1 – 10 of over 1000Katherine L. Yuracko and Michael I. Morris
Given the enormous scope of the decontamination and decommissioning (D&D) work that government and industry face, there is a tremendous opportunity to save money and avoid further…
Abstract
Given the enormous scope of the decontamination and decommissioning (D&D) work that government and industry face, there is a tremendous opportunity to save money and avoid further insults to the environment and to human health by applying the principles of life cycle analysis (LCA). An LCA approach is presented that is especially valuable in D&D decision making because it provides a systematic, comprehensive, defensible decision‐aiding process to find solutions that reduce costs and risks of D&D projects. Our approach to LCA differs from other approaches by taking into consideration all the factors important to owners and stakeholders – life cycle cost, health and safety, the environment, programmatic impacts, and other factors. Stakeholder participation is also a key part of the process. The result is robust, durable solutions for even the most complex D&D project. A specific demonstration of this approach to aid D&D at two US Department of Energy sites is presented.
Details
Keywords
Ronghua Cai, Jiamei Yang, Xuemin Xu and Aiping Jiang
The purpose of this paper is to propose an improved multi-objective optimization model for the condition-based maintenance (CBM) of single-component systems which considers…
Abstract
Purpose
The purpose of this paper is to propose an improved multi-objective optimization model for the condition-based maintenance (CBM) of single-component systems which considers periodic imperfect maintenance and ecological factors.
Design/methodology/approach
Based on the application of non-periodic preventive CBM, two recursion models are built for the system: hazard rate and the environmental degradation factor. This paper also established an optimal multi-objective model with a normalization process. The multiple-attribute value theory is used to obtain the optimal preventive maintenance (PM) interval. The simulation and sensitivity analyses are applied to obtain further rules.
Findings
An increase in the number of the occurrences could shorten the duration of a maintenance cycle. The maintenance techniques and maintenance efficiency could be improved by increasing system availability, reducing cost rate and improving degraded condition.
Practical implications
In reality, a variety of environmental situations may occur subsequent to the operations of an advanced manufacturing system. This model could be applied in real cases to help the manufacturers better discover the optimal maintenance cycle with minimized cost and degraded condition of the environment, helping the corporations better fulfill their CSR as well.
Originality/value
Previous research on single-component condition-based predictive maintenance usually focused on the maintenance costs and availability of a system, while ignoring the possible pollution from system operations. This paper proposed a modified multi-objective optimization model considering environment influence which could more comprehensively analyze the factors affecting PM interval.
Details
Keywords
Mahnaz Hosseinzadeh, Marzieh Samadi Foroushani, Hakim Ghayem and Mohammad Reza Mehregan
While the petroleum industry remains to be the main source of energy in the world, it is responsible for a large amount of resource consumption, environmental emission and safety…
Abstract
Purpose
While the petroleum industry remains to be the main source of energy in the world, it is responsible for a large amount of resource consumption, environmental emission and safety issues. In this industry, most of the refinery equipment are running out of their designed life cycle, leading to many challenges regarding equipment reliability, products quality, organizations’ profitability, human resources safety and job satisfaction, and environmental pollution, which affects not only the human resources of the refinery but also the people who live in the vicinity. This study aims to model and simulate the maintenance system of an oil refinery to reduce the rotating equipment’s downtime while simultaneously considering the three pillars of sustainability.
Design/methodology/approach
Considering the complexity of the system and its inherent dynamism, System Dynamics (SD) approach is applied to model and simulate the maintenance system of an oil refinery, aiming at reducing equipment’s downtime considering the three pillars of sustainability simultaneously. As a case study, the maintenance system of rotating equipment in the Abadan oil refinery of Iran is investigated.
Findings
Individual policies are investigated and categorized into three main groups: economic, social and environmental. The dynamic nature of the system demonstrates that applying combinations of the policies would be more effective than performing individual ones or even a combination of all policies at the same time. The findings show that to manage the maintenance and reliability issues in complex industries, only operational level maintenance strategies would not be helpful; rather, a holistic strategic solution counting different suppliers or even the government policies supporting the operational level maintenance decisions would be effective.
Originality/value
This study is the first which brings the perspective of sustainable policy-making in the SD modeling of a complex maintenance system like that of the petroleum industry. The developed model considers economic, environmental and social objectives simultaneously. Besides, it reflects the role of different stakeholders in the system. Furthermore, the policy-making attempt is not limited to the operational level corrective and maintenance solutions; instead, a comprehensive, holistic view is applied.
Details
Keywords
Mustafa Graisa and Amin Al‐Habaibeh
The purpose of this paper is to investigate maintenance and production problems in the cement industry in Libya, with particular emphasis on future implementation of total…
Abstract
Purpose
The purpose of this paper is to investigate maintenance and production problems in the cement industry in Libya, with particular emphasis on future implementation of total productive maintenance (TPM).
Design/methodology/approach
The paper presents the use of case study approach of production data and history, field visits, a survey methodology using a detailed questionnaire with employees and interviews with top and middle managers in four cement factories.
Findings
It has been found that the four factories under investigation have low productivity and production levels when compared with the design values. There is no clear TPM strategy and also it has been found that the lack of training and personal development is the main cause of this problem. In addition, employees are found not to be motivated as a result of the lack of a management strategy and reward structure.
