1 – 10 of 221
Open Access
Article
Publication date: 25 October 2021

Yaser Gamil and Ismail Abd Rahman

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in…

14527

Abstract

Purpose

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in construction projects using Smart-PLS.

Design/methodology/approach

The first method of this research is to identify the causes and effects factors of poor communication in construction projects from the extant of literature. The data used to develop the model was collected using a questionnaire survey, which targeted construction practitioners in the Malaysian construction industry. A five-point Likert type scale was used to rate the significance of the factors. The factors were classified under their relevant construct/group using exploratory factor analysis. A hypothetical model was developed and then transformed into Smart-PLS in which the hypothetical model suggested that each group of the cause factors has a direct impact on the effect groups. The hypothesis was tested using t-values and p-values. The model was assessed for its inner and outer components and achieved the threshold criterion. Further, the model was verified by engaging 14 construction experts to verify its applicability in the construction project setting.

Findings

The study developed a structural equation model to clarify the relationships between causes and effects of poor communication in construction projects. The model explained the degree of relationships among causes and effects of poor communication in construction projects.

Originality/value

The published academic and non-academic literature introduced many studies on the issue of communication including the definitions, importance, barriers to effective communication and means of poor communication. However, these studies ended up only on the general issue of communication lacking an in-depth investigation of the causes and effects of poor communication in the construction industry. The study implemented advanced structural modeling to study the causes and effects. The questionnaire, the data and concluding results fill the identified research gap of this study. The addressed issue is also of interest because communication is considered one of the main knowledge areas in construction management.

Details

Journal of Facilities Management , vol. 21 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Content available
Article
Publication date: 1 July 2006

68

Abstract

Details

Aircraft Engineering and Aerospace Technology, vol. 78 no. 4
Type: Research Article
ISSN: 0002-2667

Keywords

Content available
Article
Publication date: 11 September 2007

116

Abstract

Details

Aircraft Engineering and Aerospace Technology, vol. 79 no. 5
Type: Research Article
ISSN: 0002-2667

Content available
Article
Publication date: 5 September 2008

126

Abstract

Details

Aircraft Engineering and Aerospace Technology, vol. 80 no. 5
Type: Research Article
ISSN: 0002-2667

Content available
Article
Publication date: 1 February 2004

145

Abstract

Details

Aircraft Engineering and Aerospace Technology, vol. 76 no. 1
Type: Research Article
ISSN: 0002-2667

Keywords

Open Access
Article
Publication date: 5 March 2018

Gro Holst Volden and Bjorn Andersen

The purpose of this paper is to study public project governance frameworks in various ministries and agencies in Norway, following the introduction of such a framework on the…

7115

Abstract

Purpose

The purpose of this paper is to study public project governance frameworks in various ministries and agencies in Norway, following the introduction of such a framework on the topmost level (i.e. the cabinet) which applies to the very largest projects.

Design/methodology/approach

The study is methodologically designed as a qualitative assessment of project governance frameworks that apply to state-funded investment projects in selected sectors, based on data gathered through document reviews and interviews.

Findings

The study finds that all of the agencies have introduced their own project governance frameworks, which are basically consistent with the recommendations from the project management literature and with the cabinet’s overall requirements in Norway. By contrast, only one ministry has taken a formalized role as a project owner. Governance tasks thus seem to be extensively delegated to the subordinate agencies. This even includes strategic tasks such as project selection and portfolio management, and implies there is a risk that public project governance has a narrow and internal focus.

Originality/value

The paper is a first step toward a better understanding of public project governance as a hierarchical system and the relationship between project owners on three levels, the cabinet, the sectoral ministry, and the government agency.

Details

International Journal of Managing Projects in Business, vol. 11 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 19 April 2024

Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…

Abstract

Purpose

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.

Design/methodology/approach

The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.

Findings

The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.

Practical implications

The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.

Originality/value

This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.

Details

LBS Journal of Management & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-8031

Keywords

Open Access
Article
Publication date: 8 November 2022

Inimbom Walter Isang and David Ojimaojo Ebiloma

Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction…

2923

Abstract

Purpose

Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction sector. By integrating the principle of sustainable construction, it can minimise the environmental and socio-economic impact of Covid-19. This research therefore aims at developing strategies to achieve sustainable project performance in the post-Covid era in Nigeria.

Design/methodology/approach

A qualitative research method was used. Data was collected from 13 stakeholders in the built environment. Percentages and thematic analysis were used to analyse data from the interviews.

Findings

The study reveals that stakeholders are encountering operational and financial challenges: Increased price of materials, labour and material shortage and project delays were key operational challenges. The financial challenges were related to increased construction cost, reduced profit and payment delays. To address these challenges, the study developed managerial, contractual and governmental strategies: Market survey and bulk purchase, remote working and adherence to Covid-19 protocols were among the key managerial strategies. For the contractual strategies: contracts reviews, smart contracts, working overtime and night shift were developed, while governmental strategies included provision of funds, loans and incentives for workers.

Originality/value

The study deduced that while environmental sustainability was employed to address the Covid-19 challenges, the economic and social aspects were found to be under-utilized. Therefore, the study concluded that a holistic application of environmental, economic and social sustainability themes while incorporating managerial, contractual and governmental strategies is significant for achieving sustainable project performance in the post-Covid era in Nigeria.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 13 May 2022

Saleh Alsulamy

The purpose of this research is to identify the constraints and restrictions and their impact on the construction projects in Saudi Arabia from three key participants'…

2981

Abstract

Purpose

The purpose of this research is to identify the constraints and restrictions and their impact on the construction projects in Saudi Arabia from three key participants' perspectives for the planning stage.

Design/methodology/approach

Using a descriptive-analytical approach, this research described and analyzed the frequency and severity of failure factors in construction projects in the planning stage using a five-Likert scale questionnaire in Saudi Arabia construction between 2019 and 2020. A total of 100 experts from contractors, consultants and owners were included in the study.

Findings

The findings have shown that time dispute was the major factor affecting the projects to be failed. Similarly, cost overrun and total abandonment have an impact on project failures. The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries.

Research limitations/implications

Further research is needed to investigate the relationship between failure characteristics and project success measures in the same stage, in addition to, factors of failure for construction projects' life-cycle stages.

Originality/value

The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries.

Details

Frontiers in Engineering and Built Environment, vol. 2 no. 3
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 16 November 2015

Pablo Ballesteros-Pérez, Maria Luisa del Campo-Hitschfeld, Manuel Alejandro González-Naranjo and Mari Carmen González-Cruz

Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The…

10140

Abstract

Purpose

Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The purpose of this paper is to analyze the influence of climate on standard construction work activities through a case study.

Design/methodology/approach

By studying the extent at which some weather variables impede outdoor work from being effectively executed, new maps and tables for planning for delays are presented. In addition, a real case regarding the construction of several bridges in southern Chile is analyzed.

Findings

Few studies have thoroughly addressed the influences of major climatic agents on the most common outdoor construction activities. The method detailed here provides a first approximation for construction planners to assess to what extent construction productivity will be influenced by the climate.

Research limitations/implications

Although this study was performed in Chile, the simplified method proposed is entirely transferable to any other country, however, other weather or combinations of weather variables could be needed in other environments or countries.

Practical implications

The implications will help reducing the negative social, economic and environmental outcomes that usually emerge from project delays.

Originality/value

Climatic data were processed using extremely simple calculations to create a series of quantitative maps and tables that would be useful for any construction planner to decide the best moment of the year to start a project and, if possible, where to build it.

Details

Engineering, Construction and Architectural Management, vol. 22 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords