Article
Publication date: 28 December 2023

Cláudia Rafaela Saraiva de Melo Simões Nascimento, Adiel Teixeira de Almeida-Filho and Rachel Perez Palha

This paper proposes selecting a construction project portfolio in the context of a public institution, which makes it possible to assess quantitative and qualitative criteria…

Abstract

Purpose

This paper proposes selecting a construction project portfolio in the context of a public institution, which makes it possible to assess quantitative and qualitative criteria, thereby meeting the needs of the institution and the existing constraints.

Design/methodology/approach

The research design follows a framework using technique for order preference by similarity to ideal solution (TOPSIS) associated with integer linear programming.

Findings

The method involves a flow of assessments allowing criteria and weights to be elicited where outcomes are based on the experts' intra-criteria assessment of alternatives and decision-makers' inter-criteria assessment. This is of utmost interest to public organizations, where selections must result in benefits and lower costs, integrating the experts' technical and management perspectives.

Social implications

Public institutions are characterized by having limited financial and personnel resources for project development despite having a high demand for requests not associated with profits, making it essential to have a framework that enables using multiple criteria to better evaluate the benefits related to these decisions.

Originality/value

The main contributions of this article are: (1) the proposition of a framework for selecting construction project portfolios considering the organization's strategic needs; (2) identifying quantitative and qualitative assessment criteria for project selection; (3) integrating TOPSIS with an optimization process for selecting the construction project portfolios and (4) providing a structured decision process for selecting the portfolio that best represents the interests of the institution within its limited resources and personnel.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An and Xueying Bao

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects…

Abstract

Purpose

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.

Design/methodology/approach

This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.

Findings

The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.

Originality/value

The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 November 2023

Ruizhen Song, Xin Gao, Haonan Nan, Saixing Zeng and Vivian W.Y. Tam

This research aims to propose a model for the complex decision-making involved in the ecological restoration of mega-infrastructure (e.g. railway engineering). This model is based…

Abstract

Purpose

This research aims to propose a model for the complex decision-making involved in the ecological restoration of mega-infrastructure (e.g. railway engineering). This model is based on multi-source heterogeneous data and will enable stakeholders to solve practical problems in decision-making processes and prevent delayed responses to the demand for ecological restoration.

Design/methodology/approach

Based on the principle of complexity degradation, this research collects and brings together multi-source heterogeneous data, including meteorological station data, remote sensing image data, railway engineering ecological risk text data and ecological restoration text data. Further, this research establishes an ecological restoration plan library to form input feature vectors. Random forest is used for classification decisions. The ecological restoration technologies and restoration plant species suitable for different regions are generated.

Findings

This research can effectively assist managers of mega-infrastructure projects in making ecological restoration decisions. The accuracy of the model reaches 0.83. Based on the natural environment and construction disturbances in different regions, this model can determine suitable types of trees, shrubs and herbs for planting, as well as the corresponding ecological restoration technologies needed.

Practical implications

Managers should pay attention to the multiple types of data generated in different stages of megaproject and identify the internal relationships between these multi-source heterogeneous data, which provides a decision-making basis for complex management decisions. The coupling between ecological restoration technologies and restoration plant species is also an important factor in improving the efficiency of ecological compensation.

Originality/value

Unlike previous studies, which have selected a typical section of a railway for specialized analysis, the complex decision-making model for ecological restoration proposed in this research has wider geographical applicability and can better meet the diverse ecological restoration needs of railway projects that span large regions.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 February 2023

Kai Liu, Yuming Liu, Yuanyuan Kou and Xiaoxu Yang

The mega railway infrastructure projects are faced with complex environments and multi-level management challenges. Thus, the mega railway infrastructure project management system…

Abstract

Purpose

The mega railway infrastructure projects are faced with complex environments and multi-level management challenges. Thus, the mega railway infrastructure project management system not only needs to focus on its composition, but also needs to consider changes and impacts of internal and external environment.

Design/methodology/approach

This study attempts to introduce the concept of dissipative structure from the perspective of complexity theory and constructs a positive entropy and negentropy flow index system for mega railway infrastructure project management system in order to analyze the factors of management system more deeply. The Brusselator model is used to construct the structure of the mega railway infrastructure project management system, and the entropy method is used to calculate the positive entropy and negentropy values to verify whether the management system is a dissipative structure.

Findings

A plateau railway project in China was used as an example for an empirical study, not only its own characteristics are analyzed, but also the role of constraints and facilitation of the internal and external environment. Based on the research results, several effective suggestions are put forward to improve the stability and work efficiency of mega railway infrastructure project management system.

Originality/value

This study demonstrates that mega railway infrastructure project management system has the characteristics of dissipative structure. It can provide theoretical support for the development of mega railway infrastructure project management system from disorderly state to orderly state.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 18 April 2024

Changhai Tian and Shoushuai Zhang

The design goal for the tracking interval of high-speed railway trains in China is 3 min, but it is difficult to achieve, and it is widely believed that it is mainly limited by…

Abstract

Purpose

The design goal for the tracking interval of high-speed railway trains in China is 3 min, but it is difficult to achieve, and it is widely believed that it is mainly limited by the tracking interval of train arrivals. If the train arrival tracking interval can be compressed, it will be beneficial for China's high-speed railway to achieve a 3-min train tracking interval. The goal of this article is to study how to compress the train arrival tracking interval.

