Search results

1 – 10 of 459
Article
Publication date: 3 October 2022

Chunhao Li, Yuping Zhao and Wei Feng Chen

This study aims to investigate the dual effects of commitment-based governance on the relationship between formal control and public–private partnership (PPP) project performance…

Abstract

Purpose

This study aims to investigate the dual effects of commitment-based governance on the relationship between formal control and public–private partnership (PPP) project performance. Formal control and relationship governance are two primary forms of inter-organizational governance that affect project performance. However, little is known about the interplay between formal control and commitment and its effect on PPP projects. More specifically, previous studies have failed to distinguish the function routes of relationship governance resulting from different types of formal control (process and outcome control).

Design/methodology/approach

This study adopts a questionnaire survey to empirically investigate the mechanism that commitment-based governance influences the relationship between formal control and PPP performance. After collecting data from public and private sector professionals involved in 101 Chinese PPP projects, the theoretical framework proposed in this paper is verified by the empirical results of the hierarchical multiple regression analysis.

Findings

The results show that process control has an inverted U-shaped effect and outcome control has a significant positive influence on PPP project performance. Furthermore, commitment moderates the effect of formal control on PPP project performance by increasing the relevance of outcome control and mediates the inverted U-shaped relationship between process control and PPP project performance.

Practical implications

Managers should recognize that process control is a double-edged sword and prevent the overuse of process control. Managers should direct their attention toward efforts to improve the commitment, which allows for the effectiveness of outcome control strategies. Additionally, this study new measurement method for relationship governance suggests that managers should be aware of the difference in parties' perceptions of the relationship.

Originality/value

This study allows for a comprehensive understanding of the relationship governance-control nexus from a commitment perspective. The authors bring into light the dual role of commitment-based governance in the relationship between the two types of formal control and PPP project performance. Moreover, the new approach to measure relationship governance offers valuable insight into the measurement of variables about individual's perception.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 August 2022

Bo Tian, Jiaxin Fu, Yongshun Xu and Longshan Sun

The risks and uncertainties of public–private partnership (PPP) projects threaten their sustainability. Contract flexibility, which is based on the theory of incomplete contract…

Abstract

Purpose

The risks and uncertainties of public–private partnership (PPP) projects threaten their sustainability. Contract flexibility, which is based on the theory of incomplete contract and transaction cost, may be a viable solution to this issue. The purpose of this study is to investigate the relationship between contract flexibility and the sustainability performance of PPP projects. The multiple mediating roles of justice perception and cooperation efficiency are assessed, thereby allowing the pathways and conditions to be understood more comprehensively for improving the sustainability performance of PPP projects.

Design/methodology/approach

Nine hypotheses in the proposed research model are tested via structural equation modeling using data acquired from 218 Chinese PPP professionals.

Findings

Results show that contract flexibility positively affects PPP project sustainability performance. Justice perception and cooperation efficiency play direct and sequential mediating roles in this effect.

Originality/value

This study validates that contract flexibility positively impacts the sustainability performance of PPP projects, where justice perception and cooperation efficiency serve direct and sequential mediating roles. The findings of this study contribute to an improved understanding of the effect of contract flexibility on the sustainability performance of PPP projects. Furthermore, they provide important theoretical and practical insights into contract management as well as beneficial information and valuable initiatives for improving the sustainability of PPP projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 September 2022

Ali Mohammad Mirzaee, Towhid Pourrostam, Javad Majrouhi Sardroud, M. Reza Hosseini, Payam Rahnamayiezekavat and David Edwards

Public–private partnerships (PPPs) are notoriously prone to disputes among stakeholders, some of which may unduly jeopardize contract performance. Contract disputes arising in…

Abstract

Purpose

Public–private partnerships (PPPs) are notoriously prone to disputes among stakeholders, some of which may unduly jeopardize contract performance. Contract disputes arising in Iran are often due to inefficiency of PPP concession agreements and practice. This study presents a causal-predictive model of the root causes and preventive measures for inter-organization disputes to enhance the likelihood of achieving desirable performance in PPP projects.

Design/methodology/approach

A theoretical “causal-predictive” model was developed with fourteen hypotheses based on extant literature and contractual agency theory, which resulted in the creation of a pool of 110 published items. Data were obtained from a questionnaire survey with 75 valid responses, completed by 4 stratified groups of Iranian PPP experts. Partial least square structural equation modeling (PLS-SEM) was used for validating the proposed model via a case study.

Findings

Results reveal that the main three factors of PPP desirable performance are as follows: on-time project completion, high quality of activities/products and services for public satisfaction. Further, the most influential factors of the lifecycle problems, construction stage, and preferred risk allocation included risk misallocation, improper payment mechanism and failure to facilitate a timely approval process.

Originality/value

For researchers, the findings contribute to the theory of contractual agency; specifically, how different influences among the model's elements lead to better PPP performance. In practical terms, proposed outcome-based strategies will inform PPP stakeholders to avoid dispute occurrence and thus improve the time, quality and services of projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 May 2023

Xuewei Li, Jingfeng Yuan, Xuan Liu, Guangqi Wang and Qian-Cheng Wang

With the continuous improvement of public–private partnership (PPP) projects, the participants' value creation goals are not only limited to achieving the basic performance…

Abstract

Purpose

With the continuous improvement of public–private partnership (PPP) projects, the participants' value creation goals are not only limited to achieving the basic performance objectives but also to realising value added. However, the effect of traditional contract management on realising the value creation objectives of PPP projects is limited. According to the view of multifunctional contract, joint-contract functions that integrate contract control and flexibility are likely to be effective in enhancing the value creation of PPP projects. This study aims to explore the effects of joint-contract functions on PPP project value creation and relevant influencing mechanism by investigating the mediating effect of in-role behaviour and extra-role behaviour.

Design/methodology/approach

After collecting 258 valid questionnaires from PPP professionals in China, this study used structural equation modelling to validate the hypotheses.

Findings

Contract control and flexibility can improve PPP project value creation. Specifically, contract control improves the achievement of the basic contract objectives of PPP projects, whereas contract flexibility enhances the achievement of the value-added of PPP projects. Moreover, only in-role behaviour mediates the effect of contract control on value creation. In addition, the mediating effect of extra-role behaviour on the impact of contract flexibility on value creation is stronger than that of in-role behaviour. The mediating effect of in- and extra-role behaviour is mainly reflected in the realisation of basic and value-added performance, respectively.

Research implications

The findings of this study can help realise value creation in three ways. Firstly, new perspectives for PPP project value creation should be proposed by combining the improvement of contract objectives and the realisation of the participants' implicit demands. Secondly, the effects of different contract functions on value creation should be analysed instead of a single dimension of contractual governance. Thirdly, the mediating effects of different types of cooperation behaviour that may influence the relationship between contractual governance and value creation should be evaluated.

Originality/value

This study verifies the impacts of different contract functions on PPP project value creation. In addition, cooperative behaviour is embedded as a mediating variable, and the mediated transmission path from contract function to cooperative behaviour and further to PPP project value creation is systematically analysed.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 December 2023

Mojahedul Islam Nayyer and Thillai Rajan Annamalai

Public-private partnership (PPP) highway projects in India are undertaken at both state and national levels, such that differences exist in how the procuring authorities manage…

Abstract

Purpose

Public-private partnership (PPP) highway projects in India are undertaken at both state and national levels, such that differences exist in how the procuring authorities manage project risk during the development and construction phase under different institutional frameworks. This study assesses the performance implication of the different administrative positionings of the procuring authority.

Design/methodology/approach

A data set of 516 PPP highway projects implemented in India formed the basis of this study. Means comparison, ordinary least squares (OLS) regression and seemingly unrelated regression were used to assess the impact of procuring authority on schedule performance.

Findings

The findings suggest that the state and the national highway projects were no different in achieving financial closure. However, the administrative positioning of the procuring authorities had a significant impact on other schedule performance variables. The construction of the state highway projects started quickly after the financial closure compared to the national highway projects. Moreover, the state highway projects were not only planned to be implemented at a faster rate but they were actually implemented at a faster rate and had a lower time overrun.

Practical implications

Procuring authorities under the state governments, being closer to the project, are better placed to manage project risk than those under the national government.

Originality/value

The administrative distance of the procuring authority from the PPP project and its implication on performance has never been studied.

Details

Built Environment Project and Asset Management, vol. 14 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 14 March 2023

Rafedzah Mohd Som, Ismi Arif Ismail, Zoharah Omar, Siti Noormi Alias and Soaib Asimiran

This study aims to test a public–private partnership (PPP) success model by examining the direct effects of two input factors (facilitative leadership and communication quality…

437

Abstract

Purpose

This study aims to test a public–private partnership (PPP) success model by examining the direct effects of two input factors (facilitative leadership and communication quality) on an outcome factor, namely, PPP success (PPP project success and PPP relational success), as well as the mediating effect of trust as a process factor on these relationships.

