Article
Publication date: 29 September 2022

Najib AL-Fadhali

Construction project stakeholders can have a major effect on delivering projects on time. However, little attempt has been made to address the influence of internal stakeholders…

Abstract

Purpose

Construction project stakeholders can have a major effect on delivering projects on time. However, little attempt has been made to address the influence of internal stakeholders on delaying project delivery. This research aims to propose the internal stakeholders' influence as a solution to improving project delivery performance (PDP) in order to boost the value of investment in the construction industry's projects.

Design/methodology/approach

In Yemen, a structured questionnaire was distributed to owners, consultants and contractors, 283 of which were found usable after the data screening. A purposeful sampling technique was used and structural equation modelling (SEM) was adopted for analysis. The structural model was drawn up, based on seven categories of influencing factors: labour, supplier, designer, contractor, consultant, sub-contractor and owner.

Findings

The results of the structural model suggest that of these seven categories, designers, owners, suppliers and subcontractors have a significant p-value and impact on PDP, while the labour and consultant's impact was not substantiated. The findings support the proposal that internal stakeholders' influence contributes directly to construction PDP.

Originality/value

The influence of stakeholders on PDP is important. Nonetheless, few studies have focussed on their effectiveness, especially in developing countries. This paper's contribution is evaluating the cause–effect relationship between stakeholders' influence and construction PDP through analysis of moment structures (AMOS) analysis. The policy implications of the research are to encourage governments in general and construction companies in particular to take responsibility for improving PDP, as slow execution of construction projects leads to increased costs, failure and abandoning projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 September 2019

Najib Al-Fadhali, Dodo Mansir and Rozlin Zainal

Influential factors attributed to causing project completion delay (PCD) differ because of prevailing variability of local conditions. Construction projects specifically in Yemen…

Abstract

Purpose

Influential factors attributed to causing project completion delay (PCD) differ because of prevailing variability of local conditions. Construction projects specifically in Yemen (and other developing countries) experience devastating effects of PCD which include litigation, cost overrun, arbitration, abandonment and failure. While existing works have investigated the causes and effects of PCD, not much exist on approaches to optimizing its occurrence in Yemen. In a bid to enhance the effects of PCD in Yemen, the integrated influential factors (IIFs), which is a construction-party specific model, was developed to mitigate the effects of PCD in Yemen. As a build up to the development of this model, this paper aims to validate the IIFs model with a view to foster its application to enhance PCD in construction project delivery in Yemen.

Design/methodology/approach

The validation of the IIFs model was done through seeking the opinions of 12 selected construction industry experts. This involved using a structured questionnaire to seek information on the sustainability of implementing the IIFs model.

Findings

The findings revealed that if the IIFs model is vigorously implemented, it would go a long way in curbing delay in the delivery of construction projects, making construction delivery less risky due to the effects of delay.

Research limitations/implications

The study is limited to only influential factors of internal stakeholders of the construction phase. Similarly, the study was only conducted in the state of Sana'a, Yemen. The implication of the adoption of the IIFs model is that it can hopefully serve as an adaptive controller to construction project delivery relative to the specific parameters and factors investigated in this study.

Originality/value

The IIFs model is a novel approach to optimizing PCD in Yemen specific to both the construction-phase and internal stakeholders. Existing studies on PCD in Yemen, although investigating the causes and effect of PCD, hardly proffer any approach to optimizing PCD for successful construction project delivery.

Details

Journal of Science and Technology Policy Management, vol. 10 no. 3
Type: Research Article
ISSN: 2053-4620

Keywords

Article
Publication date: 21 October 2021

Ali Hauashdh, Junaidah Jailani, Ismail Abdul Rahman and Najib Al-Fadhali

The largest share of a building maintenance budget goes towards preventing or repairing building defects. Also, building defects shorten a building’s lifetime, impact the user’s…

1031

Abstract

Purpose

The largest share of a building maintenance budget goes towards preventing or repairing building defects. Also, building defects shorten a building’s lifetime, impact the user’s safety and health, prevent the buildings from performing their functions well and repairing building defects generates waste. Therefore, this study aims to specify the factors that affecting the number of building defects and how to reduce their negative impacts.

Design/methodology/approach

A case study was used as a research strategy and convergent parallel mixed methods were used as research design. Quantitative and qualitative data were collected concurrently, followed by independent analyses of the quantitative and qualitative data, and then merged the two sets of results according to the procedure of using the convergent parallel design. Descriptive statistics analysed quantitative data, whilst qualitative data was analysed by the content analysis technique.

Findings

The findings of this study explored the factors that affect the number of defects in buildings, the significant factors were related to the building’s life cycle in terms of design, construction, operation and maintenance phase; relevant attributes were construction teams, building users and maintenance teams. The study also addressed the approaches to minimise the negative impacts of those factors. Their negative impacts mainly contributed to increased building defects that increase maintenance costs, affect users’ safety and health, reduce buildings’ lifespan and cause environmental impact due to resource extraction.

Originality/value

The existing studies have not adequately addressed the significant factors that affect the number of building defects. Also, emerging technologies and environmental sustainability considerations related to building defects have not been linked in previous related work. Therefore, the present study has contributed to filling this gap.

Article
Publication date: 8 July 2020

Ali Hauashdh, Junaidah Jailani, Ismail Abdul Rahman and Najib AL-fadhali

In recent years, there have been many concerns about issues surrounding building maintenance, which are continually increasing. However, there is a lack of comprehensive studies…

3090

Abstract

Purpose

In recent years, there have been many concerns about issues surrounding building maintenance, which are continually increasing. However, there is a lack of comprehensive studies on building maintenance issues, their effects and the way forward. Therefore, the purpose of this paper is to carry out a comprehensive review of building maintenance issues, their effects and the way forward. It also aims to develop a conceptual model that can support future research.

Design/methodology/approach

A systematic review of the literature published from 2009 to 2019 was carried out. Five relevant databases were searched, based on this study's search terms, and a narrative synthesis of the results from the included studies was carried out. Studies were eligible for inclusion if they fulfilled the inclusion criteria of this systematic review.

Findings

This study has identified and classified building maintenance issues, their effects and the way forward, and also developed a conceptual model that demonstrates the association between issues, their effects and the way forward. The way forward of the conceptual model focuses on effective management, technical capability, development of human resources and cost optimisation.

Originality/value

This paper addresses an important topic: the aspect in which it differs from existing studies is that, in the latter, the researchers studied a single sub-issue, whereas this systematic review includes a comprehensive study of building maintenance issues. Furthermore, this review has demonstrated how the way forward can moderate issues and their effects.

Details

International Journal of Building Pathology and Adaptation, vol. 38 no. 5
Type: Research Article
ISSN: 2398-4708

Keywords

1 – 4 of 4