Search results
1 – 10 of 273Jennifer Bray, Dawn Brooker, Isabelle Latham and Darrin Baines
The purpose of this paper is to populate a theoretical cost model with real-world data, calculating staffing, resource and consumable costs of delivering Namaste Care Intervention…
Abstract
Purpose
The purpose of this paper is to populate a theoretical cost model with real-world data, calculating staffing, resource and consumable costs of delivering Namaste Care Intervention UK (NCI-UK) sessions versus “usual care” for care home residents with advanced dementia.
Design/methodology/approach
Data from five care homes delivering NCI-UK sessions populated the cost model to generate session- and resident-level costs. Comparator usual care costs were calculated based on expert opinion and observational data. Outcome data for residents assessed the impact of NCI-UK sessions and aligned with the resident-level costs of NCI-UK.
Findings
NCI-UK had a positive impact on residents’ physical, social and emotional well-being. An average NCI-UK group session cost £220.53, 22% more than usual care, and ran for 1.5–2 h per day for 4–9 residents. No additional staff were employed to deliver NCI-UK, but staff-resident ratios were higher during Namaste Care. Usual care costs were calculated for the same time period when no group activity was organised. The average cost per resident, per NCI-UK session was £38.01, £7.24 more than usual care. In reality, costs were offset by consumables and resources being available from stock within a home.
Originality/value
Activity costs are rarely calculated as the focus tends to be on impact and outcomes. This paper shows that, although not cost neutral as previously thought, NCI-UK is a low-cost way of improving the lives of people living with advanced dementia in care homes.
Details
Keywords
Abdulkabir Opeyemi Bello, Oludolapo Ibrahim Olanrewaju, Precious Oluwatofunmi Gbenga, Ayaz Ahmad Khan and Rasheed Babatunde Isa
The adoption of emerging technologies is critical to enhance construction industry performance. Previous studies have shown that the Nigerian construction industry (NCI) is slow…
Abstract
Purpose
The adoption of emerging technologies is critical to enhance construction industry performance. Previous studies have shown that the Nigerian construction industry (NCI) is slow to adopt digital technologies and faces performance issues. As a result, this study aims to investigate and model the barriers to adopting digital twin (DT) technology in the NCI with the view to provide stakeholders with adequate information on the multifaceted nature of DT barriers and provide strategies to improve DT adoption.
Design/methodology/approach
The study adopts a qualitative and quantitative approach to achieve the overall aim of the study. The qualitative approach included a scoping review used to identify barriers to DT adoption from the literature. A five-point Likert scale questionnaire was administered to 246 construction professionals in the NCI. This was followed by critical analysis using mean ranking and standard deviation, Kruskal–Wallis, factor analysis and partial least squares structural equation modelling (PLS-SEM).
Findings
The exploratory factor analysis revealed four categories of barriers to DT adoption in the NCI: “technological and investment”, “data management and government”, “project and human resources” and “digital transformation”. The PLS-SEM results revealed the causal relationships of four barriers categories and their concomitant effects on DT adoption in the NCI. The top three barrier categories that require critical attention in order of significance are: technological and investment (ß = 0.655), data management and government (ß = 0.313) and project and human resources (ß = 0.194). Digital transformation (ß = −0.046) has the least significance. Overall, all the barriers’ categories were accepted at a significance level of p < 0.05.
Practical implications
The practical implications include guiding policymakers and practitioners in making informed decisions to address the identified barriers to DT adoption in the NCI. The findings may also be applicable to other developing countries in Africa and beyond. By implementing effective policies and stakeholder guidelines, the NCI can advance technologically and enhance its competitiveness to execute advanced construction projects.
Originality/value
This research contributes to the construction industry by shedding light on the barriers to DT adoption and their intricate interconnections within the NCI context. It is also the first study in NCI context to present the level of DT awareness and explore the concomitant effects of the barriers.
Details
Keywords
The purpose of this research is to examine why a buying firm in a marketing channel may retaliate against its supplier. The objective of this paper is thus to understand the…
Abstract
Purpose
The purpose of this research is to examine why a buying firm in a marketing channel may retaliate against its supplier. The objective of this paper is thus to understand the individual and organizational variables that may prompt a buying company to retaliate against its supplier following negative critical incidents (NCI).
Design/methodology/approach
Data was collected from 171 retailers associated with one focal manufacturer and analyzed through PLS path modeling procedures.
Findings
Results demonstrate that retaliation is the outcome of individual factors related to a buyer's cognitive (causal attributions) and emotional (anger) processes triggered by NCI as well as organizational forces (trust and dependence) related to more stable characteristics of the interfirm relationship.
Originality/value
Compared with existing contributions, the proposed model adopts a multilevel approach and considers retaliation as the outcome of individual as well as organizational forces. On the individual level, echoing the rapidly growing idea that emotions, not just cognitions, are a relevant object of study within interorganizational relationships, this paper empirically investigates the effect of one negative emotion (anger) and of causal attributions in buyer-seller partnerships. On the organizational level, this research examines the influence of trust and dependence, two central variables in business-to-business marketing theory, which seem closely related to retaliation.
Details
Keywords
Lekan Damilola Ojo, Deji Rufus Ogunsemi, Ahmed Elyamany and Ayodeji Emmanuel Oke
The adoption of value management (VM) has been on the rise in the construction industry, especially in the past decade. Identifying the main barriers to VM application for…
Abstract
Purpose
The adoption of value management (VM) has been on the rise in the construction industry, especially in the past decade. Identifying the main barriers to VM application for ameliorating poor project outcomes in the construction industry is a critical step to overcoming its implementation. Therefore, this study aims to examine the barriers to the adoption of VM in the Nigerian construction industry (NCI) and identify the critical ones for action by construction stakeholders.
Design/methodology/approach
This study used two rounds of Delphi surveys with 15 VM experts to identify the challenges to VM adoption. The Delphi team’s data from the two surveys were analysed using descriptive statistics. The mean-mode approach was used to identify ten major barriers to VM adoption based on the consensus reached during the second round of the Delphi poll. Following that, an interrater agreement analysis and a significant level analysis were performed.
Findings
Of the 17 identified barriers hindering VM adoption on construction projects in the NCI, 10 were found to be profound after statistical analyses of the data. The significant barriers include communication gap between the client and other consultants; delay in design preparation because of VM services; the pretext that VM is being practiced in the construction industry; and the wrong perception of VM by construction professionals, among others. The findings of the analysis suggested that the lack of VM adoption in the NCI was because of inadequate knowledge of VM techniques among construction professionals. Therefore, it is advised that VM training be provided for concerned stakeholders to address the lack of VM expertise among Nigerian construction professionals.
Practical implications
This study investigated the barriers to VM adoption on construction projects in the NCI with the opinions of a few construction professionals who can be regarded as VM experts. As against obtaining large survey responses from construction professionals who may not be knowledgeable in the VM process, the limited VM experts’ responses provide a valid basis for drawing inferences and making recommendations to address the paucity of VM applications in the NCI.
Originality/value
Through a Delphi survey, the critical barriers to the adoption of VM were identified, along with recommendations to help construction stakeholders overcome the challenges and enjoy the benefits of VM.
Details
Keywords
Olugbenga Timo Oladinrin and Lekan Damilola Ojo
The detrimental impacts of the construction industry activities, namely, toxicity of cement and concrete to the health of construction workers and the general public, have been…
Abstract
Purpose
The detrimental impacts of the construction industry activities, namely, toxicity of cement and concrete to the health of construction workers and the general public, have been reported in previous studies. Several environmental management measures were put in place by international organisations to reduce these impacts on humans and the entire ecosystem. Sadly, such environmental management measures are not widely embraced in the construction industry of developing countries. This contributes to the poor quality of life of construction stakeholders, amongst other outcomes. Therefore, this study investigated the drivers to facilitate an environmental management system (EMS) in the Nigerian construction industry (NCI).
Design/methodology/approach
questionnaires retrieved from construction professionals in the micro, small, medium and large enterprises were used to conduct both descriptive and inferential statistics, namely, mean score, standard deviation, Kruskal–Wallis H test, post hoc test and factor analysis.
Findings
The analyses show that the drivers of EMS implementation in the NCI could be grouped into intellectual enhancement strategies, documentation and cultural strategies, and motivation and tracking strategies. The study concluded that training and education of relevant stakeholders, tracking compliance levels of organisations and recognising firms acting in compliance with stipulated “environmental” policy are essential. It was recommended that the collaboration of all construction stakeholders be upheld to aid EMS implementation in the NCI.