Design/methodology/approach

The present research uses the sociotechnical systems theory as the guiding framework. This is a quantitative study that uses a questionnaire survey and purposive sampling. The respondents comprise 266 public and private sector employees who have been involved in various PPP projects. The data gathered from the survey are analysed using SPSS and structural equation modelling (AMOS version 23.0).

Findings

The findings of this study indicate that facilitative leadership, communication quality and trust are positively correlated with PPP success, that is, PPP relational and PPP project success. Trust is found to mediate the relationship between facilitative leadership and communication quality with PPP success.

Practical implications

This paper upholds the importance of facilitative leadership, communication quality and trust in a PPP setting.

Originality/value

This study enriches the knowledge of PPP projects regarding facilitative leadership, communication quality and trust. It also discusses the vital role of these variables in ensuring PPP success.

Details

Journal of Asia Business Studies, vol. 17 no. 5
Type: Research Article
ISSN: 1558-7894

Keywords

Article
Publication date: 28 June 2022

Robert Osei-Kyei, Timur Narbaev, Michael Atafo-Adabre, Nicholas Chileshe and Joseph Kwame Ofori-Kuragu

The demand for retirement villages globally has been increasing due to the rapid growth in the ageing population in recent years. To address the rising challenges in the…

Abstract

Purpose

The demand for retirement villages globally has been increasing due to the rapid growth in the ageing population in recent years. To address the rising challenges in the retirement market, the public–private partnership (PPP) has become a feasible method to develop retirement villages. This paper aims to survey and examine the key success criteria (SC) for using the PPP approach in the retirement village sector.

Design/methodology/approach

An empirical questionnaire survey was conducted with experts experienced in international PPP and retirement village. The analysis was conducted using one-way analysis of variance, mean score analysis, Kendall’s coefficient of concordance and factor analysis.

Findings

Results indicate that out of the 16 recognized SC, the most significant ones are SC1: “Affordability”, SC11: “Reduced social isolation of residents” and SC14: “Improvement of emotional wellbeing of residents”. Furthermore, results from the factor analysis technique indicate that the 16 SC can be classified into five major factor groupings, and these include SCG1 – “Financial performance of project”; SCG2 – “Adherence to design and technical specifications”; SCG3 – “Adherence to local council/authority’s environmental health and socio-economic requirements”; SCG4 – “Social inclusion and risk management”; and SCG5 – “Advancement in emotional wellbeing and physical health of residents”.

Originality/value

The study will sufficiently assist retirement village stakeholders, retirement village project participants and related government authorities of the best measures to put in place to maintain the sustainable development of the global retirement village market.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 November 2022

Jiaqi Liu and Jicai Liu

This paper aims to determine the demand category and level of government and investors in public–private partnership (PPP) projects. It emphasizes the importance of meeting the…

Abstract

Purpose

This paper aims to determine the demand category and level of government and investors in public–private partnership (PPP) projects. It emphasizes the importance of meeting the demands of stakeholders and controlling the unreasonable demands. This study aims to improve the demand management of stakeholders in the PPP project and lay a foundation for the research on behavior based on the motivation theory.

Design/methodology/approach

This paper opted for a questionnaire survey to collect data based on indicators identified through literature. The participants come from the government and private sector (investors, contractors, operators, etc.) in China PPP Lecture Hall. The reliability, validity and variance analyses are used to test the reliability of data. Factor analysis and entropy method are used to determine demand categories and weights.

Findings

The government’s 14 demands are divided into four groups: satisfy public activities, self-interest, responsibility and relief financial pressure; 6 investor's demands are divided into development ability and satisfy social activities. The self-interest of government is higher than that of the publicity in PPP projects; investor's social reputation is most important, it is a foundation for obtaining external resources and achieving enterprise development.

Research limitations/implications

Because of the chosen research approach, the demand indexes cannot be exhausted. Therefore, researchers are encouraged to enrich relevant contents further.

Practical implications

This paper includes implications for a targeted demand control mechanism and for managing the unreasonable demand.