Design/methodology/approach

By simulating the process of dense train groups arriving at the station and stopping, the headway between train arrivals at the station was calculated, and the pattern of train arrival headway was obtained, changing the traditional understanding that the train arrival headway is considered the main factor limiting the headway of trains.

Findings

When the running speed of trains is high, the headway between trains is short, the length of the station approach throat area is considerable and frequent train arrivals at the station, the arrival headway for the first group or several groups of trains will exceed the headway, but the subsequent sets of trains will have a headway equal to the arrival headway. This convergence characteristic is obtained by appropriately increasing the running time.

Originality/value

According to this pattern, there is no need to overly emphasize the impact of train arrival headway on the headway. This plays an important role in compressing train headway and improving high-speed railway capacity.

Details

Railway Sciences, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2755-0907

Keywords

Article
Publication date: 8 January 2024

Kavita Bhangale, Kanchan Joshi, Ruchita Gupta and Bhaskar Gardas

Project complexity (PC) governs project success, but the project management literature primarily focuses on performance measures and rarely examines the complexity factors…

Abstract

Purpose

Project complexity (PC) governs project success, but the project management literature primarily focuses on performance measures and rarely examines the complexity factors, especially for megaprojects. This paper aims to determine the most significant complexity factors for the railway megaprojects in India.

Design/methodology/approach

A mixed approach using the Delphi and best–worst method (BWM) helped to identify, validate and determine the most critical factors that require intervention to diminish variance from project performance.

Findings

The BWM resulted in stakeholder management, followed by organizational and technological complexity as significant complexity factors, and the varied interests of the stakeholder as the most important among the 40 subfactors.

Practical implications

The finding indicates the necessity for strategic, tactical and operational-level interventions to effectively manage the complexity affecting project efficiency because of the varied stakeholders. This paper will guide the project and general managers to prioritize their resources to handle complexity for effective project performance measured in terms of time, cost and quality and help them make strategic decisions. The research findings of this study are expected to help researchers and practitioners in better planning and smoother execution of projects. In addition, this study would help the researchers formulate policies and strategies for better handling of the projects.

Originality/value

This study adds significant value to the body of knowledge related to PC in megaprojects in developing countries. The result of the investigation underlined that nine complexity factors and seven unique subfactors, namely, the sustainable environment, timely availability of information, communication in both directions, interdepartmental dependency and coordination, design, statutory norms, site challenges, socioeconomic conditions, the tendency of staff to accept new technology and the frequent changes in the requirements of stakeholders are significant in railway megaprojects. The BWM is applied to rank the complexity factors and subfactors in the case area.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 25 April 2024

H.G. Di, Pingbao Xu, Quanmei Gong, Huiji Guo and Guangbei Su

This study establishes a method for predicting ground vibrations caused by railway tunnels in unsaturated soils with spatial variability.

Abstract

Purpose

This study establishes a method for predicting ground vibrations caused by railway tunnels in unsaturated soils with spatial variability.

Design/methodology/approach

First, an improved 2.5D finite-element-method-perfect-matching-layer (FEM-PML) model is proposed. The Galerkin method is used to derive the finite element expression in the ub-pl-pg format for unsaturated soil. Unlike the ub-v-w format, which has nine degrees of freedom per node, the ub-pl-pg format has only five degrees of freedom per node; this significantly enhances the calculation efficiency. The stretching function of the PML is adopted to handle the unlimited boundary domain. Additionally, the 2.5D FEM-PML model couples the tunnel, vehicle and track structures. Next, the spatial variability of the soil parameters is simulated by random fields using the Monte Carlo method. By incorporating random fields of soil parameters into the 2.5D FEM-PML model, the effect of soil spatial variability on ground vibrations is demonstrated using a case study.

Findings

The spatial variability of the soil parameters primarily affected the vibration acceleration amplitude but had a minor effect on its spatial distribution and attenuation over time. In addition, ground vibration acceleration was more affected by the spatial variability of the soil bulk modulus of compressibility than by that of saturation.

Originality/value

Using the 2.5D FEM-PML model in the ub-pl-pg format of unsaturated soil enhances the computational efficiency. On this basis, with the random fields established by Monte Carlo simulation, the model can calculate the reliability of soil dynamics, which was rarely considered by previous models.

Details

Engineering Computations, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 3 January 2023

Pengcheng Xiang, Xin Xia and Xianya Pang

The purpose of this paper is to develop a novel integrated risk assessment method from the system perspective to evaluate the risk of the cross-regional mega construction project…

Abstract

Purpose

The purpose of this paper is to develop a novel integrated risk assessment method from the system perspective to evaluate the risk of the cross-regional mega construction project (CMCP). Furthermore, this paper aims to confirm the core risk source factors and refine the risk management strategies of CMCPs through a case study.