Originality/value
This paper investigated the drivers of EMS with the opinions of construction professionals in the mainstream of the NCI through survey using to ensure wide coverage of respondents. Investigating the view of construction professionals in the micro, small, medium and large enterprises helped determine possible significant differences. Thus, practical implications of the study were also provided in a systematic manner.
Details
Keywords
This study aims to establish marketing practices which predict business performance of architecture firms within the Nigerian Construction Industry (NCI) to address the sustained…
Abstract
Purpose
This study aims to establish marketing practices which predict business performance of architecture firms within the Nigerian Construction Industry (NCI) to address the sustained poor business performance of firms, which affects allied professionals as many projects in the built environment depend on design proposals from architects.
Design/methodology/approach
Survey responses from 86 firms were used to model business performance measured as total revenue of the firms from 40 commonly deployed marketing practices in construction.
Findings
Two-thirds of the marketing practices most used by architectural firms were ineffective in predicting business performance. The model also explains up to half the variance in business performance (37.4–49.9%), supporting the view that marketing in the CI affects business performance. Researching client needs and competitors emerged as the only significant positive predictor of business performance (β = 0.827, p = 0.043). Using social media (β = −1.247, p = 0.004), regular participation in awards/competitions (β = −1.420, p = 0.013) and inclusion of political offers in bids (β = −1.050, p = 0.016) negatively predicted business performance.
Practical implications
Architecture and allied professional bodies in Nigeria need to rethink existing restrictions regarding marketing based on traditional code of ethics in light of present-day realities of digital and internet business environments. Principals and management of architecture firms require a paradigm shift in deploying the appropriate marketing practices, especially as it relates to research regarding changing client expectations and current competition within the NCI.
Originality/value
The study established marketing practices which model business performance and demonstrate their value in a framework for improving the financial sustainability of architecture firms within the NCI.
Details
Keywords
Nathaniel Ayinde Olatunde, Angel M. Gento, Victor N. Okorie, Olumide W. Oyewo, Modupe Cecilia Mewomo and Imoleayo Abraham Awodele
Construction 4.0 technology is a novel innovative technology that has been proved to enhance project performance. However, information on the concept's awareness, adoption…
Abstract
Purpose
Construction 4.0 technology is a novel innovative technology that has been proved to enhance project performance. However, information on the concept's awareness, adoption readiness and challenges in developing economies is still scanty. The purpose of the study is to appraise awareness, adoption readiness and challenges of Construction 4.0 technologies in Nigeria to bring to the fore the state of art of these innovative technologies in the study area.
Design/methodology/approach
The study used a convenient sampling technique to select 129 construction professionals (architects, engineers and quantity surveyors) in Osun State, Nigeria, who provided data for the study through a closed-ended structure questionnaire survey. The quantitative data supplied were analysed using frequency, percentile, Cronbach's alpha, mean score (MS) analysis and analysis of variance (ANOVA).
Findings
The overall awareness level of construction professionals in the study area about Construction 4.0 technologies is at a moderate level (MS = 3.03). The analysis of each component of the Construction 4.0 technologies shows that BIM (MS = 3.69) has the highest level of awareness, while augmented reality (MS = 2.51) has the least awareness level. More results show a significant difference in the opinion of the respondents, a significant difference in the respondents on 36% of the components of Construction 4.0 technologies. The adoption readiness of the Nigerian construction industry (NCI) to Construction 4.0 technologies is at an initial level (MS = 2.86). However, the 3D printing (MS = 3.36) and augmented reality (MS = 2.49) have the highest and lowest adoption readiness ratings, respectively. There is no significant difference in how respondents ranked the NCI adoption readiness on 73% of the components of Construction 4.0 technologies. The main challenges of Construction 4.0 technologies in the study area are lack of standardisation (MS = 4.02), lack of investment in research and development and cost of implementation (MS = 3.87) each. The result shows that there is perfect unanimity in the way respondents ranked the challenges of Construction 4.0.
Practical implications
The study provided information on the status quo of Construction 4.0 technologies in the NCI to enhance improvement in practice and the attendant project delivery.
Originality/value
The study attempted to bring to the fore the state of the art on awareness, adoption readiness and challenges of Construction 4.0 technologies in Nigeria. The study's information will be valuable to improve project delivery.