Research limitations/implications
Based on the findings, a new framework for TPM has been developed. This TPM strategy could be implemented in other Libyan factories as a result of the potential similarities in the cultural and environmental aspects.
Practical implications
The current challenges have been identified and comparative analysis is developed into a model for the implementation of TPM.
Originality/value
The paper highlights limitations in some of the cement factories in Libya in relation to TPM and production strategies. The importance of adopting a realistic strategy and framework by managers is discussed. This work is developed as collaboration between academia and one of the Libyan cement companies to solve productivity problems and develop a strategic framework of TPM for improving Libyan industry.
Details
Keywords
Kong Fah Tee and Ejiroghene Ekpiwhre
The purpose of this paper is to present a study of reliability-centred maintenance (RCM), which is conducted on the key sub-assets of a newly constructed road junction…
Abstract
Purpose
The purpose of this paper is to present a study of reliability-centred maintenance (RCM), which is conducted on the key sub-assets of a newly constructed road junction infrastructure in Nigeria.
Design/methodology/approach
The classical RCM methodology, a type of RCM, which has a top down, zero-based approach for maintenance analysis, is implemented in this study.
Findings
The implementation of the classical RCM is successful in its application of various PM policies assigned to the assets and it shows that its application in the highway industry could reduce excessive maintenance backlog and frequent reactive maintenance by effective optimisation of its preventive maintenance (PM) intervals.
Practical implications
Road junctions are originators of more than 70 per cent of road traffic congestion and account for high accident rate. The traditional methods of reliability assurance used in the highway industry such as reactive maintenance and routine maintenance are often inadequate to meet the round the clock usage demands of these assets, thus the consideration for the application of a systematic RCM process for maintaining the system function by selecting and applying effective PM tasks.
Originality/value
It uses an approach that critically develops and analyses thoroughly preventive and continuous maintenance strategy in a new circumstance with environment of uncertainty and limited operating data. The case-based reasoning cycle has been applied in the RCM approach with real-time data obtained from a UK-based network maintenance management system for highway infrastructures.
Details
Keywords
Alireza Ahmadi, Peter Söderholm and Uday Kumar
The purpose of this paper is to present issues and challenges of scheduled maintenance task development within the maintenance review board (MRB) process, and to find potential…
Abstract
Purpose
The purpose of this paper is to present issues and challenges of scheduled maintenance task development within the maintenance review board (MRB) process, and to find potential areas of improvement in the application of the MSG‐3 methodology for aircraft systems.
Design/methodology/approach
The issues and challenges as well as potential areas of improvement have been identified through a constructive review that consists of two parts. The first part is a benchmarking between the Maintenance Steering Group (MSG‐3) methodology and other established and documented versions of reliability‐centred maintenance (RCM). This benchmarking focuses on the MSG‐3 methodology and compares it with some RCM standards to identify differences and thereby find ways to facilitate the application of MSG‐3. The second part includes a discussion about methodologies and tools that can support different steps of the MSG‐3 methodology within the framework of the MRB process.
Findings
The MSG‐3 methodology is closely related to the RCM methodology, in which the anticipated consequences of failure are considered for risk evaluation. However, MSG‐3 considers neither environmental effects of failures nor operational consequences of hidden failures. Furthermore, in MSG‐3, the operational check (failure‐finding inspection) is given priority before all other tasks, whereas in RCM it is considered as a default action, where there is no other applicable and effective option. While RCM allows cost‐effectiveness analysis for all failures that have no safety consequences, MSG‐3 just allows it for failures with economic consequences. A maintenance program that is established through the MRB process fulfils the requirements of continuous airworthiness, but there is no foundation to claim that it is the optimal or the most effective program from an operator's point‐of‐view. The major challenge when striving to achieve a more effective maintenance program within the MRB process is to acquire supporting methodologies and tools for adequate risk analysis, for optimal interval assignments, and for selection of the most effective maintenance task.
Originality/value
The paper presents a critical review of existing aircraft scheduled maintenance program development methodologies, and demonstrates the differences between MSG‐3 and other RCM methodologies.
Details
Keywords
Compiled by K.G.B. Bakewell covering the following journals published by MCB University Press: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18;…
Abstract
Compiled by K.G.B. Bakewell covering the following journals published by MCB University Press: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18; Property Management Volumes 8‐18; Structural Survey Volumes 8‐18.
Index by subjects, compiled by K.G.B. Bakewell covering the following journals: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18; Property Management…
Abstract
Index by subjects, compiled by K.G.B. Bakewell covering the following journals: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18; Property Management Volumes 8‐18; Structural Survey Volumes 8‐18.
Compiled by K.G.B. Bakewell covering the following journals published by MCB University Press: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18;…
Abstract
Compiled by K.G.B. Bakewell covering the following journals published by MCB University Press: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18; Property Management Volumes 8‐18; Structural Survey Volumes 8‐18.
Compiled by K.G.B. Bakewell covering the following journals published by MCB University Press: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18;…
Abstract
Compiled by K.G.B. Bakewell covering the following journals published by MCB University Press: Facilities Volumes 8‐18; Journal of Property Investment & Finance Volumes 8‐18; Property Management Volumes 8‐18; Structural Survey Volumes 8‐18.