Search results

1 – 10 of 423
Article
Publication date: 18 September 2024

Felipe Terra Mohad, Leonardo de Carvalho Gomes, Guilherme da Luz Tortorella and Fernando Henrique Lermen

Total productive maintenance consists of strategies and procedures that aim to guarantee the entire functioning of machines in a production process so that production is not…

Abstract

Purpose

Total productive maintenance consists of strategies and procedures that aim to guarantee the entire functioning of machines in a production process so that production is not interrupted and no loss of quality in the final product occurs. Planned maintenance is one of the eight pillars of total productive maintenance, a set of tools considered essential to ensure equipment reliability and availability, reduce unplanned stoppage and increase productivity. This study aims to analyze the influence of statistical reliability on the performance of such a pillar.

Design/methodology/approach

In this study, we utilized a multi-method approach to rigorously examine the impact of statistical reliability on the planned maintenance pillar within total productive maintenance. Our methodology combined a detailed statistical analysis of maintenance data with advanced reliability modeling, specifically employing Weibull distribution to analyze failure patterns. Additionally, we integrated qualitative insights gathered through semi-structured interviews with the maintenance team, enhancing the depth of our analysis. The case study, conducted in a fertilizer granulation plant, focused on a critical failure in the granulator pillow block bearing, providing a comprehensive perspective on the practical application of statistical reliability within total productive maintenance; and not presupposing statistical reliability is the solution over more effective methods for the case.

Findings

Our findings reveal that the integration of statistical reliability within the planned maintenance pillar significantly enhances predictive maintenance capabilities, leading to more accurate forecasts of equipment failure modes. The Weibull analysis of the granulator pillow block bearing indicated a mean time between failures of 191.3 days, providing support for optimizing maintenance schedules. Moreover, the qualitative insights from the maintenance team highlighted the operational benefits of our approach, such as improved resource allocation and the need for specialized training. These results demonstrate the practical impact of statistical reliability in preventing unplanned downtimes and informing strategic decisions in maintenance planning, thereby emphasizing the importance of your work in the field.

Originality/value

In terms of the originality and practicality of this study, we emphasize the significant findings that underscore the positive influence of using statistical reliability in conjunction with the planned maintenance pillar. This approach can be instrumental in designing and enhancing component preventive maintenance plans. Furthermore, it can effectively manage equipment failure modes and monitor their useful life, providing valuable insights for professionals in total productive maintenance.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 28 June 2024

Pradipta Patra and Unni Krishnan Dinesh Kumar

Opportunistic and delayed maintenances are increasingly becoming important strategies for sustainable maintenance practices since they increase the lifetime of complex systems…

Abstract

Purpose

Opportunistic and delayed maintenances are increasingly becoming important strategies for sustainable maintenance practices since they increase the lifetime of complex systems like aircrafts and heavy equipment. The objective of the current study is to quantify the optimal time window for adopting these strategies.

Design/methodology/approach

The current study considers the trade-offs between different costs involved in the opportunistic and delayed maintenances (of equipment) like the fixed cost of scheduled maintenances, the opportunistic rewards that may be earned and the cost of premature parts replacement. The probability of the opportunistic maintenance has been quantified under two different scenarios – Mission Reliability and Renewal Process. In the case of delayed maintenance, the cost of the delayed maintenance is also considered. The study uses optimization techniques to find the optimal maintenance time windows and also derive useful insights.

Findings

Apart from finding the optimal time window for the maintenance activities the study also shows that opportunistic maintenance is beneficial provided the opportunistic reward is significantly large; the cost of conducting scheduled maintenance in the pre-determined slot is significantly large. Similarly, the opportunistic maintenance may not be beneficial if the pre-mature equipment parts replacement cost is significantly high. The optimal opportunistic maintenance time is increasing function of Weibull failure rate parameter “beta” and decreasing function of Weibull failure rate parameter “theta.” In the case of optimal delayed maintenance time, these relationships reverse.

Originality/value

To the best of our knowledge, very few studies exist that have used mission reliability to study opportunistic maintenance or considered the different cost trade-offs comprehensively.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 19 December 2023

Zul-Atfi Ismail

Operation and maintenance (O&M) processes projects such as identification, assessment, planning and execution, embody a variety of standards such as technical (method of…

Abstract

Purpose

Operation and maintenance (O&M) processes projects such as identification, assessment, planning and execution, embody a variety of standards such as technical (method of statement), environmental, economic (campus development) and social (health and wellbeing). Because these standards have proven to be challenging to integrate, local governments are increasingly experimenting with social innovation (SI) as a bottom-up form of standard integration. This study aims to apply the concept of SI to the O&M processes of facilities management at polytechnics in Malaysia to identify problems with conventional working practices in this area and to recommend potential solutions.