Details
Keywords
To explore the historical construction of the US broadcast television closed‐captioning system as a case study of debates over “public service broadcasting” during the late…
Abstract
Purpose
To explore the historical construction of the US broadcast television closed‐captioning system as a case study of debates over “public service broadcasting” during the late twentieth century.
Design/methodology/approach
Historical.
Findings
Neither the corporate voluntarism promoted by the FCC in the 1970s nor the “public‐private partnership” of the National Captioning Institute (NCI) in the 1980s proved able to sustain a closed‐captioning system; instead, a progressive round of re‐regulation on both the demand side (universal decoder distribution) and the supply side (mandatory program captioning) was necessary to bring the promise of broadcast equality to all deaf and hard‐of‐hearing (D/HOH) citizens.
Originality/value of paper
The decades‐long legal, technological, and institutional battle to define the “public interest” responsibilities of broadcasters toward non‐hearing viewers was fraught with contradiction and compromise.
Details
Keywords
Ifedolapo Helen Babalola, Clinton Ohis Aigbavboa, John Aliu and Ayodeji Emmanuel Oke
The workforce upon which the construction industry relies, known as human resources (HRs), faces challenges such as poor management, inadequate implementation of human resource…
Abstract
Purpose
The workforce upon which the construction industry relies, known as human resources (HRs), faces challenges such as poor management, inadequate implementation of human resource management practices (HRMPs) and psychosocial issues. This study aims to identify and assess the impact of emotional intelligence (EI) attributes on the implementation of HRMPs in the Nigerian construction industry (NCI) to enhance business performance as well as the performance and productivity of HRs.
Design/methodology/approach
A mixed-methods research design combining qualitative and quantitative approaches was used to gather expert perspectives on specific EI attributes. Data analysis involved the use of interquartile deviation, median, standard deviation, mean, Cronbach’s alpha and exploratory factor analysis (EFA).
Findings
The study identified 12 EI attributes that influenced HRMPs implementation, with 1 attribute having a very high impact (9.00–10.00) and 11 scoring high impact (7.00–8.99). Further analysis using EFA resulted in the identification of two major attribute clusters: “team relationship” and “self-management”.
Practical implications
These findings have significant implications for construction professionals, HRs and policymakers, as they address the challenges faced by construction stakeholders in terms of physical and mental well-being, which can affect their emotions while carrying out construction activities. Construction organizations should consider incorporating support systems into their policies to influence HRMPs implementation in the workplace.
Originality/value
The study provides valuable insights for developing nations such as Nigeria regarding the essential EI attributes for successful HRMPs implementation.
Details
Keywords
Godoyon Ebenezer Wusu, Hafiz Alaka, Wasiu Yusuf, Iofis Mporas, Luqman Toriola-Coker and Raphael Oseghale
Several factors influence OSC adoption, but extant literature did not articulate the dominant barriers or drivers influencing adoption. Therefore, this research has not only…
Abstract
Purpose
Several factors influence OSC adoption, but extant literature did not articulate the dominant barriers or drivers influencing adoption. Therefore, this research has not only ventured into analyzing the core influencing factors but has also employed one of the best-known predictive means, Machine Learning, to identify the most influencing OSC adoption factors.
Design/methodology/approach
The research approach is deductive in nature, focusing on finding out the most critical factors through literature review and reinforcing — the factors through a 5- point Likert scale survey questionnaire. The responses received were tested for reliability before being run through Machine Learning algorithms to determine the most influencing OSC factors within the Nigerian Construction Industry (NCI).
Findings
The research outcome identifies seven (7) best-performing algorithms for predicting OSC adoption: Decision Tree, Random Forest, K-Nearest Neighbour, Extra-Trees, AdaBoost, Support Vector Machine and Artificial Neural Network. It also reported finance, awareness, use of Building Information Modeling (BIM) and belief in OSC as the main influencing factors.
Research limitations/implications
Data were primarily collected among the NCI professionals/workers and the whole exercise was Nigeria region-based. The research outcome, however, provides a foundation for OSC adoption potential within Nigeria, Africa and beyond.
Practical implications
The research concluded that with detailed attention paid to the identified factors, OSC usage could find its footing in Nigeria and, consequently, Africa. The models can also serve as a template for other regions where OSC adoption is being considered.
Originality/value
The research establishes the most effective algorithms for the prediction of OSC adoption possibilities as well as critical influencing factors to successfully adopting OSC within the NCI as a means to surmount its housing shortage.
Details