. The data was then analyzed using structural equation modeling.

Findings

This study revealed that external, project procedures and project management factors impact the Ghanaian labor-based contractor selection phase success.

Research limitations/implications

This study is limited to the contractor selection phase of Ghanaian public labor-based projects and developing nations with similar socioeconomic characteristics.

Social implications

Strict adherence to this study’s findings will enable the government to undertake more infrastructure projects to raise the standard of living for its populace.

Originality/value

Although several studies have been conducted to improve the success of construction projects in developing nations, very little focus has been placed on the success factors of the contractor selection phase of public construction projects. These findings are vital in discovering for the first-time factors influencing the success of the tender stage of public labor-based projects in Ghana and developing nations with similar socioeconomic characteristics.

Details

Journal of Public Procurement, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1535-0118

Keywords

Article
Publication date: 7 May 2024

Haonan Qi, Zhipeng Zhou, Javier Irizarry, Xiaopeng Deng, Yifan Yang, Nan Li and Jianliang Zhou

This study aims to modify the human factors analysis and classification system (HFACS) to make it suitable for collapse accident analysis in construction. Based upon the modified…

Abstract

Purpose

This study aims to modify the human factors analysis and classification system (HFACS) to make it suitable for collapse accident analysis in construction. Based upon the modified HFACS, distribution patterns of causal factors across multiple levels were discerned among causal factors of various stakeholders at construction sites. It explored the correlations between two causal factors from different levels and further determined causation paths from two perspectives of level and stakeholder.

Design/methodology/approach

The main research framework consisted of data collection, coding and analysis. Collapse accident reports were collected with adequate causation information. The modified HFACS was utilized for coding causal factors across all five levels in each case. A hybrid approach with two perspectives of level and stakeholder was proposed for frequency analysis, correlation analysis and path identification between causal factors.

Findings

Eight causal factors from external organizations at the fifth level were added to the original HFACS. Level-based correlation analyses and path identification provided safety managers with a holistic view of inter-connected causal factors across five levels. Stakeholder-based correlation analyses between causal factors from the fifth level and its non-adjacent levels were implemented based on client, government and third parties. These identified paths were useful for different stakeholders to develop specific safety plans for avoiding construction collapse accidents.

Originality/value

This paper fulfils an identified need to modify and utilize the HFACS model for correlation analysis and path identification of causal factors resulting in collapse accidents, which can provide opportunities for tailoring preventive and protective measures at construction sites.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Access

Year

Last 3 months (147)

Content type

Earlycite article (147)
1 – 10 of 147