Design/methodology/approach

The paper reviews evidence that conventional working methods generate significant problems related to paper-based forms, improper database management and flawed decision-making processes. Because of the lack knowledge about different ways of how standard integration is achieved, the comparison of three polytechnic institutions which are Rensselaer Polytechnic Institute (RPI) and Southern Polytechnic College of Engineering and Engineering Technology (SPCEET) in USA as well as Seberang Perai Polytechnic, Pulau Pinang (PSP) in Malaysia shares the ambition to realise standard integration of O&M through SI.

Findings

The findings reveal that SI leads to four ways of standard integration: computerised maintenance management system, online customer complaint, electronic form and relational database. Application of the concept of SI reveals the need for more sophisticated management solutions in the O&M processes of facilities management.

Originality/value

These standard integration arrangements unfortunately seem to mainly contribute to greater alignment between standard rather than true standard integration. The concept of SI will guide future improvements and developments in maintenance management systems to fulfil requirements in this area.

Details

Journal of Global Responsibility, vol. 15 no. 3
Type: Research Article
ISSN: 2041-2568

Keywords

Article
Publication date: 18 July 2024

Oyindamola Alalade, Jamiu A. Dauda, Saheed O. Ajayi, Abdullahi B. Saka and Stanley Njuangang

This study aims to examine facility management practices in the Nigerian healthcare sector, exploring approaches and identifying challenges facing effective healthcare facilities…

25

Abstract

Purpose

This study aims to examine facility management practices in the Nigerian healthcare sector, exploring approaches and identifying challenges facing effective healthcare facilities management. The purpose is to contribute to the development of a framework for enhancing healthcare facility management efficiency in Nigeria.

Design/methodology/approach

The study employs a sequential in-depth exploratory qualitative research approach. The data collection involved conducting semi-structured interviews with 15 facility managers from diverse healthcare organisations in Nigeria. The qualitative data collected were analysed using thematic analysis.

Findings

The study reveals scheduled, unscheduled and mixed approaches as the three facility management approaches used in Nigeria. It also substantiates the underdeveloped nature of facility management in Nigeria's healthcare sector, exacerbated by challenges such as socioeconomic, operational, technological and regulatory challenges.

Practical implications

The study uncovers systemic issues affecting have attainment of Sustainable Development Goal 3 (Good Health and Well-being) and advocates for a comprehensive approach to enhance healthcare infrastructure, contributing to improved health outcomes and sustainable development.

Originality/value

This research uniquely uncovers the hidden challenges facing effective healthcare facility management in Nigeria, providing a foundation for stakeholders to formulate solutions and rescue the struggling state of healthcare facilities in the country.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 21 May 2024

Adel Ali Ahmed Qaid, Rosmaini Ahmad, Shaliza Azreen Mustafa and Badiea Abdullah Mohammed

This study presents a systematic framework for maintenance strategy development of manufacturing process machinery. The framework is developed based on the reliability-centred…

Abstract

Purpose

This study presents a systematic framework for maintenance strategy development of manufacturing process machinery. The framework is developed based on the reliability-centred maintenance (RCM) approach to minimise the high downtime of a production line, thus increasing its reliability and availability. A case study of a production line from the ghee and soap manufacturing industry in Taiz, Yemen, is presented for framework validation purposes. The framework provides a systematic process to identify the critical system(s) and guide further investigation for functional significant items (FSIs) based on quantitative and qualitative analyses before recommending appropriate maintenance strategies and specific tasks.

Design/methodology/approach

The proposed framework integrates conventional RCM procedure with the fuzzy computational process to improve FSIs criticality estimation, which is the main part of failure mode effect criticality analysis (FMECA) applications. The framework consists of four main implementation stages: identification of the critical system(s), technical analysis, Fuzzy-FMECA application for FSIs criticality estimation and maintenance strategy selection. Each stage has its objective(s) and related scientific techniques that are applied to systematically guide the framework implementation.

Findings

The proposed framework validation is summarised as follows. The first stage results demonstrate that the seaming system (top and bottom systems) caused 50% of the total production line downtime, indicating it is a critical system that requires further analysis. The outcomes of the second stage provide significant technical information on the subject (seaming system), helping team members to identify and understand the structure and functional complexities of the seaming system. This stage also provides a better understanding of how the seaming system functions and how it can fail. In stage 3, the application of FMECA with the fuzzy computation integration process presents a systematic way to analyse the failure mode, effect and cause of items (components of the seaming system). This stage also includes items’ criticality estimation and ranking assessment. Finally, stage four guides team members in recommending the appropriate countermeasures (maintenance strategies and task selection) based on their priority level.