Design/methodology/approach

Based on the analysis of the risk system of CMCPs, the concept model and risk assessment principles of integrated risk assessment were confirmed. The risk source factors and project objectives of the CMCP were identified from a literature review, export interview and case analysis. According to the vulnerability theory, the integrated risk assessment model was developed by involving vulnerabilities, threats, objectives and interaction of those factors synthetically. Then, ZW high-speed railway from China was analyzed to verify the feasibility and effectiveness of the proposed method.

Findings

As a result, 12 threat factors and 12 vulnerability factors were identified. Based on the case study, the main external threat comes from T13 (conflicts of interest between local governments) and T23 (harsh natural environment); the most easily exploited internal vulnerabilities were V11 (complexity of technology), V13 (lack of experience in technical application), V21 (inadequate experience) and V23 (lack of interest coordination mechanism). Moreover, the economic objective was most affected.

Practical implications

It is essential to develop an interest coordination mechanism for CMCPs. The harsh natural environment is a critical factor, but it also promotes technological innovation and iteration. Public opinions in different regions are critical for CMCPs, and more emphasis should be placed on public opinion surveys of CMCPs. Moreover, diverse and flexible environmental protection strategies should apply in CMCPs.

Originality/value

This research has the following three contributions. First, based on vulnerability theory, an integrated risk assessment approach of CMCPs is developed, which enriches the risk measurement method system and provides inspiration for future research on risk in the construction industry. Second, the risk sources of CMCPs are identified from the perspective of vulnerability and threat to provide clear guidance for the risk management of CMCPs. Third, the core risk source factors and management strategies confirmed by the case study will be beneficial for various governments in different regions and project managers to optimize the project management scheme, as they are transferable management experiences.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 November 2023

Udoka Okonta, Amin Hosseinian-Far and Dilshad Sarwar

With the rise in demand and adoption of smart city initiatives, it is imperative to plan the railway infrastructure, as it will have a huge positive impact if adequately…

Abstract

Purpose

With the rise in demand and adoption of smart city initiatives, it is imperative to plan the railway infrastructure, as it will have a huge positive impact if adequately integrated into the planning process. Given the complexities involved, a whole systems thinking framework provides a useful platform for rail transport planners.

Design/methodology/approach

This paper proposes a simple, adoptable framework utilising systems thinking concepts and techniques taking into cognisance the key stakeholders. Milton Keynes in the United Kingdom is the adopted case study.

Findings

Selected systems thinking tools and techniques are adopted to develop a framework for mapping stakeholders and attributes when developing sustainable rail transport systems, taking note of their core functionalities and the complex systems wherein they exist.

Practical implications

The desire to build future (smart) cities is to effectively match infrastructural resources with a rapidly growing population, and the railway sector can play a strategic role in building a much more competitive low-carbon-emission transport system, which is a driving force for sustainable development.

Social implications

The urban rail service has become vital to urban development as railway stations serve as hubs for sustainable mobility to meet local requirements. Moreover, it takes extra effort to input railway development into smart city plans, as it is a herculean task to get governments to focus on it with clarity of purpose in passing legislation.

Originality/value

The developed framework reduces complexities when planning and designing rail transport systems compared to many of the existing reductionist planning approaches. The simplicity of the framework would also make it easily adoptable by a wide range of users.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 2 April 2024

Paulo Alberto Sampaio Santos, Breno Cortez and Michele Tereza Marques Carvalho

Present study aimed to integrate Geographic Information Systems (GIS) and Building Information Modeling (BIM) in conjunction with multicriteria decision-making (MCDM) to enhance…

Abstract

Purpose

Present study aimed to integrate Geographic Information Systems (GIS) and Building Information Modeling (BIM) in conjunction with multicriteria decision-making (MCDM) to enhance infrastructure investment planning.

Design/methodology/approach

This analysis combines GIS databases with BIM simulations for a novel highway project. Around 150 potential alternatives were simulated, narrowed to 25 more effective routes and 3 options underwent in-depth analysis using PROMETHEE method for decision-making, based on environmental, cost and safety criteria, allowing for comprehensive cross-perspective comparisons.

Findings

A comprehensive framework proposed was validated through a case study. Demonstrating its adaptability with customizable parameters. It aids decision-making, cost estimation, environmental impact analysis and outcome prediction. Considering these critical factors, this study holds the potential to advance new techniques for assessment and planning railways, power lines, gas and water.

Research limitations/implications

The study acknowledges limitations in GIS data quality, particularly in underdeveloped areas or regions with limited technology access. It also overlooks other pertinent variables, like social, economic, political and cultural issues. Thus, conclusions from these simulations may not entirely represent reality or diverse potential scenarios.

Practical implications

The proposed method automates decision-making, reducing subjectivity, aids in selecting effective alternatives and considers environmental criteria to mitigate negative impacts. Additionally, it minimizes costs and risks while demonstrating adaptability for assessing diverse infrastructures.

Originality/value

By integrating GIS and BIM data to support a MCDM workflow, this study proposes to fill the existing research gap in decision-making prioritization and mitigate subjective biases.