Originality/value

This paper comprehensively identifies the demand hierarchy of the government and investors, and provides the theoretical basis for the target management of stakeholders.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 October 2022

Limin Su, YongChao Cao, Huimin Li and Chengyi Zhang

The optimal payment in the whole operation and maintenance period of water environment treatment PPP projects has become the main approach to realize sustainable development of…

Abstract

Purpose

The optimal payment in the whole operation and maintenance period of water environment treatment PPP projects has become the main approach to realize sustainable development of projects. This study is aimed at constructing an effective payment model for the whole life period of projects to achieve win-win among all stakeholders, so as to provide a theoretical reference and managerial implications for the public sector in the whole operation and maintenance period.

Design/methodology/approach

In the whole operation and maintenance period of water environment treatment PPP projects, this article investigates how the public sector optimizes the payment in the whole operation and maintenance period of projects. Firstly, the projects' whole operation and maintenance period is divided into several stages according to the performance appraisal period. And then, the multi-stage dynamic programming model is constructed to design the payment construct model for the public sector in each performance appraisal stage. The payment from the public sector is the decision variable, and the deduction from the private sector is a random variable.

Findings

The optimal payment model showed that the relatively less objective weight of public sector leaded to its relatively more total payment and vice versa. Therefore, the sustainable development of the projects can only be ensured when the objective weights both of them should be balanced. Additionally, the deduction from the performance appraisal of private sector plays an important role in the model construction. The larger deduction the private sector undertakes, the smaller profits private sector has. Since the deduction at each stage is a random variable, the deduction varies with the different probability distributions obeyed by the practical deduction in each stage.

Research limitations/implications

The findings from this study have provided theoretical and application references, and some managerial implications are also given. First, the improvement of the pricing system of public sector should be accelerated. Second, the reasonable profit of the private sector must be guaranteed. While pursuing the maximization of social benefits, the public sector should make full use of the price sharing mechanism in the market and supervise the real income situation of the private sector. Third is increasing the public to participate in pricing. Additionally, it is a limitation that the deduction is assumed to conform to a uniform distribution in this study. Other probability distributions on deduction can be essentially further sought, so as to be more line with the actual situation of the projects.

Originality/value

The optimal payment in whole operation and maintenance period of the projects has become an important issue, which is a key to project success. This study constructs a multi-stage dynamic programming model to optimize payment in the whole period of projects. Additionally, this study adds its value through deeply developing the new theories of optimal payment to more suitable for the practical problems, so that to optimize the design of payment mechanism. Meanwhile, a valuable reference for public and private sectors is provided to ensure the sustainable development of the projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 September 2022

Siavash Ghorbany, Saied Yousefi and Esmatullah Noorzai

Being an efficient mechanism for the value of money, public–private partnership (PPP) is one of the most prominent approaches for infrastructure construction. Hence, many…

334

Abstract

Purpose

Being an efficient mechanism for the value of money, public–private partnership (PPP) is one of the most prominent approaches for infrastructure construction. Hence, many controversies about the performance effectiveness of these delivery systems have been debated. This research aims to develop a novel performance management perspective by revealing the causal effect of key performance indicators (KPIs) on PPP infrastructures.

Design/methodology/approach

The literature review was used in this study to extract the PPPs KPIs. Experts’ judgment and interviews, as well as questionnaires, were designed to obtain data. Copula Bayesian network (CBN) has been selected to achieve the research purpose. CBN is one of the most potent tools in statistics for analyzing the causal relationship of different elements and considering their quantitive impact on each other. By utilizing this technique and using Python as one of the best programming languages, this research used machine learning methods, SHAP and XGBoost, to optimize the network.

Findings

The sensitivity analysis of the KPIs verified the causation importance in PPPs performance management. This study determined the causal structure of KPIs in PPP projects, assessed each indicator’s priority to performance, and found 7 of them as a critical cluster to optimize the network. These KPIs include innovation for financing, feasibility study, macro-environment impact, appropriate financing option, risk identification, allocation, sharing, and transfer, finance infrastructure, and compliance with the legal and regulatory framework.

Practical implications

Identifying the most scenic indicators helps the private sector to allocate the limited resources more rationally and concentrate on the most influential parts of the project. It also provides the KPIs’ critical cluster that should be controlled and monitored closely by PPP project managers. Additionally, the public sector can evaluate the performance of the private sector more accurately. Finally, this research provides a comprehensive causal insight into the PPPs’ performance management that can be used to develop management systems in future research.

Originality/value

For the first time, this research proposes a model to determine the causal structure of KPIs in PPPs and indicate the importance of this insight. The developed innovative model identifies the KPIs’ behavior and takes a non-linear approach based on CBN and machine learning methods while providing valuable information for construction and performance managers to allocate resources more efficiently.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 459