Originality/value

This paper proposes an original maintenance strategies development framework based on the RCM approach for production system equipment. Specifically, it considers a fuzzy computational process based on the Gaussian function in the third stage of the proposed framework. Adopting the fuzzy computational process improves the risk priority number (RPN) estimation, resulting in better criticality ranking determination. Another significant contribution is introducing an extended item criticality ranking assessment process to provide maximum levels of criticality item ranking. Finally, the proposed RCM framework also provides detailed guidance on maintenance strategy selection based on criticality levels, unique functionality and failure characteristics of each FSI.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 2
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 17 September 2024

Mahadev Laxman Naik and Milind Shrikant Kirkire

Asset maintenance in manufacturing industries is a critical issue as organizations are highly sensitive towards maximizing asset uptime. In the advent of Industry 4.0, maintenance…

Abstract

Purpose

Asset maintenance in manufacturing industries is a critical issue as organizations are highly sensitive towards maximizing asset uptime. In the advent of Industry 4.0, maintenance is increasingly becoming technology driven and is being termed as Maintenance 4.0. Several barriers impede the implementation of Maintenance 4.0. This article aims at - exploring the barriers to implementation of Maintenance 4.0 in manufacturing industries, categorizing them, analysing them to prioritize and suggesting the digital technologies to overcome them.

Design/methodology/approach

Twenty barriers to the implementation of Maintenance 4.0 were identified through literature survey and discussion with the industry experts. The identified barriers were divided into five categories based on their source of occurrence and prioritized using fuzzy-technique for order preference by similarity to ideal solution (TOPSIS), sensitivity analysis was carried out to check the robustness of the solution.

Findings

“Data security issues” has been ranked as the most influencing barrier towards the implementation of Maintenance 4.0, whereas “lack of skilled engineers and data scientists” is the least influencing barrier that impacts the implementation of Maintenance 4.0 in the manufacwturing industries.

Practical implications

The outcomes of this research will help manufacturing industries, maintenance engineers/managers, policymakers, and industry professionals for detailed understanding of barriers and identify easy pickings while implementing Maintenance 4.0.

Originality/value

Manufacturing industries are witnessing a paradigm shift due to digitization and maintenance 4.0 forms the cornerstone. Little research has been carried in Maintenance 4.0 and its implementation; this article will help in bridging the gap. The prioritization of the barriers and digital course of actions to overcome those is a unique contribution of this article.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 30 April 2024

Sophie van Roosmale, Amaryllis Audenaert and Jasmine Meysman

This paper aims to highlight the expanding link between facility management (FM) and building automation and control systems (BACS) through a review of literature. It examines the…

Abstract

Purpose

This paper aims to highlight the expanding link between facility management (FM) and building automation and control systems (BACS) through a review of literature. It examines the opportunities and challenges of BACS for facility managers and proposes solutions for mitigating the risks associated with BACS implementation.

Design/methodology/approach

This paper reviews various research papers to explore the positive influences of BACS on FM, such as support with strategic decision-making, predictive maintenance, energy efficiency and comfort improvement. It also discusses the challenges of BACS, including obsolescence, interoperability, vendor lock-in, reliability and security risks and suggests potential solutions based on existing literature.

Findings

BACS offers numerous opportunities for facility managers, such as improved decision-making, energy efficiency and comfort levels in office buildings. However, there are also risks associated with BACS implementation, including obsolescence, interoperability, vendor lock-in, reliability and security risks. These risks can be mitigated through measures such as hardware and software obsolescence management plans, functional requirement lists, wireless communication protocols, advanced feedback systems and increased awareness about BACS security.

Originality/value

To the best of the authors’ knowledge, no prior academic research has been conducted on the expanding link between FM and BACS. Although some papers have touched upon the opportunities and challenges of BACS for FM, this paper aims to provide a comprehensive overview of these findings by consolidating existing literature.

Details

Facilities , vol. 42 no. 7/8
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 23 January 2024

Chinedu Onyeme and Kapila Liyanage

This study investigates the integration of Industry 4.0 (I4.0) technologies with condition-based maintenance (CBM) in upstream oil and gas (O&G) operations, focussing on…

133

Abstract

Purpose

This study investigates the integration of Industry 4.0 (I4.0) technologies with condition-based maintenance (CBM) in upstream oil and gas (O&G) operations, focussing on developing countries like Nigeria. The research identifies barriers to this integration and suggests solutions, intending to provide practical insights for improving operational efficiency in the O&G sector.

Design/methodology/approach

The study commenced with an exhaustive review of extant literature to identify existing barriers to I4.0 implementation and contextualise the study. Subsequent to this foundational step, primary data are gathered through the administration of carefully constructed questionnaires targeted at professionals specialised in maintenance within the upstream O&G sector. A semi-structured interview was also conducted to elicit more nuanced, contextual insights from these professionals. Analytically, the collected data were subjected to descriptive statistical methods for summarisation and interpretation with a measurement model to define the relationships between observed variables and latent construct. Moreover, the Relative Importance Index was utilised to systematically prioritise and rank the key barriers to I4.0 integration to CBM within the upstream O&G upstream sector.

Findings

The most ranked obstacles in integrating I4.0 technologies to the CBM strategy in the O&G industry are lack of budget and finance, limited engineering and technological resources, lack of support from executives and leaders of the organisations and lack of competence. Even though the journey of digitalisation has commenced in the O&G industry, there are limited studies in this area.

Originality/value

The study serves as both an academic cornerstone and a practical guide for the operational integration of I4.0 technologies within Nigeria's O&G upstream sector. Specifically, it provides an exhaustive analysis of the obstacles impeding effective incorporation into CBM practices. Additionally, the study contributes actionable insights for industry stakeholders to enhance overall performance and achieve key performance indices (KPIs).

Details

International Journal of Quality & Reliability Management, vol. 41 no. 6
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 3 April 2024

Chao-chao Liu, Miao Wang, Zhanwen Niu and Xun Mo

The view that dynamic capabilities theory can help explain how lean organizations improve has been put forward by scholars. However, there is still a lack of research on the…

Abstract

Purpose

The view that dynamic capabilities theory can help explain how lean organizations improve has been put forward by scholars. However, there is still a lack of research on the matching relationship between the application of lean practice and the internal elements of enterprise organization from the perspective of dynamic capabilities. The purpose of this study is to validate the moderating effect of dynamic capabilities on the relationship between lean practices and operational performance.

Design/methodology/approach

This study used the method of survey and empirical research to collect sample data from 263 enterprises in China. Through literature review, this study put forward the moderating hypotheses around dynamic capabilities, lean practices and operation performance and used the method of regression analysis to validate these hypotheses.

Findings

The results showed that dynamic capabilities have a partially moderating effect on the application of lean practices. Specifically, dynamic capabilities have a significant moderating effect on the relationship between just-in-time, total quality management, total preventive maintenance and operational performance, while dynamic capabilities have no significant moderating effect on the relationship between human resource management and operational performance.

Originality/value

The research conclusion complements and enriches the lean practices literature from the perspective of dynamic capabilities. Existing studies mainly focus on the moderating role of external environmental factors, while there is a lack of empirical research on the role of dynamic capabilities in lean practices literature. The research results will help enterprises further understand the matching relationship between lean practices and dynamic capabilities and then improve the success of lean practices application.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 8 July 2024

Abubakar Sadiq Mohammed, William Mark Adolwine (ESQ.) and Iddrisu Danlard

To analyze the challenges and intricacies involved in managing the physical and administrative aspects of central mosques, with a specific focus on the Kumasi Central Mosque in…

Abstract

Purpose

To analyze the challenges and intricacies involved in managing the physical and administrative aspects of central mosques, with a specific focus on the Kumasi Central Mosque in Ghana. Through this case study, the paper aims to provide insights into the unique estate management practices and design a conceptual framework that incorporates efficient estate management practices for Ghana’s central mosques.

Design/methodology/approach

The study adopted a mixed-methods approach. Structured questionnaires were used to gather the data administered to the head of the development office, maintenance workers and mosque users. The data were analyzed using descriptive methods.

Findings

The overall findings of the study indicate that the estate management practices of the mosque are having difficulties financing maintenance. Other difficulties include the type of maintenance regime, the period of planned maintenance, the lack of an asset register, the absence of insurance policies and the causes of emergency maintenance.

Practical implications

The research provides valuable insights into the management of central mosques in Ghana and offers scalable practical recommendations such as adopting a planned maintenance regime, insuring mosque facilities and implementing comprehensive recording-keeping guidelines guided by policies.

Originality/value

The paper will assist stakeholders in comprehending the most practical approach to mosque estate management practices.

Details

Facilities , vol. 42 no. 9/10
Type: Research Article
ISSN: 0263-2772

Keywords

1 – 10 of 423